Objective
To apply as a Sr. Plumbing Engineer. Be a part of company’s mission in fulfilling its duties and responsibilities in putting, conducting and constructing projects for the service of God and people.
Summary of Qualifications
Has a Master of Science in Sanitary Engineering
A licensed Civil Engineer
A licensed Sanitary Engineer
Has 19 years of experiences in Sanitary /Plumbing, Fire Protection ,Water Supply/Sewerage and Civil Works
Can do cost estimates, bill of quantities, quotation and detailed proposal for the project
Able to supervise, monitor, control and manage the project
Can do detailed design for plumbing / sanitary works
Can do feasibility studies and design for water supply/sewerage projects
Can participate in conferences and assist in other technical works that will be assigned by immediate supervisors
EDUCATIONAL BACKGROUND
Master of Science in Sanitary Engineering-
Date of Graduation: March 2005
Name and Address of the Institution: National University, Sampaloc, Manila, Philippines
Bachelor of Science in Sanitary Engineering
Date of Graduation: March 1989
Name and Address of the Institution: National University, Sampaloc,Manila, Philippines
Bachelor of Science in Civil Engineering
Date of Graduation: March 1987
Name and Address of the Institution: National University, Sampaloc, Manila, Philippines
PROFESSIONAL REGISTRATION
Registered Sanitary Engineer
License No. 1432 ( Registered on Philippine Regulation Commission-PRC)
Registered Civil Engineer
License No. 63326 ( Registered on Philippine Regulation Commission-PRC)
SPECIAL TRAININGS ATTENDED
Training in Computer Aided Sprinkler Design held on June 19 up to July 24, 2010 at CADVISION Engineering Technologies, Recto Avenue, Manila City
Training in Pollution Control Officers Training Course held on June 29 up to July 2, 2010 at CADVISION Engineering Technologies, Recto Avenue, Manila City
Training in Computer Aided Structural Design (STAAD) held on March.24 up to March 28, 2008 at CADVISION Engineering Technologies, Recto Avenue, Manila City
Training in AUTOCADD 2004/06 held on Feb.25 up to March 11, 2008 at CADVISION Engineering Technologies, Recto Avenue, Manila City
SEMINARS ATTENDED
Technical Seminar in Public Health/Environmental Engineering held on March 08, 2003 at the Audio Visual Room, National University
Technical Seminar in Solid Waste Management (Clean and Healthy Environment Towards the New Millennium Part II) held on Nov. 25-26, 1999 at the Embassy Ballroom Traders Hotel
Technical Seminar in Solid Waste Management (Clean and Healthy Environment Towards the New Millennium Part I) held on July 22-23, 1999 at the AFP Commissioned Officers Club, Camp Aguinaldo, Q.C.
Technical Seminar in Planning, Design, Construction and Operation of Water Supply held on March 14, 1998 at Reed Steel Fabricator’s Inc. Brgy. Tikay, Malolos, Bulacan
Technical Seminar in Infrastructure Development in Bulacan Together with High Rise Building Design and Construction held on Sept. 27 and Oct. 04, 1997 at Reed Steel Fabricator’s Inc. Brgy. Tikay, Malolos, Bulacan
Technical Seminar in Water Crisis Act & Vision of Water Agency and Build Operate Transfer of Water Supply & Sewerage Projects held on March 18, 1996 at Sulo Hotel, Diliman Quezon City
Technical Seminar in Plumbing Engineering for High Rise Structures held on March 27, 1992 at Technological Institute of the Philippines
PROFESSIONAL EXPERIENCES
SENIOR SANITARY / CIVIL ENGINEER
Sept. 2010 - Present
Trans-Asia Philippines, inc.
10th Floor Pacific Center, 33 San Miguel Ave.
Ortigas Center Pasig City, 1605 Philippines
Duties and Responsibilities:
Review design documents issued by client and conceptualize design where necessary, for the required civil works/plumbing systems based on Project & Client requirements and standards as well as international governing codes as stipulated in the project scope of work. Responsible in the preparation of design analysis and calculations, technical specifications and design drawings/details for the proposed project. Responsible also for supervision and monitoring support staffs to ensure compliance on the required quality and on-time delivery, for the completeness and accuracy of design calculations, drawings, technical specifications and other necessary documents required for the project and facilitate coordination with other discipline to ensure quality of work for interfacing with other trades requirements. Coordinate with support staffs or attend design reviews as well as coordination meetings with clients as may deem necessary. Attend design reviews as well as coordination with support staffs, co-engineers and senior engineer or project manager as may deem necessary.
Projects Design Undertaken:
1) Orchard Project Phase 2
Balayan, Batangas
2) Pioneer Project
Tarlac City
3) Anya Project
Tagaytay City
PLUMBING ENGINEER AND HEAD OF THE PLUMBING SECTION
October 2008 - June 2010
ROKO CONSTRUCTION LTD.
P.O Box 172 Kampala, Plot 160 A Bombo Road Kawempe, Kampala Uganda
Projects Undertaken:
1) Centenary Rural Development Bank
Kampala , Uganda, Africa
2) Serena Hotel
Kigali, Rwanda, Africa
3) USAID
Sudan, Africa
Duties and Responsibilities:
Rendered close supervision, monitoring, and control of plumbing /sanitary and fire protection works making sure that they conform with the accepted standard & specifications. Estimating the required material needed in the project and control the quality of material to be install prior to specification. Performed quality evaluation and assessment of material and workmanship. Prepared bar chart and actual project implementation. Coordinate with other discipline on site to maintain the smooth flow of work . Attends coordination meetings and implements safety measures at site.
PLUMBING & DRAINAGE AND FIRE PROTECTION DESIGN ENGINEER
June 2008 - Oct. 2008
One Zone Asia (Phils.) Inc.
2401 Antel Global Corporate Center, # 3 Dona Julia Vargas Avenue, Ortigas Center, Pasig City
Duties and Responsibilities:
Responsible for plumbing & drainage and fire protection designs, specifications and calculations. Manage the plumbing & drainage and fire protection elements of the projects. Formulate reports, letters, audits relevant to the work. Check and correct plumbing & drainage and fire protection cad drawings prior to issue to the client. Attend all relevant client meetings. Liaise and coordinate with other disciplines of the design teams. Formulate design work program and manage and control outputs accordingly. Manage and control outputs in accordance with the design work program.
Project Design Undertaken:
1) Children’s Discovery Centre
Damascus, Syria
2) Dubai Metro Project - Greenline
Dubai, UAE
PROJECT EMPLOYEE (PROGRAM MANAGEMENT ENGINEER B)
June 2007 - February 2008
Maynilad Water Services, Inc.
MWSS Compound, Katipunan Road, Balara, Quezon City
Duties and Responsibilities:
Prepared engineering designed on water supply & sewerage projects. Prepared quantity take-off and bill of materials for the projects. Conduct value engineering. Checked and review shop and working drawings. Conduct technical evaluation of products and equipment. Conduct technical studies and assistance. Performed other technical works assigned by immediate supervisor.
Project Undertaken:
1) Improvement of Water Supply Distribution Project (IWSDP) Metro Manila
PLUMBING ENGINEER AND HEAD OF THE PLUMBING SECTION
February 2006 - January 2007
ROKO CONSTRUCTION LTD.
P.O Box 172 Kampala, Plot 160 A Bombo Road Kawempe, Kampala Uganda
Projects Undertaken:
1) US (American) EMBASSY
Nsambya, Kampala Uganda
2) PROPOSED OFFICE BLOCK & AYA BISCUIT LINE PROJECT
Kawempe, Kampala Uganda
Duties and Responsibilities:
Rendered close supervision, monitoring, and control of plumbing /sanitary and fire protection works making sure that they conform with the accepted standard & specifications. Estimating the required material needed in the project and control the quality of material to be install prior to specification. Performed quality evaluation and assessment of material and workmanship. Prepared bar chart and actual project implementation. Coordinate with other discipline on site to maintain the smooth flow of work . Attends coordination meetings and implements safety measures at site. Performed other technical works assigned by immediate supervisors.
SANITARY ENGINEER / INSPECTOR
July 16, 2005-January 16, 2006
PHILIPPINE TOWNSHIPS INC.(Subsidiary of RFM Corporation)
6/f RFM Corporate Center corner Pioneer & Sheridan St
Mandaluyong City, Philippines
Project Undertaken:
FAIRWAYS TOWER-30 STOREY BLDG.
Bd. Lot 1, Block 12 FBDC Compound Fort Bonifacio, Taguig Metro, Manila,Phil.
Duties and Responsibilities:
Conduct full-time inspection of plumbing/sanitary , fire protection and civil works to ensure compliance with plans, specifications and other contracts requirements. Review and monitor schedules and report work delay and require contractors to catch-up the program. Assists the contractor in interpreting drawings, specifications and others in the contract document and resolve conflict on technical matters.. File all transmittal papers, progress reports, change orders plans, material test results, shop drawing and other contract document. Prepare and issue site instructions to the contractor. Verify and audit progress billings of the contractor. Ensure that construction materials on site conforms to the design standard . Prepare a punch list of agreed incomplete and/or defective works and follow-up corrective actions taken . Verify and approved “ as-built” drawings. Turn over all projects documentation to the client.
SANITARY ENGINEER
September 19, 2002-July 10, 2005
HILMARCS CONSTRUCTION CORPORATION
1835 E. Rodriguez Sr. Ave. Cubao, Quezon City Philippines
Project Undertaken:
JOYA ROCKWELL-42 Storey Condominium Bldg.,
Rockwell Center, Makati City
Duties and Responsibilities:
Prepared detailed design on plumbing and sanitary works. Signed and sealed plumbing /sanitary plans. Prepared quantity take-off and bill materials for cost estimate in plumbing/sanitary, fire protection and civil works. Prepared and evaluated change order and other revision in the approved plans and specifications. Rendered close supervision, monitoring, and control of plumbing /sanitary and fire Protection Works making sure that they conform with the accepted standard specifications. Estimating the required material needed in the project and control the quality of material to be install prior to specification. Performed quality evaluation and assessment of material and workmanship. Prepared bar chart and actual project implementation. Coordinate with other discipline on site to maintain the smooth flow of work . Attends coordination meetings and implements safety measures at site. Performed other technical works assigned by immediate supervisors.
SR. SANITARY ENGINEER
June 11 1997 - May 31, 2002
ADRIAN WILSON INTERNATIONAL ASSOCIATES, INC.
AWIA Office corner of Sinag and Libertad St. Mandaluyong City, Philippines
Projects Undertaken:
PHILIPS SEMICONDUCTOR--PSC Phase II, Calamba, Laguna, Philippines
Duties and Responsibilities:
Prepared detailed design on plumbing and sanitary works. Signed and sealed plumbing and sanitary plans. Conduct full-time inspection of plumbing / sanitary, fire protection and civil works to ensure compliance with plans, specifications and other contracts requirements. Review and monitor schedules and report work delay and require contractors to catch-up the program. Assists the contractor in interpreting drawings, specifications and others in the contract document and resolve conflict on technical matters.. File all transmittal papers, progress reports, change orders plans, material test results, shop drawing and other contract document. Prepare and issue site instructions to the contractor. Verify and audit progress billings of the contractor . Ensure that construction materials on site conforms to the design standard . Prepare a punch list of agreed incomplete and/or defective works and follow-up corrective actions taken . Verify and approved “ as-built” drawings. Turn over all projects documentation to the client.
Projects Undertaken:
Six (6) WATER DISTRICTS OF BULACAN:
Balagtas Water District, Bocaue Water District, Bulacan Water District, Meycauayan Water District, Obando Water District, Sta. Maria Water District
Duties and Responsibilities:
Prepared detailed feasibility study of water supply project which is under study. Gathered data/information needed for the study area. Conducted surveys @ socio-economic and hydro surveys. Conducted inspection of existing waterworks facilities. Prepared maps, table and figures regarding the project. Prepared network analysis, write-ups and reports about the study area. Performed other technical works assigned by immediate supervisor.
SANITARY ENGINEER
April 1996-April 1997
KURIHARA-THANG LONG J.V. CO. LTD.
B4B, 77B KIM MA BA DINH, HANOI, VIETNAM
Project Undertaken:
Hanoi Hotel Extension, 18th Storey Hotel
D8 Giang Vo, Badinh District Hanoi, Vietnam
Duties and Responsibilities:
Rendered close supervision, monitoring and control of plumbing / sanitary and fire protection works to ensure that they conform with the accepted and standard specification. Estimated the required materials needed in the project and control the quality of material to be install prior to specification. Performed quality evaluation and assessment of materials and workmanship. Prepared bar chart and actual project implementation. Coordinated with the architect and inspector s for the revision, change orders and other alteration in the approved plans in a course of actual implementation. Coordinate with other discipline on site to maintain the smooth flow of work. Attends coordination meetings and implement safety measures at site. Performed other technical works assigned by the immediate supervisors.
ESTIMATOR
November 1994-April 1996
HILMARC’S CONSTRUCTION CORP.
1835 E. Rodriguez Sr. Ave. Cubao, Quezon City, Philippines
Duties and Responsibilities:
Prepared quantity take-off and bill of materials for cost estimate in plumbing/sanitary, fire protection and civil works. Prepared and evaluated change order and other revisions in the approved plans and specifications. Evaluated and certified all accomplishments , billings and other monetary documents prior to the approval and payment. Soliciting quotations from material and equipment suppliers and subcontractors. Prepared bar chart and forecast project cash-flow which includes all operating expenses .
PROJECT ENGINEER
October 1993-August 1994
ABDULLAH B. ALKHALIFA & SONS CO.
P.O Box 1991, Dammam 31441
Kingdom of Saudi Arabia
Project Undertaken:
PETROKEMYA HOUSING PROJECT
Jubail, Kingdom of Saudi Arabia
Duties and Responsibilites:
Rendered close supervision in plumbing and sanitary works to ensure that all works were done according to approved plans and specifications. Prepared quantity and cost estimates for the project. Responsible for the manpower required by the project and controlled the quality of materials installed prior to specifications. Coordinated with other discipline to ensure that project schedule time required are executed in accordance with the establish procedures. Monitor the works progress and prepared field operations report. Assisted the consultant during inspection of works. Conducted daily safety check on workers and work areas. Performed other technical works assigned by the immediate supervisors.
PROJECT ENGINEER / ESTIMATOR
April 1989-November 1992
JOUBERT CONSTRUCTION INC.
2564-A. Manggahan St. Guadalupe, Makati, Metro Manila, Philippines
Project Undertaken:
1) MAKATI SHANGRILA-HOTEL-28th Storey Hotel Bldg.
Ayala Ave cor. Makati Ave, Makati, Metro Manila Philippines
2) BEL-AIR PLACE-7TH Storey Condominium
Bel-air, Makati, Metro Manila Philippines
Duties and Responsibilities:
Prepared detailed estimates and costing/ rendered close supervision, monitoring and control of plumbing, fire protection and civil works. Prepared and evaluated change order or additional works for ongoing projects. Monitored the work progress and prepared operation reports. Checked and implemented cost consciousness and applied cost control to project materials while attaining production trade. Coordinated with other discipline to ensure that the required project’s time are executed in accordance with established procedures. Prepared progress billing for ongoing project. Participated in bidding conferences.