Glend A. Pecayo
*** ****.****, *******, ******
***********@*****.***
Contact # 092********/091********
OBJECTIVE
To be able to work in your firm and establish a career where my acquired knowledge and skills will be utilized and further enhance.
PERSONAL INFORMATION
Date of birth : October 29, 1983
Place of birth : Calamba Laguna
Age : 26 yrs old
Civil status : Married
Height : 5’6”
Weight : 58kgs.
Religion : Roman Catholic
Language Spoken : Tagalog, English
Fathers Name : Francisco B. Pecayo
Occupation : Deceased
Mothers Name : Gloria A Pecayo
Occupation : House Wife
Address : Brgy. Tulo Calamba, Laguna
SPECIAL SKILLS
-Computer literate (Microsoft Excel & Word)
-Can Operate Testing Equipment for Transformer
-Knowledgeable in Substation Maintenance.
-Knowledgeable in Transformer Standard testing during manufacturing process.
-Knowledgeable in different process in producing Transformer.
-Welding(Tig/Arc)
Other Skills
Forklift operator
Driving
Educational Background
College : Dualtech Traning Center
Canlubang ,Calamba,Laguna
Electro Mechanics ( course)
2000 to 2002 (year graduated)
Secondary : St.Thomas Academy
Sto. Tomas Batangas
1996 to 1999 (year graduated)
Elementary : Tulo Elementary School
Calamba Laguna
1990 to 1996 (year graduated)
WORK EXPERIENCE
FEDCOR
First Electro Dynamics Corporation
(a subsidiary of First Philippine Holdings Corporation)
Factory Site: Marketing Site:
First Street. First Philippine Industrial Park 2nd floor, Benpres Building
Tel. Nos.: (043-***-**** to 73 Exchange Road, cor.Meralco ave.
Telefax No.: (043-***-**** Pasig City, Philippines 1600
DT and Compad Internal Assembly section
December 2002 up to November 2005
- Perform Tap Changer assembly.
- Perform Lacing of core to wound coil.
- Responsible for bonding of wound coil.
- Disassembly and Assembly
- Oil filling and draining
Winding Section
November 2005 up to December 2006
- Responsible on Primary and Secondary winding.
- Ensure number of turns based on engineering data
- Troubleshooting of winding Machine against number of turns.
Quality Assurance Section
December 2006 up to October 2008
- Testing of Transformer as follows:
1. Distribution Transformer
2. Compad (Compartmentalize Transformer)
3. Power Transformer
Test Conducted:
1. Transformer Turns Ratio Test
2. Insulation Resistance Test
3. Winding Resistance Test
4. Insulation Power Factor Test
5. No Load Loss Test
6. Load Loss Test
7. Induced Potential Test
8. Oil Dielectric Breakdown Voltage
- Prepare Final test report.
- Inspection of units for delivery.
MATCO
MOHHAMED AL- OJAIMI TRANSFORMER COMPANY
Factory Site:
Al Kharj Road
Kingdom of Saudi Arabia
Tel.# +966-*-*******
Fax# +966-*-*******
Fax# +966-*-*******
Email Address. www.oig-sa.com
Quality Assurance Section
November 2008 up to December 2009
- Testing of Transformer
Test Conducted:
1. Transformer Turns Ratio Test (Vanguard)
2. Insulation Resistance Test (megger)
3. Winding Resistance Test (raytech)
4. Applied Potential Test (Phenix)
5. No Load Loss Test (Phenix)
6. Load Loss Test (Phenix)
7. Induced Potential Test (Phenix)
8. Oil Dielectric Breakdown Voltage (megger)
9. Temperature Rise Test (Phenix)
SEMINARS AND TRAINING ATTENDED
September 08, 2004 Work Attitude and Values Enhancement Program
FEDCOR- Sto. Tomas Bats.
March 14, 2008 Protective Relaying and Substation Maintenance
FEDCOR- Sto. Tomas Bats.
April 12, 2008 Defensive and Better Driving Course FEDCOR- Sto. Tomas Bats.
September 08, 2007 Shielded Metal Arc Welding
Character Reference
Engr. Ronald Baracinas Quality Assurance Supervisor
First Electro Dynamics Corporation
1st St., FPIP, Sto. Tomas, Batangas
John James Vitan QA and Engineering Manager
First Electro Dynamics Corporation
1st St., FPIP, Sto. Tomas, Batangas
Engr. Arnold Domingo QA and Design Engineer
First Electro Dynamics Corporation
1st St., FPIP, Sto. Tomas, Batangas