Dedicated Mechanical Engineer eager to contribute exceptional project management, quality control, and team leadership expertise toward supporting a dynamic employer in optimizing performance and productivity.
Profile
Offering 40+ years of experience in mechanical project execution and maintenance in cement industry, polyethylene plants, oil & refineries, gas plants, steel plants and power plants.
Extensive experience in pipe fabrication and installation (i.e. refineries, power plants, chemical & polyethylene plants, and gas transfer lines)
Adept at cement plant erection, commissioning, and maintenance.
Extensive experience in structural steel erection (i.e. cement plant pre-heater tower, raw mill structures, steel plant storage furnace feed bunkers and supporting steel, pipe racks for oil refineries, gas plants and power plants, steel for sulfur recovery plants, and ethylene plants).
Substantial skills in equipment erection including heaters, heat exchangers, reactors, condensers, pumps, coolers, boilers, turbines, storage tanks, kiln, gas condition towers, cyclones, hoppers etc.
Adhere to ASME codes and project specifications in fabricating and installing pipe and pipe supports.
Excel in project status monitoring, cost control, team leadership, safety compliance, and quality control.
Significant experience in directing painting, refractory, fireproofing and thermal insulation activities as well as full-scope refractory installation.
MSHA Certified Miner and Approved QC Inspector.
Proficient in devising major shutdowns schedules, organizing manpower, allocating equipment, conducting comprehensive inspections, and facilitating final box-up.
Professional Experience
E-Technology, 2023 to 26th June 2026.
Civil / Structural Steel and Fireproofing & Refractory QC/QA Inspector
I am working as QA/QC inspector for Civil, Steel and Fireproofing for GTP OSPL project at Orange TX.
1.Inspection of Civil work including excavation, Backfilling, forms and rebar inspection / FDN bolts and concrete for entire unit.
2.Inspection of pipe racks / Structural steel and Steel Building installations.
3.Inspection of Fireproofing of equipment saddles, skirts and structural steel block outs.
Advantage Technical Services, 2022 to 2023
Civil / Structural Steel / Painting / Insulation / Fireproofing & Refractory QC Inspector
Working as QA/QC inspector for Civil, Structural Steel, Painting, Insulation and Fireproofing for entire C3 Splitter project at Ceder Bayou project at CPChem Baytown facility.
Handling all departments along from beginning to pre-commissioning.
Zachry 2021
Welding / Painting and Insulation QC Inspector
Working as QC inspector for welding, i.e., field welds of pipes and structural pipes support for LyondellBasell’s Channel view complex.
Inspection of painting i.e., field welds of pipes, structural steel coating, repair of Galvanized steel, coating of valves and pipe supports.
Inspection of insulation installation, i.e., Cryogenic (Both equipment’s and pipes), Hot (Both equipment’s and pipes, Cold acoustic pipes, Hot acoustic pipes, and Acoustic pipes
CBI Zachry JV (EPC Contract) 2018 – 2020
Painting / Insulation & Fireproofing QC Inspector
Working as QC inspector for painting, i.e., field welds of pipes, structural steel coating, repair of Galvanized steel, coating of valves and pipe supports for Freeport LNG project.
Inspection of insulation installation, i.e., Cryogenic (Both equipment and pipes), Hot (Both equipment and pipes, Cold acoustic pipes, Hot acoustic pipes and Acoustic pipes
Inspection of fireproof installation, i.e., Both equipment’s skirts and structural steels
Bureau Veritas Services, Inc., 2015 to 2017
Painting / Insulation / Fireproofing & Refractory QC Inspector
Performed broad-based project functions as member of CPChemicals initiative for Sweeny Polyethylene project in Texas.
Inspected pipes and structural steel painting, thermal insulation on equipment and pipes, fireproofing of steel structure and equipment’s and refractory installation of furnace and VDU.
Performed broad-based project functions as member of CPChem initiative for Baytown Ethane Cracker project in Texas.
Peak Technical Services, Inc., 2008 to 2014
Field Installation Engineer, Integral team member in 3000 TPD Kiln new line installation of Margam cements at Adriano polis, Brazil for FLSmidth, Allentown, Pennsylvania. Installation of Cross bar cooler (CB 10 X 40 HRB), Rotary kiln rotex-2 (4.35 X 51 M long) and part of preheater tower.
Field Installation Engineer, Integral team member in 7000 TPD Kiln modernization line installation of Cemento Lima at Lima, Peru for FLSmidth, Allentown, Pennsylvania. Installation of multi-movable cooler (MMC 18 X 87 w HRB) and Tertiary air duct
Field Installation Engineer, Integral team member in 600 TPD Kiln new line installation of Cemento San Marcos at Cali, Colombia for FLSmidth, Allentown, Pennsylvania. Installation of multi-movable cooler with HRB including Fans
Field Installation Engineer, Integral team member in 5000 TPD Kiln line major shutdown work at MMC cooler with HRB and part of Vertical Raw mill & Coal mill liners replacement of Cemento Argos at Cartagena, Colombia for FLSmidth, Allentown, Pennsylvania.
Field Installation Engineer Integral team member in 4200 TPD Kiln line modernization of Cemento Yura at Arequipa, Peru for FLSmidth, Allentown, Pennsylvania. Installation of multi-movable cooler (MMC 12 X 85 w Clinker Crusher) including fans, 5-Stage ILC- Calcining System and raw meal silo. Demonstrate keen attention to detail and efficiency in performing interconnecting process ducts, feed chutes and hydraulic pipes and tubes for cooler.
Integral team member in 3500 TPD Kiln line modernization of Keystone Cements at Bath, Pennsylvania for FLSmidth, Allentown, Pennsylvania. Supervision of Installation of rotary kiln rotax-2 (4.35 X 56.0 long), multi-movable cooler (MMC 11 X 73 w Mid HRB), 5-Stage SLC-D Calcining System, exhaust gas condition tower and bypass gas condition tower. Demonstrate keen attention to detail and efficiency in performing installation of bag houses for bypass system and cooler, process fans, interconnecting process ducts, feed chutes, de-dusting ducts and hydraulic pipes and tubes for cooler & HRB at Keystone Cements at Bath, Pennsylvania
Bechtel-Technip Joint Venture (EPC Contract), 2006 to 2008
Painting/Insulation & Refractory QA Inspector
Performed broad-based project functions as member of Khursaniyah Gas plant initiative for Saudi Aramco in Eastern province of Saudi Arabia.
Inspected pipes and structural steel painting, thermal insulation, and refractory installation of reactors, condensers, reaction furnace, heaters, thermal oxidizer, and stack in sulfur recovery project.
Technip (EPC Contract), 2003 to 2006
Painting/Insulation & Refractory QC Supervisor
Supervised painting, insulation, and refractory installation at Berri Gas plant project for Saudi Aramco.
Seamlessly coordinated pipe erection groups steered consistent compliance with Saudi Aramco standards and oversaw client correspondence and liquidation of punch items.
Consolidated Contractors Company, 2003
Piping Supervisor
Expeditiously prepared fabrication schedules and coordinated pipe installation for Qatar Fertilizer Company revamping project in Qatar.
Mid-East Constructors, 2002 to 2003
Mechanical Superintendent
Proficiently prepared pipe and pipe supports fabrication and installation schedules for plant modernization/QGPC expansion project at Dukhan in Qatar.
Formulated structural steel and mechanical equipment installation.
Reports, conducted post-weld heat treatment, performed blasting, painting and thermal insulation, and allocated heavy erection equipment.
Mecon-National Kharafi joint venture, 2001 to 2002
Mechanical Superintendent
Spearheaded plant modernization project including additional sulfur recovery unit with new stack, new pipe racks, one sulfur storage tank, one fire water tank and pipes, and steel structures for Qatar gas (QGPC) expansion project at Ras-Laffan in Qatar.
Held accountability for preparing pipe and pipe supports, pipe spool tracking, structural steel and mechanical equipment installation schedule, and coordination with NDT.
Exercised sharp multi-tasking expertise to facilitate heat treatment of welds (PWHT), blasting and painting, thermal insulation, and supervision of fabrication and erection of Glycol dye Amine Storage tanks.
Directed and supervised safe, compliant, and efficient refractory installation on tail gas incinerator.
Fabtech – Murray & Roberts joint venture, 1999 to 2001
Project Engineer
Installed 5-stage pre-heater, multi-movable cooler and exhaust gas ducts and its supporting structural steel, process fans, and chutes for 3000 TPD Kiln line modernization of Kuwait Cement at Shuaiba.
Championed on-time installation of Ship Unloader (MVT) with 1.6 miles of conveyor belt and transfer towers, stacker, and reclaimer (BEUMER, longitudinal storage) with belt conveyors, and deep bucket conveyor from cooler to Clinker.
Merz and McLean Consulting Engineers, 1996 to 1999
Mechanical Inspector
Meticulously inspected incoming raw materials and fabricated components for 8X300 MW power project at Shabiya, Kuwait comprised of 8nos. Mitsubishi re-cycle boilers, 8nos. Mitsubishi steam generators, 6nos. fuel storage tanks, 6nos. make up water tanks, pump house, comprehensive steel structure, and pipe racks.
Steered quality assurance of pipe fit ups, welding, steel structures, and pump alignments.
Compiled reports and punch list as per MEW (Ministry of Electricity and Water) specifications.
Prior Background:
Piping Supervisor, Al-Suwaidi Est., Saudi Arabia, 1995 to 1996
Mechanical Supervisor, Al Jalhami Trading and Contracting EST, Saudi Arabia 1993 to 1994
Project Engineer, Petron Engineering Construction Ltd., India 1985 to 1993
Education
University of Kerala – State Board of Technical Education, Kerala, India
Diploma in Mechanical Engineering
Junior Technical School Certificate in Welding
Professional Development / Specialized Training
Merz and McLellan Consulting Engineers:
Procedure and Drawing Approvals
Surveillance inspection
Construction problems
Nondestructive testing (introduction, defect definition, spectrographic testing, hardness testing, and MPI and DPI techniques)
Operator approvals
Post-weld heat treatment
NACE Coating Inspector Level 2, NACE International
Certified Welding Inspector, American Welding Society
SSPC Insulation Inspector
SSPC Fireproof Inspector
TWIC Card holder
Affiliation
Member of American Welding Society
Member of NACE International
Mathew Cherian
5103 Sunset Oaks Drive, Arcola, TX-77545
Phone: 516-***-****
************@*****.***