Adolph Karubanga, PMP
Resident Civil/Structural Engineer
MSc. Structural Engineering
600MW Karuma Hydropower Project Construction
*********.*********@*****.***
KAMPALA- UGANDA (EAST AFRICA)
Certification: Project Management Professional, PMP- No. 2645102 Professional Affiliations
• Uganda Institution of Professional Engineers
• Project Management Institute (PMI)
• Institution of Civil Engineers, UK- (ICE-UK)- Membership No. GM 93786644 Projects: Karuma Hydropower project 600MW, Isimba Hydropower Project, 183MW, Ayago (860MW), Kiba (398MW), and Oriang (380MW).
Factory Acceptance Test, FATs for Karuma Hydropower project in China and India factories and laboratories. Education, Kampala Uganda
Relevant Professional Experience
Project: Construction of the 600MW Karuma Hydropower Project in Uganda Position: Resident Civil/Structural Engineer
Organization: Ministry of Energy and Mineral Development, Period: April 2015 to June 2025 Project Description:
The 600MW MW Karuma Hydropower Project located in Uganda (East Africa) was commissioned in 2024. The project was structured as an EPC Contract with the following teams: Sinohydro Corporation (EPC Contractor), Power China (EPC Designer), OE, PMC, government Implementing agencies, and International Panel of Experts (PoE) for surface and underground structures. More than 70% of the project’s structures are located 80m underground.
Project Salient Features include: 60m design head, Six (6) Francis Turbine Generating units, 314m RCC dam, Power intake, underground structures (Main Powerhouse, Main Transformer Cavern, and Tailrace Surge chamber, 17 km Hydraulic Water Conveyance system comprising the Horse-shoe-Concrete Tunnel Lined Structures (HRT, and 2No. TRT)); GIS, 3No Double Circuit Transmission lines and 4No. Substations, two (2) Automatic concrete batching plants, two (2) Aggregate crushing plants and a Cooling Plant. Period Institution Qualification CGPA
2018-2020 Kyambogo University Master of Science in Structural Engineering 4.0 2011-2014 Kyambogo University Bachelor’s degree in civil and building engineering 4.09 2008-2010 Kyambogo University Diploma in Water Engineering 4.03 Page 2 of 5
Role’s Summary: Construction Supervision and Monitoring, Engineering Design, QA/QC and project management.
Specific Tasks:
1. Project Standards, Software, Construction Manuals and submittals:
• Participated in the review and approval of standards and codes of practice adopted for the Karuma project and confirmed the EPC contractor submitted copies, including translated versions, soft and hard copies including (US, Chinese, Indian, and UK standards). This established an agreed technical baseline for all parties and resolved conflicts between codes.
• Interfaced with design teams and ensured copies of all design input files, models and designs softwares were shared to the client technical teams for critical review and validation. The software input files included ANSYS, ABAQUS, and STAAD Pro, SAP 2000.
• Supervised the preparation processes of project documents including construction methodology statements, Inspection Test Plans (ITPs), and laboratory test procedures, which defined the method, acceptance criteria, and testing regime before each activity started. 2. Thermal and Cooling Studies for Surface and Underground Structures:
• Participated in the EPC contractor's thermal and cooling studies, including selection of cooling systems to control temperature during concrete placement such as installation of thermocouples and cooling pipes. Supervised QA/QC teams to ensure in-situ thermal parameters were continuously monitored, logged, and analysed, which supported timely cooling decisions.
• Participated in the review, trials and approval processes of RCC dam planning, concrete placement and cooling protocols (mass concrete lift heights). 3. Automated Aggregate crushing and Concrete Batching Plants and Materials Lab:
• Supervised the construction, equipping and operation of the project material laboratory and verified calibration and test procedures were in place before start of concrete production.
• Supervised the construction, installation and operation of two automated aggregate crushing plants and two automated batching plants. Onsite generation of aggregates and concrete optimized project execution as materials were readily available.
• Routinely monitored QA/QC operations at the concrete batching plants, including calibration, mix verification, and automatic batching records, which confirmed every batch matched the approved mix design.
• Supervised concrete placement operations, including transport and placement equipment (trucks, buckets, conveyors, and pumps), lift placement, compaction, joint preparation, formwork, and continuous curing, and reviewed transportation protocols to prevent segregation and cold joints.
• Participated in site layout planning for plants, roads, stockpiles, and camp facilities. 4. Engineering designs, drawings and Design Peer-reviews:
• Coordinated contractors, consultants, and stakeholders and led technical design peer review meetings covering design reports, structural models, drawings, construction methodology Page 3 of 5
statements, and project implementation schedules (PIS), which shortened review and approval processes.
• Reviewed design reports, structural models, and drawings for dam elements and associated structures, and raised comments that were closed out before construction, which prevented design errors from reaching site.
• Carried out an in-depth review of contracts and associated documents and confirmed compliance with the employer's Terms of Reference (ToRs), designs, and deliverables.
• Reviewed proposed design modifications and contractual variations, and assessed their technical and schedule impact, which kept changes controlled and documented. 5. Construction Monitoring and Supervision:
• Monitored and supervised construction through regular site visits with project teams, and verified compliance with approved drawings, and engineering standards.
• Participated in the survey and setting out of the 314 m dam-axis and associated elements (piers, spillways, stilling basin), and ensured control points were set as per the approved alignment and dimensions.
• Supervised foundation preparation and treatment for the dam and other project structures
(excavation and blasting, levelling concrete, green cutting, curtain and consolidation grouting) and took part in joint site inspections to verify each stage against specifications and design requirements.
• Supervised concrete placement and checked lift heights against approved construction methodology statements.
• Supervised treatment of shrinkage cracks using Sika-dur repair material, which restored structural integrity and surface quality in the identified zones.
• Participated in installation of electro-mechanical and hydro-mechanical parts and in testing and commissioning operations of the plant.
• Participated in preparing presentations and training of project teams on effective concrete placement methodologies for managing heat and stresses, and on design methodologies, which built site capacity and reduced placement errors.
6. Project Management:
• Used Primavera P6 to carryout schedule analysis and discussed critical path activities with teams, which ensured interface between projects and work packages did not affect overall project progress.
• Reviewed ten monthly project progress reports submitted by contractors, consultants, implementing agencies, and the PoE, and prepared briefs for management.
• Attended site progress review meetings (SPRM) with different stakeholders, project steering committee meetings, and multi-stakeholder meetings where escalated project matters were discussed and resolved.
• Participated in Factory Acceptance Tests (FATs) for Karuma HPP in India and China, which confirmed equipment met specification before shipment.
• Attended risk management workshops organized by the Project Panel of Experts (POE) on Dam Safety and Underground Construction, contributed to the Project Risk Register, risk identification, and mitigation strategies, and attended debrief meetings where joint findings were presented, which strengthened the project's risk preparedness.
Page 4 of 5
• Participated in the procurement evaluation committee, developed terms of reference (ToRs), attended pre-bid conferences, and evaluated bids, which supported transparent and value-for-money procurement decisions.
• Prepared daily, weekly and monthly reports covering site progress, quality, HSE, and escalated issues such as delays, cost overruns, and variations. These reports informed management about the project status.
• Routinely reported in writing on delays and collaborated with teams to resolve errors in works, materials, and quality, which reduced recurrence of defects and disputes.
• Drafted letters addressing escalated issues, which kept formal communication clear and on record. 7. Quality Assurance / Quality Control (QA/QC):
• Participated in the identification of conformities and non-conformities on work fronts, discussed findings with teams, and proposed solutions, which closed out defects and improved work quality.
• Participated in the development of checklists and check-sheets used to collect daily progress data compiled into Daily Progress Reports (DPRs) of site activities.
• Reviewed and commented on submitted QA/QC manuals, method statements, and Inspection Test Plans (ITPs) and ensured compliance with project specifications.
• Supervised quality analysis of materials including concrete cubes, steel, fly ash, cement, and aggregates, which confirmed materials met specification before use.
• Contributed to the project quality control and assurance plan covering testing requirements for materials, fresh and hardened RCC, and trial placements, and reviewed results, monitored trends, and recommended corrective actions.
• Provided performance data to the audit team during project compliance audits and used findings to improve processes and performance metrics, which turned audit results into process improvements. 8. Cost Monitoring:
• Participated in verification of completed works and assessment of interim payment applications, checking quantities and quality before recommending payment.
• Fast-tracked review and approval of interim payment certificates and verified delivered milestones and work packages against contract requirements, which ensured payments matched actual compliant work.
• Monitored cost overruns and variation claims against the approved budget, and reported variances monthly, which kept expenditure visible and controlled. 9. Health, Safety, Social, Security, and Environment (H3SE):
• Participated in joint daily HSE inspections and toolbox talks and enforced established HSE guidelines.
• Enforced use of PPE, presence of safety personnel at all construction sites, and proper signage at different work fronts, which maintained a safe and clearly marked site.
• Participated in compliance safety audits, site inspections, and staff training, which reinforced a safety culture and improved HSE performance.
• Participated in environmental compliance monitoring covering dust, noise, waste, and water discharge, and followed up on corrective actions, which kept site operations within environmental permit conditions.
Page 5 of 5
10. Construction of Three Double-Circuit Transmission lines and Four Substations:
• Participated in monitoring and supervision of the construction of three transmission lines, covering foundation excavation, concrete placement, tower erection, and stringing operations.
• Supervised the construction of substations including excavation works, steel and concrete placement.
• Participated in site meetings and discussed with teams to ensure works were executed as per project implementation schedule.
11. Other Activities:
• Conducted quarterly performance and reliability assessments of small dams and prepared activity reports, which gave management evidence-based status information for maintenance and planning decisions.
• Coordinate with consultants and experts during early project development phases (site visits, feasibility studies, geotechnical investigations, and topographic surveys) and ensure identified sites align with the ministry's technical terms of reference.
• Currently involved in feasibility studies for other dams still at planning phase in the department. Once these projects are finalized, the ministry will procure international contracting firms for implementation either as EPC or PPP. The projects include Ayago (860MW), Kiba (398MW), and Oriang Hydropower projects (380MW).
Adolph Karubanga, PMP