Multiskilled Ironworker Pipefitter Millwright

Location:
San Benito, TX
Posted:
November 07, 2026

Contact this candidate

Resume:

**************@*****.*** Sotero Silva Jr CELL 956-***-****

Objective: Seeking a full/par-time position as an ironworker my various skills I have obtained throughout my career. I have performed various crafts such as Boilermaker, Ironworker, Pipefitter and Millwright.

Employments

Robinson Construction Batavia Ohio May 2025 - July 2025

Pipefitters: Align the pipe by placing supports on the pipe and aligning the conveyors by placing the gasket and screws, applying torque, and other activities.

Day Zimmermann Louisville KY March 2025 – May 2025

Pipefitters: The pipe was demolished and a new pipe was installed, securing it as it should be. Other necessary activities were carried out. Work was done in the basement as well as on the floors that needed repairs or new pipes installed (It was a Shutdown).

Robinson Construction Batavia Ohio October 2024 –February-2025

Millwright: New construction of Purina-Nestle where support was provided to install the pipe, aligning it with its gasket and screwing and torque using rigging, installing new machinery according to what is specified in the conveyors and new motors and tanks by doing Bull rigging and supporting the instrumentation department by installing pumps, thermostats, hoses and connections and manufacturing plates to install where specified.

Robinson Construction Cairo Illinois July 2024 – September 2024

Millwright: Machinery, conveyor and motors were demolished to make modifications to put everything new, aligning and making necessary modifications using hand and electric tools and rigging everything that was needed and supporting fellow Iron Workers and doing other types of activities.

Craft Logic’s and Trade-link, net Mt Vernon Indiana September2023 – May 2024

Millwright: An expansion was made to the MATHESON Gas plant where Hydraulic torque, impact wrench, torque wrench were used, assemble Air liquid Interface control drawing in cold Box, Dryer tanks, Compressors (large), Actuators, silencers, valves and Piping were added, set skids, putting gasket and making all bolt Up. It also helps with grinding, making pipe cuts and cleaning, making beveling for fitting, putting gasket in place and adjusting valves, screws and aligning for torque. He placed the structure in foundations at the bottom of the earth, moving everything with a crane with the corresponding rigging, scissor lift, YG lift using tool according to the job, make list of details other functions.

Lexicon Inc. Osceola AR November 2022 – July 2023

Millwright: Installing heavy machinery includes the moving of heavy equipment. The Millwright must know to operate hoists, jack, and other rigging devices, In smaller construction plants Nucor steel provided a punch list to perform details, verifies conformance of finished work piece to speciation, using precision measuring instruments. Fits and assembles parts into complete assembly, using jigs fixtures, surface table, hand tools and power tools. I am fitter and detail is made where the machinery was not assembled.

MMI Construction Cumberland MD September 2022- October 2022

Millwright: Assemble new conveyor equipment, layout equipment using set shims, drive impacting bolts, drive new bearings, and cut and grind. Manufacturing work.

Skilled Trades Decatur IN July2022- August 2022

Millwright: Make repairs in conveyor changing the band, bearings and plates changing boats of the conveyor belts as well as removing old motors putting new motors doing bull rigging other repairs according to the client (shutdowns)

MMI Construction Lebanon KY May2022 July 2022

Millwright: do new work put pipe, align put engines in the assembly area for an area where gasoline tanks are made for the Toyota. Short time job.

Lexicon Inc. Brandenburg KY June 2021- May 2022

Millwright: Grind and file machinery parts Work with a range of hand tools including measuring tools, welding and brazened construction begins assembling parts in the MET area according to the supervisor's instructions. Using the millimeter screws impacting and torque aligning the bearings with the instructions of the engineer, equipment.

Determine which machines, techniques, and tools to use when moving equipment and completing jobs.

Fluor Daniel Services Corp. North Bend Ohio April 2021-May 2021

Boilermaker: In the SCR unit, the old catalyst where replace by new catalyst, putting bull rigging. Cutting sheets to release the old catalyst. Later new foil and other modifications where putting in place, work was done on manufacturing air cannon headers, and other details that the client requests. (Shutdown)

Zachry Industrial INC Cayuga Indiana March 2021- April 2021

Boilermaker: The boiler was maintained by making repairs, putting new parts and other activities that is required according to the client.(shutdown)

Sexton Industrial. Ghent KY January 2021 –March 2021

Boilermaker: Adaptation was made for a cooling tower, putting structure put pipe and pumps and engines, making more details according to what the customer of Nucor Steel requested (short time job)

Yates Construction Maysville KY November2019-November 2020

Ironworker: Do expansion work on the old structure, also do iron reinforcements and put new iron, put screw, and impact them, have ready to put new supporters for the pipe.

Pipe Support: Put pipe supports according as directed giving the correct lift. Checking with the supervisor.

Bolt Tap: Ensemble the pipe put the ring and gasket according to the capacity by anchoring the pipe and put screw according as is the proper specification have the concern that there is no leakage, tighter the screw in cross so that it closes evenly and the gasket does not break, tightening the screw wings pounds that is specified and then check, Ensemble the pipe put the ring and gasket according to the capacity by anchoring the pipe the pipe and put screw according as in the proper specification have the concern that there is no leakage, tighten the screw in cross so that in classes evenly and the gasket does not break,tightening the screw wings pounds that is specified and then go check.

Lexicon INC. Ghent KY and Sedalia Missouri November 2018-August 2019

Ironworker: Fabricates and assembles structural metal, for example framework or shells and bridges according to job order, verbal instructions, and blueprints. Develops layout and plans sequence of operations.

Millwright: Installing heavy machinery include the moving of heavy equipment. The Millwright must know to operate hoists, jack, and other rigging devices, In smaller construction plants Nucor steel provided a punch list to perform details, verifies conformance of finished work piece to speciation, using precision measuring instruments. Fits and assembles parts into complete assembly, using jigs fixtures, surface table, hand tools and power tools. I am fitter and detail is made where the machinery was not assembled. Does rigging and bull rigging to move machinery.

Amec Foster Wheeler: Louisville KY October2018-October2018

Boilermaker: Made a demolition of the hopper inside the plant, put on new hopper installing what was necessary, bull rigging grading is done, install handrails as platforms firing doing other activities. (Showdown)

Day Zimmermann Cliffside NC July2018-Sep 2018

Ironworker/Rigger: all the work is inside the power plant is bull rigging pipe of different length and length as well as laying down grading, install hand rails, building platforms, connecting steel, bolt up and Bull rigging.

Zacchry Industrial INC Edward Sport Indiana April 2018-May 2018

Boilermaker: The location of the valve according to the work sheet is checked with the monitor if there is gas leak. The valve is removed by putting something to cover the pipe, afterwards screw are replaced the new valve is installed putting a new gasket, it is leveled there is no leakage it is tightened by torque ring, is does iron rigging.

Titan Contracting Owensboro and Robarts KY and Masontown PA January 2918-March 2018

Boilermaker: Boiler repair and maintenance of what is needed according to what the client request. Will remove, replace and or repair various piping systems; work on various cool fired boiler components including soot blower, burners, and dampers (showdown)

PCL Construction Rising Sun Maryland May 2016-November 2017

Ironworker: who constructs or erect complex pre-designed structural framework that serve as the foundation or ornamental infrastructures.

Pipefitters: Install pipe supports and put-on elevation cut, weld, clean and fit up pipe according to isometric drawings, layout pipe and fit up on jacks stands and tripods in order to get the welder going. Bullring pipes when they cannot reach into the tight sport, layout pipe in position for weld in place worker on schedule 10, 40,80 and 160 heavy walls, rigging in appropriate places, fabricate supports shoes, hangers and spring cans with all thread red paints and make all sure all dimensions are correct before fabricating and installing pipe.

Star UP and commissioning: clean up condenser, remove spools and prepared for flushes checked all lines for leakers, Star up and commissioned plant steam blades air blanks, undergrad flues bull rigging to get spools out.

Zachry Industrial INC Noblesville Indiana May2016-May 2016

Boilermaker: Boiler tube removal and repair, demo of old process pipeline, Fabricated and Installation of new pipeline. Corrosion controls and abatement. Reactor maintenance safe operations practices.(Shutdown)

Zachry industrial INC New Albany Indiana April 2016-Aprl 2016

Boilermaker: laid out, cut prepped and replace radiant tubes, cut out and replaced radiant tube clips. (Shadows)

Amec Foster Wheeler Harrodsburg KY April2015 -October 2015

Boilermaker: Assemble new pipes and secure, tubes fittings and related equipment, according to specifications by welding, brazing, cementing, threading planning the layout of time same Final list of misc. Iron online boilers verity and platforms to change screw, install handrails, top plates, grating of iron rigging.

Ironworker: verifies conformance of work pieces to specifications. Using square, rules Etc. Located and masks bending and cuttings lines onto work pieces. Rods from blueprints, sketches or oral to support pipe.

Zachry Industrial INC Louisville KY November2013-May 2015

Boilermaker: We built the fabric filtration system, we also built pennons for the tie in at the precipitator erected, fitted, and welder duct work, Inlet, duct outlet duct tying into the ID fans and into the WFGD, demolish and installing new ducts it was a Clyde bargain bag house for our major client LGE.

Amec kamtech Indianapolis Indiana Sep 2013-Nov 2013

Boilermaker: Align support base to put binge and hold, panels and leveling lines and crew to secure the foundation and verify what is not in line to fix.

Thompson Industrial Gonzales Louisiana July2013-August 2013

Ironworker: Bolt up, impacts bots, installed rod sage and erected handrails, position, aligns, fits, and weld together parts. Build and install iron or steel girders, columns, and other construction materials to form building, bridges, and other structures.

Amec kamtech Covington Virginia March 2013-June 2013

Boilermaker: Bolted or weld casing sections, uptakes, stacks, and baffles, Fabricated parts such as chutes, air heaters, fan stands, feeding tube, catwalks, ladders, cool hopper, and safety hatch to frame, using wrench, installs manholes, hand-holes, valves gauges and feed water connect I Know to do layout and I even know to bull rigging.

Ironworker: To take the lead in the erections of steel, fabrication, grid layout and rigging. I do know how to read the blueprints to fit and cut what is necessary I do not know how to read blueprints of pipe and supports. Blueprints and Dock work blueprints I know to bolt up know to connect I know to do layout and even know to bull rigging.

TIC the Industrial Ghent KY Jan 2013-November 2013

Ironworker: Located and marked bending and pieces. Plan work and select proper tools.

Fluor Daniel Services Franklin Texas November2012-November 2012

Boilermaker: Removed and replaced selective catalytic reduction for the SCR at a cool power plant in Franklin TX. The job was to build a trolley system. Other duties included fitting, cutting and welding (Shutdown)

Shaw Construction St. Paul Virginia May 2012-Oct 2012

Boilermaker and Ironworker: Final list of misc. Iron on line boilers. They consisted of handrails, top plates, grating, and detail of iron rigging, etc. Verified and confirmed workplace specifications using squares, rules and measuring tapes. Checked the proper position such as alignments, fits and welded together parts.

Fluor Daniel Services Tatum Texas March2012-April2012

Boilermaker: Repaired boiler, made demolitions to place new pieces. Also performed flame-cut to add expansion joints. Used rigging chokers to move materials into place (Shutdown)

Shaw Construction St. Paul Virginia Feb 2011-Dec 2011

Boilermaker: Installed plates inside stainless silos, Tovar liners, and stainless ring and pressure vessels. Additionally, performed all types of structural and plates work on duct, air, gas, stem, oil, and water.

Hoar Construction Juliette Georgia July2010-Dec 2010

Rod Buster: Specialized in posting tension steel reinstallation, reinforcing floor, and positioning. Secure steel, bars, cables, mesh, corrections, and forms using fastener, blow torches, and hand tools.

Mechanical Construction Ghent KY Mach2012-May 2010

Boilermaker and Ironworker: Repaired bells and bead with power hammers. Welded tube ends to ensure leak proof joints. Responsibly for equipment gathering too designation, worked with JM at High elevations.

Fluor Daniel Services Rock Dale Texas Feb2010-March2010

Boilermaker: Grinding irregular edges of sections or structural parts to facilitate fitting together the boiler using hammers, flame-cut, and files. Also demolished and installing new Pieces.

Right way Industrial Ghent KY June2009-Jan2010

Boilermaker: Aligned water tubes that connected or expanded the ends to drum and headers using tube expanders. Positioned drum and headers into supports and bolted or welded support frames.

Fluor Daniel Services Ghent KY April2007-May 2009

Boilermaker and helper Pipefitter: Repaired boilers or thank in the field by unbolting and flame-cutting defective sections. Also repaired tubes by straightening plates by using torches or jack. Installed new tubes, fit welder new sections, and replaced worn lugs on bolts. Demolished and attached new pieces on boilers. Repaired broken or cracked parts of the boiler and filled holes. Additionally, tacked assemblies together, cut metal plates and or structural shapes prepared broken parts for welding by grooving or scarfing surfaces.

Sander Bross Cross South Carolina Feb 2006-Jan 2007

Boilermaker: Aligned structure or plates sections to assemble boiler frames, tanks, or vats. Tool used plumb bobs, level, wedges, dog, or turnbuckles.