Patrick H. Bell
***** ********** ******, *******, **. 92584
*********@*****.***
Cell: 951-***-****
OBJECTIVE
Seeking a management position in competitive construction projects where I could prove my expertise and vast experience gained in this area.
PROFILE
I have diversified and vast professional experience in the industry. I have successfully implemented projects of various degrees in several states through my management and supervision career. QUALIFICATIONS
● Excellent communication skills
● Effective cost management of projects
● Capable of handling multiple projects simultaneously
● Ability to supervise, manage, and motivate work crews
● Effective quality checking of final deliveries
● Excellent time management
● Provided the Project Manager complete, accurate and timely information for additional authorized work, change orders, and verification for work-completed- to-date ensuring timely processing of monthly billing and owner invoicing. Ensured Safety Program is implemented and maintained from mobilization through completion of the project. Provided jobsite safety inspections and conducted safety training meetings along with all required documentation. Certifications and Licenses
OSHA 30hr Construction Safety and Health
First Aid
CPR
1
WORK HISTORY
Project Superintendent, March 2019 to September 8, 2026 Hodgdon Management and Construction Inc., Colton CA. As a Superintendent for HMC in the last 7+ years, I coordinated successfully multiple commercial projects from the ground up and retail projects in several states working on projects such as multiple Ashley furniture locations, two-storey medical building, One Safe Place treatment center in San Marcos.
● Oversaw site management and daily workflow to ensure deadlines were met, along with on-site construction execution. Ensured safety protocols were followed and adhered to OSHA standards.
● Managed short term scheduling (1-3 weeks out) to keep projects moving forward.
● Coordinated and directed various trade crews, suppliers and laborers.
● Resolved real time design issues, material shortages and field conflicts. Project Superintendent, April 2011 to January 14, 2019 Lakeview Construction Inc., Pleasant Prairie, WI.
Lakeview Construction traveling to various states constructing retail stores. These projects are 4 to 10 weeks long. Starting with a total demo of space and reconstructing. Kay Jewelers, Bath and Body Works, Tractor Supply, Tesla, Tempur Pedic, Project Manager/ Superintendent, March 2003 – April 2010 Western Commercial Construction Inc., Fallbrook, CA As a Superintendent for WCC in the last 7 years, I coordinated successfully multiple commercial projects from the ground up and retail projects in several states (CA, FL, TX, WA, AZ and SC) such as Barnes & Noble, J. Crew, Wells Fargo Bank, Community Church and Class “A” Office Buildings. Scheduled activities of subcontractors and provided a comprehensive, timely response to any questions proposed. I supervised all details within each phase of the projects and continual correspondence of job status to the project manager. Quality control, time management and maintaining stability was an integral part of each and every job.
In July of 2008 I was promoted to project manager providing schedules, determining subcontractors, and proposing RFIs to the architects, engineers and owners. Determined specific duties of the subcontractors and resolved any issues that would arise on a daily basis.
● Assessed the requirements of the general contract, plans, and specifications to gain complete understanding of the scope of work of assigned projects.
● Collaborated with Estimator and President by estimating costs of assigned projects and
● developing rough progress schedule and plan of construction for use in estimating and
● Bidding process.
● Assisted in making presentations to prospective clients for the purpose of obtaining
● Construction contracts.
● Collaborated with Estimator to solicit and obtain competitive bids from subcontractors and material suppliers as required.
● I prepared periodic payment estimate requests to ensure timely submission to the architect or owner's agent.
Project Superintendent, April 2000 - May 2002
Inland Empire Builders, Ontario, CA
I have supervised subcontractors and coordinated with company personnel to successfully construct several commercial projects from the ground up such as 2- Americas Discount Tire stores.
.
2
PROJECT HISTORY
Retail construction in various states.
Kay Jewelers, Bath and Body works, Tractor Supply, Temper Pedic, Tesla, Pearl Vision, Lens Crafter’s, Under Armor Barnes & Noble Booksellers
Lubbock, TX
New 33,411 sf. two story ground up Facility with Cafe that’s adjoins the South Plains Mall, 3.7 million. I was the close out onsite Project Manager and Superintendent. Folsom, CA
New 23,300 sf. Single story ground up shell and TI with Café, for the Elliott Homes Co. 3.2 million. I was the Project Manager
Ocala, FL.
This was a new 23,000 sf. single story TI with Café, in a new retail center, 1.7 million. I was the onsite Project Manager.
Pembrook Pines, Fl
This was a new 23,000 sf. Single story TI with Café, in a retail new center, 1.4 million. New York & Co.
I started and completed on or before scheduled completion dates 5 New York & Co. as the onsite Project Superintendent and mill work installer. All stores were TI’s from 5,000 to 6,000 sf. Locations were Phoenix, AZ., Tempe, AZ., Chino Hills, CA., Torrance, CA., and Las Vegas, NV they all range from 1.2 to 1.7 million. East Hills Community Church
As the onsite Project Manager/ Superintendent
Combination of a wood framed and masonry building on 5 acre lot in Riverside, CA. with all site work and under ground utilities. Ace Hardware
16,000 sf. single story all masonry building with exterior garden center on approximately 2acrelot in Temecula, CA. As The onsite Project Superintendent I started this project in late January 2006 with the grading. On this project we had to over x down 8’ to 24’ and install GEO GRID every 2’ as we back filled and compacted. I conducted all meetings and scheduled all work with all under ground utility companies. We completed this project in November 2006 Hancock Office Building
Owner: The Loelkes Group
15,000 sf 3 Story class “A” office building on 1 acre lot in Murrieta CA.. This building was a 3 story all structural steel building with all metal stud TI framing on the inside and included 1 elevator. I started this project with the grading and installed all the required under ground utility. Started late February and completed early December in the sane year.
3
Block Buster Video
As the onsite project Superintendent
2- 20,000 sf. buildings in Beaumont, CA. from the ground up including all grading, utilities and site work total time 8 months. Pacific Community Bank
18,000 sf. single story wood framed building from the ground up in Murrieta, CA. Including site work. 4