Personal Information
Name: Mohammad Fawzi AL Hamdan
Current position: Project Construction manager
Email address: ******.*******@*****.***
Mobile number +974-********
Nationality: Jordanian
Date of Birth: 5th of May 1992
Status: Married
License: Qatari driving license (14/ 02/ 2027)
Education
Bachelor's degree in civil engineering 2010-2015 at the University of Jordan. Languages
Arabic - (native speaker)
English - conversant (reading, writing, and speaking) Summary
Remarkable Project construction manager extremely knowledgeable about infrastructure, drainage, and Road works regulations and construction.
13 years of experience providing expert direction in all aspects of public infrastructure drainage Works; bridges, underground utilities, and roads.
Seasoned Engineer versed in project construction management. Possesses an innate ability to manage diverse teams. Results- oriented who works efficiently and effectively to complete projects on time and within budget. Highlights
Ability to lead civil, technical, QAQC, procurement, planning, QS, and related MEP teams.
Superb management skills.
Strong problem-solving skills.
Strong mathematical abilities.
Excellent time-budget management skills to handle competing deadlines.
Manage and establish a relationship with the client.
Excellent use of general computer programs such as the MS Suite, AutoCAD, and Outlook.
Effective oral and written communication.
Safety conscious.
UPDA (MMUP) Certified.
IOSH safety certificate.
Projects list:
ROADS & INFRASTRUCTURE IN JERYAN NEJAIMA DN101 (BLOCK 1700) ROAD AND INFRASTRUCTURE IN ALMEARAD AND SOUTHWEST MUAITHER - PACKAGE 03 Project Construction Manager 01/02/2021 to current PETROSERV Limited Duhail, Qatar
Prepare the project resources plan in terms of equipment, machines, and materials and manage the supply based on the time plan.
Monitor the project overhead monthly with 6 months look ahead
Follow up all the permits, ROs, SIS, TDPs …..
Conduct on-site investigations and analyze data (maps, reports, tests, drawings, and others).
Liaise with any consultants, subcontractors, supervisors, planners, quantity surveyors, and the general workforce involved in the project.
Manage the site operations and ensure that it works with high productivity ratios based on the weekly plan and within the available budget.
Review daily project expenses and report any discrepancies to the management.
Resolving any unexpected technical difficulties, and other problems that may arise.
Assists in identifying Health & Safety training needs for the site team.
Monitor the work of the subcontractors based on the project plan and ensure adherence to the time plan and project budget.
Acting as the main technical adviser on a construction site for subcontractors, craftspeople, and operatives.
Overcoming challenges of working on local roads (preparing safe access for pedestrians, residents’ cars, suitable diversion (TDP).
Prepare a monthly lookahead plan and review the work progress.
review plans, shop drawings, and quantities for accuracy of calculations.
monitor and manage the execution of civil works to ensure on-time - within the budget – high-quality completion activities.
review of the daily reports for site activities related (to manpower, equipment, the material used, and material needed).
Following up with the procurement and logistics for on-site materials and equipment.
Following up with QA/QC for the materials submittal, INR & method of statements.
Schedule the civil engineering activities in logical steps and budget the time and resources required to meet deadlines in coordination with the planning department.
Overseeing quality control and HSE matters on site. Road and Infrastructure in West Muaither (AL Manaseer) – Package 02 (546,000,000 QAR) SR. Project Engineer to 01/02/2021
UCC-InfraRoad Contracting
Muaither, Qatar
The work incorporates all services including but not limited to
Construction of open-cut dry and wet utility networks such as Stormwater, TSE, Potable water systems, streetlights, Telecom ducts, and JRC.
Site clearance, Road earthwork (Road crossing, gully connection, subgrade)
Rigid pavement (Curbstone, Subbase, interlock, Road sign).
Flexible pavement (subbase, asphalt base course, and wearing coarse) DI covers, Gully grating.
Acting as the main technical adviser on a construction site for subcontractors, craftspeople and operatives.
Overcoming challenges of working on local roads (preparing safe access for pedestrians, resident’s cars, suitable diversion
(TDP) installation of cars bridge were needed to pass the vehicles above the excavation trench)
Exposing all existing utilities on the road before excavation depends on the authority’s as-built drawings.
Checking plans, drawings, and quantities for accuracy of calculations.
monitor and manage the execution of civil works in assigned areas to ensure high-quality completion activities on time - within the budget.
Preparation of the daily reports for site activities with related to (manpower, equipment, material used, material needed, and quantities needed).
Following up with the procurement of materials and equipment needed on site.
Following up with QA/QC for the materials submittal, INR & method of statements.
Schedule the civil engineering activities in logical steps and budget the time and resources required to meet deadlines in coordination with the planning department.
Overseeing quality control and HSE matters on site.
Overseeing the selection and requisition of materials and plant; liaising with any consultants, subcontractors, supervisors, planners, LEAN construction, surveyor, quantity surveyors, and the general workforce involved in the project.
day-to-day management of the site, including supervising and monitoring the site labor force and the work of any subcontractors.
Resolving any unexpected site or technical difficulties by supporting the technical team and QAQC team to avoid any problems.
PJ009 – Road, and Infrastructure for Government Residential Division Project in South of Wukair - Package 01 (651,000,000 QAR)
Project Engineer
UCC-InfraRoad Contracting Wukair, Qatar
The work incorporates all services including but not limited to the Construction of dry and wet utility networks such as foul systems, stormwater (open cut and micro tunneling), the potable water system, precast, and cast in situ manholes, road works (subbase, asphalt base course and wearing coarse), Light poles, Telecom CRA ducts, JRC, Lean concrete at an electrical road crossing.
Acting as the main technical adviser on a construction site for subcontractors, craftspeople, and operatives.
Checking plans, drawings, and quantities for accuracy of calculations.
monitor and manage the execution of civil works in assigned areas to ensure high-quality completion activities on time - within budget.
Preparation of the daily reports for site activities with related (manpower, equipment, the material used, material needed, and quantities needed.
Following with the third parties.
Following up with the procurement of materials and equipment needed on site.
Following up with QA/QC for the materials submittal, INR & method of statements.
Schedule the civil engineering activities in logical steps and budget the time and resources required to meet deadlines in coordination with the planning department.
Overseeing quality control and HSE matters on site.
Overseeing the selection and requisition of materials and plant; liaising with any consultants, subcontractors, supervisors, planners, quantity surveyors, and the general workforce involved in the project.
day-to-day management of the site, including supervising and monitoring the site labor force and the work of any subcontractors.
Resolving any unexpected site or technical difficulties by supporting the technical team and QAQC team to avoid any problems.
Project Name: ROAD IMPROVEMENT OF IMMIGRATION INTERCHANGE ROUNDABOUT AND 22nd FEBRUARY STREET (Fast track project) (112,000,000 QAR) Project Engineer
UCC- InfraRoad Contracting
Gharafa, Qatar
The work incorporates all services including the Construction of 2 span bridge, Widening on the 22nd of February, Dry and wet utilities, Road works for 2 span bridge to close the architectural Opening above the tunnel to be a Traffic intersection, the RC works started by piling for the piers then pile capping with anchors to fix the precast piers then piers installation, abutment walls using CFRP Carbon Fiber Reinforced Polymer to improve the structural capacity of the existing abutments, reinforcement of the abutments raising and relief slabs construction, crosshead beam construction, bearing installation, precast girders installation, DIAPHRAGM construction, deck slab, approach slab, asphalt works, and furniture’s works. Widening of the 22nd of February street including:
wet utilities; wet utility networks such as foul sewer systems, stormwater manholes and gullies, precast, and cast-in-situ manholes.
Dry utilities; Telecom, QAF, ITS, ELV, TSE, high mast lighting, gantry’s, Light poles.
Road works subgrade layer preparation, subbase mixing, laying, and compacting.
Landscape works, asphalt works; asphalt base course laying and compacting, ITS loops installation, asphalt wearing course laying and compacting, and road marking.
Acting as the main technical adviser on a construction site for craftspeople, subcontractors, and operatives.
Checking plans, drawings, and quantities for accuracy of calculations.
monitor and manage the execution of civil works in the assigned area to ensure on-time – on-budget – high-quality completion of Civil installation activities.
Preparation of the daily reports for site activities with related (manpower, equipment, material used, material needed)
Following up with the procurement for material needed on site.
Following up with QA/QC for the materials submittal, method of statements, and inspections.
Overseeing quality control and HSE matters on site.
Overseeing the selection and requisition of materials; liaising with any consultants, subcontractors, supervisors, planners, quantity surveyors, and the general workforce involved in the project.
Day-to-day management of the site, including supervising and monitoring the site labor force and the work of any subcontractors.
Resolving any unexpected technical difficulties by supporting the technical team and QAQC team to avoid any problems. Project Name: INFRASTRUCTURE WORKS AT WADI CROSSING BETWEEN SEEF LUSAIL SOUTH & QEC. (165,000,000 QAR)
Site Engineer 04/05/2016
UCC-InfraRoad Contracting
Lusail, Qatar
Construction of WADI Bridge, Light Rail Transit (LRT) Bridge, seawall, WADI, and Road QEC-01 junction, landscape.
The work incorporates all services including but not limited to marine work, piling work, steelwork, formwork, falsework, concrete work, post-tension, all site furniture like “handrails, traffic barriers stainless steel trays”, painting work, earthing, foul sewer system, stormwater system, Telecom, and all wet and dry utilities. The project also includes bulk excavation and the protection of the existing deep-sea outfall pipe, demolition of the seawall for flooding, and the installation of district cooling and gas networks.
Preparation of Method statement for Piling works, general concreting, and Bridge construction.
Acting as the main technical adviser on a construction site for subcontractors, craftspeople, and operatives.
Doing the site daily report including (manpower, quantities, machines, etc.)
Following up with the technical team for the shop drawing and as-built related to the site.
Setting out, leveling, and surveying the site.
Checking plans, drawings, and quantities for accuracy of calculations.
Monitor and manage the execution of civil works in the assigned area to ensure on-time – on-budget – high-quality completion of civil installation activities for the bridgework.
Schedule the civil engineering activities in logical steps and budget the time and resources required to meet deadlines.
Ensuring that all materials used, and work performed are as per specifications.
Overseeing quality control and health and safety matters on site.
Overseeing the selection and requisition of materials and plant; liaising with any consultants, subcontractors, supervisors, planners, quantity surveyors, and the
general workforce involved in the project.
day-to-day management of the site, including supervising and monitoring the site labor force and the work of any subcontractors.
Resolving any unexpected technical difficulties by supporting the technical team and QAQC team to avoid any problems.
Value engineering: Solving the construction issues; like the post-tensioning issue and saving around 645,000 QAR.
Quantity Surveyor 10/2015 to 04/2016
OMRANIA and Associate Company Amman, Jordan
Quantity survey for Saudi government projects working in rivet, AutoCAD, and excel programs and prepare BOQ for those quantities with high accuracy.
Site Engineer 08/2015 to 10/2015
ZAMANOUN-Architects and Consulting Engineer Amman, Jordan Construction of villa building:
The work incorporates all services including but not limited to excavation and backfilling, Steelwork, formwork, concrete work, MEP work, façade, finishing work, and landscaping.
Site Engineer 06/2014 to 08/2014
Polygon Contracting Company Dubai/UAE
Construct and maintain the pipelines of potable and sewage water, firefighting system, Chilled water, construct manholes of the foul sewer. It was essential training to graduate from university at dragon mart (international city)