Harry Siackasone
*********@*****.*** MAGNOLIA GARDENS, HOUSTON, US 281-***-****
WORK HISTORY
Liner installer at Environmental Specialties International July 2016 - December 2016 (0.5 Year)
assisted in deploying and installing geosynthetic plastic for containment ponds-landfill expansion in charge of seaming the panels together with Demtech machine also assisted with quality assurance work when required Instrument fitter Pipe fitter Assembly technician at Exterran December 2014 - February 2015 (0.5 Year)
select type and size if pipe, tubing and related materials according to job specification measure, bend, cut, threads, assembles and installs primary tubing constructed the design of tubing for layout according to specifications of each individual client maintained and logged production reports and personnel records for MIC report tested products or subassemblies for funcionality and quality assisted with assembling pipes, secured and fastened nuts and bolts after insterting flanges performed air test to ensure no leaks were present to pass for Quality Assurance according to HSE standards
maintained work space to keep area safe and free of trip hazards Instrumentation technician at Proserv Operations, Inc SEC Products and Services September 2014 - October 2014 (0.5 Year)
installed, serviced, and maintained the quality and maintenance of pneumatic and hydraulic equipment and control
measured, cut, bent and installed tubing and pipes for conduit assisted with installations of swagelok and parker fittings to run tubing lines completed work assignments and filled out job reports in timely manner before moving on to other project
constructed analyzer housing units SEC Products and Services, Houston, TX Instrumentation technician January 2014 - August 2014
referred to P I, blueprints and BOM to locate parts, or equipment for for installation assisted crew with tubing layout
fabricated tacked and installed brackets for tubing trays when necessary installed tubing trays according to client specifications for primary tubing lines installed mounts, housings, or iron angles for regulators, flow meters, or tubing clamps installed mounts for pressure transmitters
inspected drives, motors, and belts
used Manlift or climbed onto unit with safety harness to install surge tanks, run auxiliary and engine jacket water lines onto side of unit
replaced or repaired defective or damaged parts using proper hand tools calibrated instruments and test equipment according to established standards Instrumentation technician at Exterran energy transfer January 2013 - July 2013 (0.5 Year)
prepared and maintained production reports for records read and interpret instructions and documentation and planned work activities disassembled malfunctioning instruments or test equipment and examined and test mechanisms and circuitry for defects
completed records, maintained tools and equipment, and performed various clean up and housekeeping activities
inspected instruments and test equipment periodically and adjusted calibration to ensure functioning within specified standards
followed all hazardous waste handling guidelines
assisted with tear down to disassemble unit to prepare for paint EDUCATION
Douglas MacArthur high school -
Graduated 2002-01-01
High school diploma
University of Phoenix Axia College -
Graduated 2011-01-01
Associates degree of Applied Science Pharmacy Prac Craft Training Center of the Coastal Bend Lone Star College System - Graduated 2018-01-01
General Studies
SKILLS
Assembly and Installation, 2 years
Calibration, 2 years
Housekeeping, 5 years
Instrumentation, 3 years
Pipe (Fluid Conveyance), 1 year
Hydraulics, 2 years
Maintenance, 2 years
Painting, 3 years
Quality Management, 2 years
Test Equipment, 3 years
Cladding (Construction), 4 years
LANGUAGES
Spanish, Advanced