Post Job Free
Sign in

Mechanical Engineer - MMUP/UPDA Certified

Location:
Al Dafna, Qatar
Posted:
September 19, 2026

Contact this candidate

Resume:

ABDUL JAWAD - Mechanical Engineer - MMUP/UPDA CERTIFIED – Ten Years’ Experience

DOB: 23/03/1991. Mobile: 77848479. Email: **********.**@*****.*** Qatar ID: 291********. Driving License: LTV. Address: Old Al Ghanim Doha Sponsorship: Abu Saqar Cont. & Transportation Visa Profession & Status: Freelance Engineering & Working Visa Pakistan Carrier Objective:

To work in a goal oriented and progressive organization and holding a key position while helping it & achieving its vision. Experience:

I have been full working professional experience OF 10 YEAR in different construction company and facility management company as mechanical and maintenance project, any related work as operational and planning, and maintain scheduling of manpower, technical maintenance of arrangement. I work as a site engineer and Coordinator. Projects Summary

Project Title: Qatar Private Schools Development Program. PPP Schools Package 14 Schools. January 2025 to Present. Client: MEHE Ministry of Education and Higher education. Main: Contractor: UCC.

SUB - Contractor: HBK Contracting CO.W.L.L.

Project Title: Al Rawdah 01 June 2024 to December 2024. Client: MOI.

Main Contractor: Arabian MEP Contracting.

Project Title: Modification of Bakery Factory Bakery Storage & Showroom, Office + Labor Accommodation 01 January 2023 to December 2023

Client: Cooperation Food Services.

Main Contractor: Damascino Trading & Construction. Project Title: Proposal Slaughterhouse for Camel's Sheep's & Staff, Labor Accommodation at Al Shashniya 01 January 2023 to December 2023

Client: IDC International Dec. & Cont.Co.

Main Contractor: Damascino Trading & Construction. Project Title: AL- HABARI REHABILITATION BULDING ZUBARA 01 January 2023 to December 2023. Client: MOECC.

Main Contractor: Damascino Trading & Construction. Project Title: MOSQUE & IMAM HOUSE 880 NAUIJA 01 January 2023 to December 2023. Client: MINISTRY OF AWQAF & ISLAMIC AFFAIRS.

Main Contractor: Damascino Trading & Construction. Project Title: Bin Al Sheikh Tower 01 January 2022 to December 2022. Client: Bin Al Sheikh.

Main Contractor: Jtc al Jaber trading & contg.co.

Sub - Contractor: Arabian MEP Contracting.

Project Title: MOSQUE & IMAM HOUSE 864 DAFNA January 2021 to December 2021. Client: MINISTRY OF AWQAF & ISLAMIC AFFAIRS.

Main Contractor: Arkit Trading & Contracting W.L.L. Project Title: EXTENSION OF CIVIL DEFENSE FIRE STATION BULDING SHAHNIYA January 2021 to December 2021. Client: MOI.

Main Contractor: Arkit Trading & Contracting W.L.L. Project Title: Lusail Control & Command Center (LCCC BP27 Lusail City) 01 January 2020 to December 2020. Client: Lusail Real Estate Development Company.

Main Contractor: Arkit Trading & Contracting W.L.L. Project Title: Onshore project. Maintenance of Gas Turbine. 01 January 2020 to December 2020. Client: RGPC (RAS GIRTAS POWER COMPANY).

Main Contractor: Arkit Trading & Contracting W.L.L. Project Title: North Field Expansion Project. Onshore Facilities NFE-ESW. 01 January 2019 to 25 December 2019. Client: Qatar Gas Operation Company limited.

Main Contractor: CCC (Consolidated Contractor Group). Project Title: Holiday in Staff Accommodation @ Abu Sidra 20 January 2015 to28 December 2018. Client: Muhammad Bin Hamad.

Main Contractor: Damascino Trading & Construction. Client: Frontier Ceramics Limited 2015 to 2018.

Summary of Job duties:

Site Mechanical Engineering role – Firefighting System (Fire Pumps & Sprinkler System) Plumbing & Drainage System, HVAC System. Utilities / High Riser Building Services Environment)

• Mechanical Engineering role for Firefighting system, Plumbing Drainage & HVAC Heat Ventilation and Air Conditioning.

• Inspection test plan, Material inspection report, and Work inspection report.

• Related document submitted to QC manager.

• The shop drawing is approved, Preparing of material submittals inspection report for all upcoming material.

• Installation completed then final inspection for acceptance.

• Plan and execute the work on daily basis.

• Report to senior and client on daily basis.

• Solving the technical problem of supervisor.

• Taking care that work is executing at site by considering safety and quality.

• Handling internal and external material inspection and quality. Key Responsibilities HVAC System (YORK, DAIKIN, TRANE Chiller System & Gree, Mitsubishi, Carrier Split AC system)

• Installation of (YORK, DAIKIN, TRANE) including Primary pumps and Secondary Pumps.

• Installation of water-cooling tower for York chiller system.

• Installation of air-cooling system for DAIKIN and TRANE chiller system.

• Installation of Gree, Mitsubishi, Carrier Split AC system.

• Installation of Split Ac indoor and outdoor Unit.

• Installation of Air curtains (100 Cm 120 Cm 150 Cm)

• Installation and insulation of supply, return, fresh and exhaust air duct.

• Installation and insulation of (linear insulation) ring, rvcd, flexible and plenum box.

• Installation and insulation of ring, rvcd, and flexible connection.

• Installation and insulation of svcd and diffuser box.

• Installation and insulation of fire damper, FMSD damper, Return angle and Access door.

• Installation and insulation of VAV (variable air volume).

• Installation and insulation of sound attenuator.

• Installation of FCU Fan Coil Units.

• Arrange stage wise inspection as required and get the clearance from complete. Key Responsibilities (Plumbing System)

• Installation of HDPE PIPE (50mm, 82mm, 110mm, 160mm) for main water supply line from kahramaa.

• Installation of PPR (20mm, 25mm) for CWS Cold Water Supply, and HWS Hot Water Supply.

• Installation of PPR (32mm, 40mm, 50mm 63mm) for main Water Supply.

• Installation of COPPER (15mm, 22mm) for CWS Cold Water Supply, and HWS Hot Water Supply.

• Installation of COPPER (28mm, 54mm) for main Water Supply.

• Installation of WHA Water Hammer Arrestor for Pressure control of water.

• Installation of EWH Electric Water Heaters with Gate valves.

• Installation of Pressure NRV non return valve in water heater for hot water system

• Installation of Gate valve, TMV valve and DRV valve

• Installation of lifting and pressure Booster pumps for main water tank to roof water tank.

• Installation of pressure Booster pumps for roof water tank to Building water supply system.

• Installation of Pressure Reducer valve for pump system.

• Installation of channel, thread Rod (10mm 8mm) and split clams for supporting.

• Checking the pipe supports reducer’s joints perfect insulation without leakage.

• Ensure that the work to be as per standards, by maintaining quality and safety.

• Responsible for pipeline connection of Sub-Merssible, Booster and irrigation pumps as per design.

• Arrange stage wise inspection as required and get the clearance from complete.

• Testing and commission of Copper, GI, PPR, HDPE, and UPVC pipe. Key Responsibilities (Drainage System)

• Installation of UPVC Pipes (160mm) for main drainage systems

• Installation of UPVC Pipes (110mm) for EWC and IWC toilet drainage and rainwater systems

• Installation of UPVC Pipes (82mm) for floor drainage water systems.

• Installation of UPVC Pipes (50mm) for wash basin drainage water systems.

• Installation of HP pipe (1and 2 inches) for HVAC drainage water system.

• Installation of Accessories fittings (90, 45 elbow & T elbow, P Trap, Reducer and socket) for joining of silent piping system.

• Checking the pipe supports reducer’s joints perfect insulation without leakage.

• Ensure that the work to be as per standards, by maintaining quality and safety.

• Arrange stage wise inspection as required and get the clearance from complete. Key Responsibilities (Firefighting System)

• Supervised firefighting systems, including fire pumps (diesel, electric, jockey), hydrants, hose reels, sprinklers, fire water tanks, valves, and piping networks.

• Installation of GI pipe 150mm, 80mm, 65mm, 50mm40mm, 32mm25mm for header line.

• Installation of zone control valve, (gate valves, check valve, pressure gauge, flow switch). And test and drain valves.

• Arrange stage wise inspection as required and get the clearance from complete

• Conducted routine testing, inspection, and operational readiness of fire pumps in compliance with QCDD and NFPA standards.

• Checking the pipe supports reducer’s joints perfect insulation without leakage.

• Ensure that the work to be as per standards, by maintaining quality and safety. Education Qualification

• Bachelor of Technology (Honours) in Mechanical 4Years, Sarhad University of Science & Information Technology Peshawar 2016.

• Bachelor of Sociology, University of Peshawar, 2015.

• Diploma of Associate Engineering in Mechanical 3Years, Government College of Technology Peshawar, 2012. COMPUTER SKILLS.

• MS. OFFICE

• AUTO CAD



Contact this candidate