Post Job Free
Sign in

Civil engineer, project manager

Location:
Cairo, Cairo Governorate, Egypt
Posted:
September 14, 2026

Contact this candidate

Resume:

Page * of * – CV/ Mostafa Abdelkarim Mohamed WhatsApp/Mob +201*********

Mostafa Abdelkarim Shahaat

IPMA ®, PMI-PMP® - Senior Civil Engineer - QA/QC

Water & Infrastructure Projects - Construction Projects - High-Speed Railway Infrastructure Mob: +20-100-***-**** - **************@*****.*** - Egyptian PROFESSIONAL SUMMARY

Results-driven Senior Civil Engineer with 15+ years of experience in water, infrastructure and railway projects. Skilled in QA/QC, FIDIC contracts, cost control, and stakeholder management. Proven track record in delivering large-scale projects safely, on time, and within budget. CORE COMPETENCIES

Project Management (PMP® Certified)

Quality Assurance & Quality Control (QA/QC)

Claims Management

EPC Projects & Construction Management

Site Supervision & Coordination

Infrastructure, Water & Wastewater Projects

Cost Estimation, Budgeting & Control

Stakeholder & Client Coordination

HSE Compliance & Progress Monitoring

Technical Reports, Submittals & Documentation

Team Leadership & Staff Development

Professional Experience & Key Achievements

1. Position: Senior Resident Civil Engineer Oct 2024 – Present

Project Title: Construction of a High-Speed Train Station

Location: Egypt

Client: National Authority for Tunnels (NAT) – Ministry of Transportation

Employer: SYSTRA Consultant

Value of Project: EGP 046 M ) first phase (

Project Description:

Construction of a High-Speed Train Station at El-Sibaya, Aswan, as part of Egypt’s National High-Speed Rail Network. The project includes structural, architectural, and infrastructure works, integrating modern systems for passenger movement, safety, and operational efficiency.

Key Responsibilities:

Lead and supervise daily construction activities in compliance with international standards and project specifications.

Coordinate with contractors and project stakeholders to review designs and manage project timelines.

Conduct quality inspections and ensure proper handover of completed works.

Review and implement proposed design changes and project modifications.

Prepare regular progress reports, technical documentation, and provide feedback to enhance project performance.

Review Approved SD and all IRS, MIR, TRF for all Project Items. Page 2 of 4 – CV/ Mostafa Abdelkarim Mohamed WhatsApp/Mob +201*********

Review and approved of the monthly invoices submitted from Contractor

Preparation of detailed technical reports and documentation for management review and client submissions

2. Position: Construction Manager Apr 2022 – Oct 2024

Project title: Construction of Al- Hanady water treatment plant.

Location: Egypt

Funding Authority: United States Agency for International Development (USAID)

Client: Holding Company for Water and Wastewater (HCWW)

Employer: El-Saeed Contracting and Real Estate Investment CO. SCCD

Value of Project: USD 06M

Key Responsibilities

Manage and supervise all on-site construction activities, ensuring compliance with project drawings, specifications, and timelines.

Lead the site engineering team, supervisors, and subcontractors, fostering collaboration to achieve project milestones.

Coordinate with the Technical Office and consultants to address and resolve design and execution challenges, ensuring project alignment.

Develop and monitor project schedules, promptly identifying potential delays and implementing corrective actions.

Review and approve materials, technical submittals, and subcontractor progress invoices, safeguarding project integrity and budget adherence. 3. Position: Quality Control /Quality Assurance )QA/QC ( May 2020 – Apr 2022

Project title: Construction of Security Directorate.

Location: Egypt

Client: Ministry of Interior (MOI)

Employer: El-Saeed Contracting and Real Estate Investment CO. SCCD

Value of Project: EGP 550M

Key Responsibilities

Ensure site installations comply with company policies, national and international standards, and client specifications.

Implement and maintain the QA/QC management system on site.

Prepare and develop inspection and test plans, Method Statements, and QC Plans.

Monitor the implementation of the approved site QC Plan.

Maintain and update all technical documents related to site quality control.

Ensure compliance with project specifications and codes.

Monitor third-party work (labs and/or fabrication).

Ensure smooth handover.

4. Position: Site Manager Jan 2019 – May 2020

Project title: Extending of sewage networks & construction Pump station

Location: Egypt

Client: Holding Company for Water and Wastewater (HCWW)

Employer: El-Saeed Contracting and Real Estate Investment CO. SCCD

Value of Project: EGP 40M

Page 3 of 4 – CV/ Mostafa Abdelkarim Mohamed WhatsApp/Mob +201*********

Key Responsibilities

Managed and supervised all construction activities according to drawings and specifications.

Directed the site team and monitored daily performance.

Coordinated between civil, electrical, and mechanical disciplines to ensure work integration.

Prepared progress reports and resolved technical issues on site 5. Position: Site Engineer Jun 2017 – Jan 2019

Project title: Maintenance and developing for Hospital

Location: Egypt

Client: Ministry of Health and Population

Employer: El-Saeed Contracting and Real Estate Investment CO. SCCD

Value of Project: EGP 150M

Key Responsibilities

Implemented redesign instructions to enhance building efficiency and functional performance.

Coordinated between civil, electrical, and mechanical disciplines to ensure integrated project execution.

6. Position: Technical office Engineer Jun 2015 – Jun 2017

Project title: Maintenance and developing for military hospital

Location: Egypt

Client: Ministry of Health and Population

Employer: Al Asria For Architectural Construction Company

Key Responsibilities

Prepared shop drawings, BOQs, and progress reports.

Supported site team with technical submittals and design modifications. 7. Position: Site Engineer May 2012 – Jun 2015

Employer: The General Authority for Educational Buildings

Key Responsibilities -

Supervised various construction projects including:

Hotel for Nile International Schools, New City of Teba.

Agricultural Secondary School and Mechanical Workshops.

Educational Administration buildings

Family Medicine Hospital in El Hanadi.

Family Medicine Hospital on Rajeh Island.

Specialized maintenance for Luxor schools.

Prepared daily, weekly, and monthly progress report

Evaluated technical and financial offers and managed VO

Performed Quantity Surveying tasks

surveying and As-Built drawings

Member of preliminary and final handover committees.

Prepared Bills of Quantities (B.O.Q), tender documents, and project specifications 8. Project title: Road Maintenance Aug 2010 – May 2012

Job title: Site Engineer

Achievements

Reduced NCRs by 20% through proactive QA/QC planning.

Delivered USD 17M project 2 months ahead of schedule. Page 4 of 4 – CV/ Mostafa Abdelkarim Mohamed WhatsApp/Mob +201********* Technical Skills/software

AutoCAD, MS Project,

Primavera P6,

Excel (Advanced)- Word- PowerPoint

Quantity Surveying,

QA/QC Procedures,

REVIT

EDUCATION

B.Sc. in Civil Engineering – Al-Azhar University - (2010)

Grade: Very Good with Honors (81.3%)

Graduation Project: Project Management and Planning (Excellent) CERTIFICATIONS

Project Management (PMI - PMP® Certified_2026) -

ISO 9001:2015

Quality Management System (EOS, 2023)

Total Quality Management (TQM) (EOS, 2023)/ISO 19011:2018 –

Auditing Management Systems (EOS, 2022)

FIDIC Contract Manager Preparation (Arab Center for Arbitration, 2023)

Quality Control of Building Materials (NHBRC, 2019)

Construction Supervision (NHBRC, 2019)

Concrete Defects & Treatment (NHBRC 2013)

AutoCAD Training (Armed Forces Institute, 2013)

Languages

Arabic: Native

English: Fluent

PROFESSIONAL MEMBERSHIPS

Egyptian Syndicate of Engineers No. 5/4000668/2010/3

Saudi Council of Engineers – No. 1057268



Contact this candidate