Home : 002**-**-******
Home : 002**-**-******
Email : **.******@*****.***
CURRICULUM VITAE
Senior Well Services Engineer Completion & Work-Over
( Drilling – Completion – Work over )
Surname : EL EUCH
Name : MOHAMED RIADH
Birth date : April, 28 th, 1957
Birth place : Sfax
Address : Les Berge du Lac 1053
BP 110 / TUNIS - TUNISIA.
E-mail Address : **.******@*****.***
Phone nembers : Mobile phone: 002**-**-****** (Tunisia) Marital status : Married (2 children)
Passport N : N731174
Place and date : 28 / 02 / 2025
of issue. Tunis / TUNISIA
Expiry date : 27 / 02 / 2030
Citizenship: Tunisia
Languages: Arabic, French, English, Italian.
Education & Experience Travel and relocation
Education Level: Masters Degree Willing to Travel: Yes Oil & Gas Experience: >30 years
Willing to Relocate:
Yes -
Internationally
Areas of Expertise
Industry Sector Expertise Experience
Well Services Operations
Drilling, Work over & Completion
(Supervisor Operation and Engineering
) with SITEP / Tunisia
6 years
Engineering & Operations
Engineer Expert in Drilling &
Completion
Head “Programazione & Ingeneria
Area Pozzo” ENI / Italy
8 years
Engineering & Operations
Head drilling, completion, work-over
with SITEP / Tunisia
3 years
Engineering & Operation at BSP and
Research Department with Global Shell
for Technology developments
Senior Lead Team Front End Drilling,
Completion and work over activities
with Global Shell International / Brunei
& South East Asia Region
12 years
Manager for Well Services Company
Manager of Well Services Company
Named SIVAM Tunisie and Located at
Tunis. Is a Branch of SIVAM Italy /
www.sivam.com
2,5 years
Resume / Curriculium Vitae :
Work-Experience:
- January 1985 I was recruited by SITEP as Drilling and Completion Engineer as supervisor, Rig Superintendent of operations, and then as head of drilling, completion, well testing and work over operations at Elborma Field.
* Drilling, completion and WO supervisor for land rig “oil development project”
* Create a fishing office due many corrosion problems encountered and many fishing operation for different completion string as ESP, Gas lift, single and dual completion string.
* working very close with production and reservoir department for some project to make a complete investigation to sorted out some difficult situation, prepare operation program and assist some heavy and light WO intervention.
* After 5 work years as Supervisor, SITEP offer me as Head of drilling, completion, well testing and workover operations activities at Elborma base.
* I was involved in many projects with Service Company to improvement on down whole tools performance. (Drilling – Completion – stimulation and work over activities).
- November 1991 I was assumed by AGIP S.P.A – After a selection done for “ AGIP International Project” as Senior Petroleum Engineer with nomination of Engineer Expert and Responsible of “ Programmazione & Ingeneria Area Pozzo” Related to Drilling, Completion, Work over and well testing activities at ORTONA base / Italy.
Our Department has to manage all Operations Contracts related Well Servicing
I was selected to work with a leader team to prepare 3 big projects for gas field development on Adriatic Sea.
I work very close with Asset Team to select the right technology for drilling, completion and well testing projects.
Participate with Asset department and service company to make performance improvement on down hole tools for drilling, completion, work-over ( fishing ) and DST Tools.
As Head of Completion Team Expert, I was involved in many projects for gas wells and oil wells. The aim of this project is to develop some technology with services company for : horizontal wells and high deviated wells, Smart completion, Inside casing gravel pack and open hole gravel pack for single and dual completion.
I was the focal point for many Rig-less operations.
All this period, I was in contact with all operations, and frequently called from Rigs to discuss and suggest some solution with the operation team.
- April 1998 I come back to Tunisia with ‘’SITEP’’ as Senior Petroleum Engineer Head of drilling, completion, work over and well testing activities ( engineering & operation) And in the same time, I work as consultant especially on drilling and completion engineering for some international projects with International Engineering Office.
* Prepare Drilling, completion and work-over program and assist the operation from my office at Tunis. (Eldora field: ESP and gas lift completion, ICGP & OHGP completion and single and dual completion for eruptive wells)
* I have also made many short trips to Middle East. Where I carry out as assigned studies addressing specific operational problems and submit appropriate recommendation for cost-efficient and immediate resolution of such problems through modification of methods, standardization of practices or introduction of new technology and materials with the aim to reduce operations costs.
- From September 2004 to April 2016 I integrated as consultant at Brunei Shell Petroleum as Senior Completion and work- over Engineer.
* Smart Completion Design project for vertical, deviated and horizontal wells with BSP. Using the new smart technology down hole equipments for the first time at BSP.
* Smart Completion Design project combined with new technology on ICGP – OHGP with Halliburton and new ESS application with Weatherford for the first time at BSP.
* Follow up Water Injectors Wells study related to Pre-completion and smart completion with Asset Team for onshore & offshore field. ESS installation in 7”
& 9 5/8” cased hole for the first time in BSP with excellent results.
* Follow up CC Well project study – “Conductor – Connector Wells “related to Pre-completion and completion with Asset Team for onshore Seria Field.
* Follow up Fish-Hook Wells Project study related to Pre-completion and smart completion with Asset Team for onshore Seria Field. Acid & Gravel Pack Optimization for lower Completion and Upper Completion (Smart Down Hole Tools). Maximum Inclination was 143 Deg. Where we need to use a dedicate technology to drill and complete those wells. This Project is classify as first Global worldwide.
* Follow up Work-Over Project study for Offshore and Onshore fields with Asset for ESP Installation, with different completion design. ESP installed are from varied supplier as Schlumberger, Baker and Wood Group.
* Follow up Work-Over Project study for offshore and land fields with Asset Team for Seria Field and CW Field.
* Follow up development wells project study related to Pre-completion and smart completion with Asset Team on Seria Field onshore.
* From April 2016 to Sept 2018 I worked as Manager Director of Well Services Company Named SIVAM Tunisie and Located at Tunis. Is a Branch of SIVAM Italy / www.sivam.com.
* From Sept 2018 I am working in my own Engineering & Consulting Office located at Tunis
The-main-work function-is :
Prepares overall instruction programmers for Drilling, Completion, Work over, Testing and related petroleum engineering operations for implementation by operating divisions, measures to resolve operational difficulties and conducts short term studies to Improve the efficiency of operations.
- Finalize and approve Completion Design & Budget for each project
- I am Contract Holder for most of contact related to Completion activities
- Check and Signed the Completion and WO Program
- Support the Rig during Completion and WO Execution Phase
- Support Asset Department Staff as PT Engineer and teach them how to select completion down hole tools and finalize a completion design
- I introduce new technologies and participate as Shell Staff to improve and approve those technologies for trial as first time at BSP or Shell Global.
- I am member of Brunei Shell Technical Authority, to approve some decision on operation by signing MOC, signed official document as Well Data Pack-3 is the final step before project execution,
WORK PERFORMED:
1 - Prepare in coordination with other branches/sections in the petroleum development division, instruction programs specifying to operating divisions the required well completion, work over, drilling and testing activities in accordance with company and well objectives. 2 - Preparing the Drilling, Work over and completion programs with the relevant operational cost using the updated computer software ( drill string design, casing design, drilling fluids, cementing, fishing, wellheads, testing and completions of vertical and horizontal Wells). Type of drilling wells : ( Tunisia – Italia )
- vertical wells : exploration and development wells
- Side track – re-entry : exploration and development wells
- Horizontal wells using the new technology for deviated and horizontal wells Type of completion : ( Tunisia – Italy – Middle East – south east of Asia)
- standard completion and dual completion strings
- ESP’s completion string
- Gas lift completion string
- Single and a dual completion string inside casing and open hole gravel pack.
- Special completion for horizontal wells
- Smart completion w/ high technology for horizontal well. Type of work over: ( Tunisia – Italy - Middle East- south east of Asia)
- remedial job for casing and tubing string
- Throw tubing inflatable packer for partialisation and isolation of some zones using coiled tubing and application of water shut off for the same aim.
- Stimulation
- Fishing operation, I create a very competent fishing office at Elborma operation base because we have high corrosion.
- And others type of remedial job.
Type of Rig less intervention : ( Tunisia – Italy - Middle East )
- Remedial job with wire line to solve some critical situation.
- Prepare and control the survey report data after any intervention .
- Prepare the rig less intervention program using coiled tubing unite.
- Well abandonment
3 – Receives daily operational and engineering reports from the operating divisions and evaluates performance and progress to ensure that all operations are being carried out in accordance with the programmes and observed practices and standards, Includes identifying substandard performance or faulty implementation and recommending corrective measures to ensure meeting the operation's objectives and the cost-efficient realization of the total objectives of each programme.
4 - Carries out as assigned studies addressing specific operational problems and submit appropriate recommendation for cost-efficient and immediate resolution of such problems through modification of methods, standardization of practices or introduction of new technology and materials with the aim to reduce the operation cost. 5 - Discussion the Drilling, completion and work over programs with different services companies, selecting the suitable down hole tools and surface testing equipment, according to the company standard specifications.
6 - Evaluate and make the up dating of the standards specification of requested services and the manual of best practices and minimum requirements for drilling and completion activities. 7 - Co-ordinate with the Department of Environment Management System and HSE, to updating the company regulations in compliance of the requested from the International Standards Organisation ( ISO ) just to improve the EMS for the drilling and production department.
Education & Training:
Education_DEGREES:
- Mathematical and scientific 01 Level (Bac Math-Science).
- Degree Master of Science in Drilling and Production Engineering. Certifications & Achievements:
DEGREES :
- Mathematical and scientific 01 Level ( Bac Math-Science ) .
- Degree of Master of Science in Drilling and Production Engineering.
- Certificate of congratulation from Brunei Shell Petroleum (about 11 years work).
- Certificate from IFP in drill stem test and well testing.
- Certificate of congratulation from AGIP / ITALY (about 8 years work) SPECIAL ENGINEERING PROJECTS:
1- Preparing the long production test program for deep water horizontal well using SEMISUB.
2 - Introducing new technology and down hole tools for completion and drilling horizontal wells cluster type in ITALY.
3 - Through tubing gravel pack the main project objective is to install slim screen gravel pack through the completion string in gas reservoir. 4 - Following up, the new-offshore work over gas project using dual completion string
( 8-10 packers ), with conventional, gravel pack, frack pack and sand flow test. 6 - Introducing new technology and down hole tools for drilling horizontal wells, horizontal completion string just to have flexibility in production operations . 7 - Following up program and cost Sand frac project ( hydraulic fracturing job ) with Euro frac - team-of Halliburton company.
8- Following up, the new- drilling project with the Engineering Team ( AGIP / BAKER INTEC ) of the SDD Tool and the first application of this tool in ITALY 8- Upgrade with Global Shell International at BSP some Technology with Halliburton and SLB Gravel Pack Teams on Open hole and Inside Casing Gravel Pack. Especially for Open Hole fish hook wells with inclination up to 145 Deg, as worldwide is first Project.
9- . Upgrade with Global Shell International at BSP some Technology with Halliburton and SLB Gravel Pack Teams on Inside Casing Gravel Pack for the Single Trip System.
10- Upgrade with Global Shell International at BSP some Technology with WellDynamic (HES) on down hole tools smart Equipment as ICV’s, Permanent DHG and PKR’s.
11- Upgrade with Global Shell International at BSP some Technology with Weatherford on down hole tools smart Equipment for the DTS System, after some trial we reach the target today to have very efficient Optical Gauge and DTS System. 12- Upgrade with Global Shell International at BSP some Technology with Halliburton on down hole smart tools to complete wells having in the same time HP reservoirs & depleted reservoirs “IBO Project at BSP” HOBBIES :
Culture: : Member in society of petroleum engineers in Italy from 1994 to 2000.( membership card number 1597202). Sport : Volley ball with Sfax local team and National Team of Tunisia. Twice time win African Cup