Michael A Jones, PE
Riverside, RI 02915
*********@*****.***
Skills
ETAP, SKM, Load Flow, Short Circuit, Arc Flash, Overcurrent Protective Device Coordination, Sizing Transformers, and Electrical Facility Layouts. Designs done in accordance with the NFPA 70, NEC, The National Electrical Code. Designs include Power Distribution, Grounding, Lighting, Communication, Fire and Security Alarm. Professionally registered in 18 states and I was engineer of record for all designs that I developed. Performed forensic studies for problems with existing electrical installations. Investigated circuit breaker and control system failures that led to property damage and personnel injuries. Experience
December 2024 - Present
Self Employed - Senior Electrical Engineer
● Power Distribution, Grounding, Lighting, Fire Alarm, Communication Systems and Security Systems for Doctor Offices in Rhode Island Hospital APC Building.
● Designs done in accordance with the NFPA 70, NEC, The National Electrical Code.
● Review of New Designs for Doctor Offices in Rhode Island Hospital APC Building.
March 2018 - December 2024
CG Global, Madison, Wisconsin - Senior Electrical Engineer
● Provide designs for Electrical Substations, sized transformers and overcurrent protective devices to provide power to customer loads.
● Designs done in accordance with the NFPA 70, NEC, The National Electrical Code .
● Used ETAP to run load flows, size circuit breaker, develop short circuit, and arc flash studies.
● Performed forensic analysis on electrical component failures that were installed in Medium Voltage substations.
March 2014 - March 2018
NSTAR, Yarmouth, Massachuse s - Supervisor Electrical Engineering Supervised junior Electrical Engineers, electrical designers and ACAD operators working in office.
● Provide designs for Electrical Substations, sized transformers and overcurrent protective devices to provide power to customer loads.
● Designs done in accordance with the NFPA 70, NEC, The National Electrical Code.
● Used SKM to fun load flows, size circuit breakers, develop reports for short circuit, and arc flash.
March 2011 - March 2014
Naval Education and Training, Newport, Rhode Island -Senior Electrical Engineer
● Provide designs for Electrical Substations on Naval Base.
● Provide designs for base facilities. Designs done in accordance with the NFPA 70, The National Electric Code.
● Designs included Power Distribution, Grounding, Lighting, Communication, Fire and Security Alarm Systems.
● Designed a new sewage tank level control system that resulted from a circuit breaker failure. The failure resulted in raw sewage overflow on the naval base. The new design included a Primary Level Control Panel and a Backup Level Control Panel each with a separate bubbler tubing used to measure the depth in the sewage tank and no shared components. You could select with panel controlled the pumps by a local selector switch on the primary panel, remotely by base SCADA system, low air pressure in the bubbler tubing or loss of control voltage. The Naval Captain of the base liked the design so much he initiated an $11,000,000 project to install the system in every sewage lift station on the base.
● Met with base pers onnel to discuss their needs used for designs.
● Reviewed designs by firms that provided designs.
● Engineer of record for all of my designs.
March 2007 - March 2011
Brown University, Providence, Rhode Island - Senior Electrical Engineer
● Provide designs for Electrical Substations on University campus.
● Provide designs for base facilities.
● Designs done in accordance with the NFPA 70, NEC.
● Designs included Power Distribution, Grounding, Lighting, Communication, Fire and Security Alarm Systems.
● Met with university personnel to discuss their needs used for designs. Reviewed designs by firms that provided designs.
● Engineer of record for all of my designs.
March 2001 - March 2007
Exponent Failure Analysis, Natick, Massachuse s - Senior Electrical Engineer
● Analysized component and electrical system failures that resulted in personal injury and electrical system failures.
● Analyzed failure of The Spiderman ride at Universal Studios and fires that resulted in personal injury and property damage.
● Another project that I investigated was a circuit breaker failure that resulted in an electrician receiving 3rd degree burns on 60% of his body.
● Designs done in accordance with the NFPA 70, NEC, The National Electric Code.
● Developed reports that stated the problem, the cause of the problem and fixes to the problems I investigated.
March 1995 - March 2001
Crosby Valve, Wrentham, Massachuse s - Principal Electrical Engineer
● Invented an instrument called the Valve Monitoring Device (VMD) that was mounted to the top of a Crosby company Pressure Relief Valve. ● VMD Patent No.: US 6,283,138 B1
● The VMD consisted of a microprocessor with inputs from a wire wound potentiometer to measure the position of the valve seat during an overpressure event, a pressure transducer to measure the blow pressure of the valve.
● The microphone was rated at 16 kHz to detect a valve seat leak and notify the seat damage. The microphone could detect leaks of 4 bubbles per minute.
● Designs done in accordance with the NFPA 70, NEC, The National Electrical Code.
● The VMD was rated Explosion Proof so it could be installed in hazardous environments.
March 1989 - March 1995
Powers & Raiche, Rumford, Rhode Island - Electrical Engineer
● Designed renovations to existing facilities. Designs included Power Distribution, Lighting, Communication, Fire Alarm Systems and Security systems and grounding.
● Designs done in accordance with the NFPA 70, NEC, The National Electrical Code.
Education
September 1989 - December 1996
Ren
sselaer Polytechnic Institute, Troy, New York - Master of Science in Electrical Engineering
Graduated on the Dean's List.
September 1984 - September 1989
University of Rhode Island, Kingston, Rhode Island - Bachelor of Science in Electrical Engineering.
Graduated on the Dean's List.
Patent No. US5283138B1
Valve Monitoring Device (VMD) mounted to the top of a Crosby Company Pressure Relief Valve to monitor performance of the valve during an Overpressure Event. Using input from a wire-wond potentiometer to sense position of valve seat, a pressure transducer to monitor the blow pressure, and a microphone tuned to 1600 kHz to detect damage to the valve seat resulting in valve leakage, Could detect a 4 bubbles per minute leak. The device was certified explosion-proof so it could be installed in hazardous environments.