Post Job Free
Sign in

Manufacturing Operations and Continuous Improvement Leader

Location:
New Bern, NC
Posted:
November 24, 2026

Contact this candidate

Resume:

Charles Lee Gaskins

252-***-**** Cell

252-***-**** Home

WORK EXPERIENCE

Value Stream Manager

**** ** **** **** *** Bern nc

Responsible for 8 engineers, 3 production supervisors and 98 production operators.

Developed KPI for company goal achievements

Increased TPM and PM programs to achieve a 12% increase in OEE

Achieved all KPI target in 2025

Reduced overtime by 8% by correct IE standards

0 recordables for current time here.

Senior Staff Manager Operation, Maintenance and Continuous Improvement Leader

2005 to 2024 Electrolux Home Products Kinston N.C. 750 employees

Oversee the daily floor manufacturing of plant operations.

Enforce the company’s safety policy and continue to improve the awareness of the operators to focus on safety issues.

Plan and schedule daily targets make any adjustment for any outages.

Set schedule for planning downtime and PM’s and improvement items.

Teach and practice good house keeping and 5S philosophy.

Ensure on delivery time with shipping schedule and utilize time studies to reduce loading times.

Work with engineering to improve cycle time and lower man hours to improve cost.

Eliminated overtime by starting 12-hour shifts and creating weekly reviews to manage overtime schedule for the plastic department (saving over $ 5,000 per week)

Increase productivity by 5% by improving PM program and reduced cycle of 3000 lbs. injection molding machines.

Maintain maintenance schedule on all 25 forklifts and plan replacement plans after each lease program.

Manage the mold repair and CNC tool room to meet factory daily requirements.

Oversee the manufacturing and Industrial Engineering group on new projects and cost out projects.

Coordinate new designs and quality improvement projects.

Reduced head count by 75 % on 3,000, 1500,1000, and 520 lbs. injection machines by relocation and combine conveyor system. saved 250,000 per year)

Reduced scrap by 5% by training, creating quality standards, and hourly recording.

Plant Manager 1999 to 2005 Toyota ASMO Automotive Greenville N.C.

675 employees

Responsible for company operations on production, production control and production engineering.

Direct and lead all cost downs on all materials and contracts to meet yearly savings 10%

Direct and coordinate the development of the company’s vision and overall philosophy with the president.

Increase plant production by 9.5% without adding equipment or space.

Direct the activities of the plant and constantly review those activities in terms of cost and efficiency of the operation.

Oversee the work of the 18 assistant managers and the 6 managers, assisting in forecasts and determination of goals as well as encouraging continuous improvement of productivity.

Ensure that good quality products are provided to all customers on schedule.

After teaching the total plant about 5S Greenville was North America model plant.

Production/ Maintenance Manager 1998 to 1999 Toyota ASMO

Parts Operation, Plant Maintenance, Press, Fabrication, Plastic, Die Cast Utilities, and Jig Shop

Responsible for benchmark performance by identifying the critical issues, putting plans in place to resolve issues, minimizing the cycle time to close on issues.

Reduced stamping, injection molding, and Aluminum Forging change over time by quick change items and time studies and continuous improvements. Die change from 2.5 hr. to 1.3 hr. Mold change from 1.0 hr. to 32 mines.

Increase productivity by 8 % on CNC machining department by combining group cells.

Develop the capability of the team and implement plans to increase team skill mastery and ongoing self-sufficiency to delivery results.

Reduced total head ct. from 125 to 95 without any loss of production with 5S, Lean Manufacturing, and Time Studies

Provide day-to-day leadership by setting, maintaining and improving the current best standards of the operation.

Reduced head count in the warehouse from 56 to 45 by laying out staging area and creating a map tracking system.

Review yearly contract on cost reduction and saving. (ensure delivery, cost and quality)

Implemented Kan Ban System and lowered inventor form 4 days to 1.5 days.

Implemented milk runs to lower freight cost savings of 5,000 dollars per month.

Develop relationships and provide coaching to ensure the linkage between business results and individual development is consistent with HPWS principles.

Special Training Computer skills

Diversity 1&2 Word, Excel, Power Point

How to Discipline Employees & Correct Performance Problems and Word Perfect

FDA Regulations

OSHA Regulation

Analytic Trouble Shooting

Down Time Utilization

Preventive Maintenance

Budget controls and Plans

In-depth Maintenance Rebuild

Gear Boxes, Clutches, Cylinders, Blowers, Conveyors, and light Electric.

SMED Now

Heavy Hydraulics 1 & 2

State Certified Welder

Lean Manufacturing 1 and 2

Six Sigma

Understanding Total Clean Maintenance

5-S Today

QS-9000, ISO-1400, TS16949 Auditor

Green Belt

EDUCATION

Ayden-Grifton High NC 4 yrs.

NC State 1 yrs. Mech. Engineering



Contact this candidate