● L3AV Specific: MS Office Suite, MS Teams, Smartsheets, ServiceNow, Guru/SOPs, Bloomgrowth, Fastfield, Netsuite. Sharepoint. DES Specific: Google Workspace; Google Guru Program Training; Zoom Workspace; Cherwell; ServiceNow; APP Buyer Arizona; PIJ Portal. Overall Exp.: MS Office Suite – Word, Excel, PowerPoint, Outlook, Visio, MS Project; Lync, Skype for Business, MS Teams, SharePoint / SP Schedule Design/Minor SP Site Editing, Lotus Notes, Citrix (labor input/tracking), Linx, Recruitmax, Peoplesoft, Astea, Clarity, SDLC, Agile, RallyDev, Wells Fargo: Wells Fargo/EPM Project Methodology, Planview, PMUWS, EPM (Clarity) Tool, STAMP, WANDA, EDT-Event Dispositioning Tool, PTS-Patch Tracking Tool, PACMS-(Prod Asset Mgmt), TSC-(Tech Standards Center), AppOne, RCAA Tool

Employment History:

Level 3 Audio Visual

Project Coordinator (11/25 – 10/26)

As a Project Coordinator (PC) assigned to a major global client account, I provided PM support, acting as a critical link in deploying complex AV systems, managing project scope, budget, and schedules. Daily tasks required coordination internally with various PMO - PMs, PCs, Enterprise Project & Compliance Specialist's, as well as Design/Build/Field Engineers, Scheduling Mgr., Warehouse Mgr, Sales/Customer/QA support teams, all in collaboration on assigned Projects to provide design services & functional meeting spaces. Duties required a basic understanding of AV systems design, video conferencing, and control systems (e.g., Crestron, Extron). A vital component in this role consisted of clear & concise communication support, both internally & externally with design/install partners, suppliers & the client to define all their global Business Unit (BU) space needs, providing updates, and ensuring successful installation & system usability in accordance with AV9000 AV industry standards as well as customized standard operation procedures (SOPs) as set forth by the client.

CONSULTANT – (4/2007 through 7/2025) – See Contract Breakdown Below

State of AZ - Dept. of Economic Security (DES) Consultant– PMO Office - Dept. of Technology Services

Project Manager (9/21 - 7/25)

Managed multiple projects based on DES repeatable standards and practices. Projects: TRELLO Project (Kanban/Tracking Tool); Okta B2E (Customer Identity) Project; DES Drupal 9 Website Upgrade Project – 3 Phases; Qualtrics/Voice of the Customer Project; iSPP and eSSP FY23 Project - Updating Security Controls across DES; Hoteling Project - (Facility Space Reservations); DSA Migration and Automation Project (Digital Svcs. Agreement Form Automation); DES Mobility MDM/InTune Project- (Device Mgmt. Upgrade) as Assistant PM; Kudoboard Project – Employee Recognition Tool.

Facilitated project goals, tasks, and resources requirements and assisted in the resolution of conflicts within and between projects. Developed methods to monitor project progress and any required corrective actions. Assisted with managing project budget and resource allocation. Coordinated the development of customer requirements and testing. Worked cross-functionally to solve problems and implement changes. Followed defined, agreed upon project management methodologies. Pro-actively and routinely identified, mitigated and reported project risks / track remediation. Managed staff, resources, budgets, and other requirements for successful project completion. Developed/managed documentation, communication, reporting requirements, working with internal and external agency partners and vendors as required.

Wells Fargo Bank Consultant– Enterprise Info. Technology/Enterprise Functional Technology

Business Systems Consultant (6/20– 6/21)

Served as an Engagement Manager / liaison in support of the Enterprise Application Portfolio Management project to ensure that over 800 applications went through the CIO Records Officer Program (CIORO) Records Remediation Process of bringing legacy Apps to standard Records Remediation requirements. The effort was/is part of a bank regulatory initiative. Worked with the Application Technology Managers (TMs) /LOB Application Business Owners (ABOs) / Group Records Coordinators/Risk Control representatives to remediate all gaps in the records. Served as the liaison between the TMs/ABOs to provide oversight and ensure the work was completed per deadlines set forth. Required heavy communication / follow up skills. Completed the Records Class App Assessment (RCAA) tool to validate App data/records status, completed Gap Analysis documents to identify/remediate GAPs in the data retention, purge, destruction, legal hold record status. Used the AppOne Tool to verify overall App Status/POC/Records Management completion and the CIORO Excel Dashboard on SP to track completion through each stage of the effort.

Wells Fargo Bank Consultant– Enterprise Info. Technology/Application Products Center of Excellence

Implementation Consultant 4 (7/19 – 11/19)

Was a liaison between application partners and server implementation team to track patching events through their proprietary system. Managed requests for patch upgrades/deployments that came through from different vendors such as Adobe Acrobat & SharePoint - that were also responsible for following up. Facilitated meetings as needed, with different internal partners such as application, deployment, or solutions. Updated patch status notes within the tracker, and closed out requests upon completion.

Wells Fargo Bank Consultant– Enterprise Info. Technology/Corporate Risk – Cloud Transition Strategy Project and Checkpoint Endpoint Encryption Replacement Project

Technical Project Coordinator 4 (2/18 – 6/2019)

Ran/had oversight of Package 1 - Channel Secure Workstream, of the Cloud Transition Strategy Project under the Cloud Solutions Program. This effort supported the influx of applications needing external authentication and authorization by executing channel secure integration process and preparation for ongoing sustainment for Azure and Pivotal Cloud Foundry Platforms. This scope of work also included oversight of additional infrastructure into the St. Louis Data Center and remediation as required which completed 12/2018. Ran weekly/bi-weekly workstream status meetings on migration status. Assisted with creation of all workstream project deliverables and approvals maintained in the PMUWS and EPM SOR Tools. Assisted with weekly SOR status note updates, and issues/risks as required. Had ownership/maintenance of project documentation SharePoint site. Assisted with overall project budget/forecast entries and STAMP expense/labor entries/transactions for monthly reconciliation and reporting. Assisted with weekly/monthly reporting for the project/overall program. Attended a variety of weekly/bi-weekly program/project team PM and sponsor team meetings.

Assisted another PM with the Checkpoint Endpoint Encryption Replacement Project which included support of weekly core team and partner meetings for Phase 1 – 3 of the project pilot. Was responsible for documenting weekly core team status note updates including project milestones/timelines, risks, issues, critical tasks and action items in preparation for weekly presentation deck for project partner meetings.

Wells Fargo Bank Consultant– Enterprise Info. Technology – TMT ITAM – Eco Solutions Asset Mgmt. Project

Project Manager (5/17 – 8/17)

Supported the ITAM Project Print Team with the transition of all missing print devices into the required enterprise-wide corporate asset management tool, Remedy, for the purpose of standardizing support services for all print devices. Worked in conjunction with the Eco Device Print Team deploying new printer equipment/process throughout all locations. Coordinated with various Line of Business LOB) liaisons to confirm missing printers from a daily report, and obtain their ID information in order to submit for shell record creation into Remedy.

Wells Fargo Bank Consultant– Enterprise Info. Technology – TMT ITAM Project

Project Manager (3/17 – 5/17)

Supported the Wholesale Specialized Support Services (SSS) Team Technology Manager, for the Wholesale Line of Business (LOB), with the transition of their computing assets support and procurement to a corporate managed enterprise support services solution. The LOB groups included: SSS/Wholesale Insurance, International, Wholesale Loan Services, Wholesale Finance, Wholesale Technology. Worked towards Readiness Deadline of 5/30/17 with Management Reporting and Analysis (MRA) 6/30/17 hard deadline. Worked with various groups to confirm configuration depot image testing towards completion for their hardware procurement requirements. Attended status & test meetings, took minutes and tracked action items.

Wells Fargo Bank Consultant– Enterprise Info. Technology - Service Delivery/DSO/Enterprise Patching

Business Systems Consultant (BSC) (2/16 – 3/17)

Supported the Workflow Automation (WFA) Stop/Start (S/S) Project, with the scope to automate the stop and start of applications, middleware, and databases on all UNIX / Linux servers for the maintenance automation effort - in compliance with Wells Fargo Corporate mandate to upgrade Application patching from a 90-day to a 30-day window. As a BSC, I was responsible for managing assigned application engagements within the five major Lines of Business (LOB) from the point of initiation with application teams towards engagement closure. This effort included validating existing s/s scripts, new s/s script requirements, script QA coordination, implementation of s/s scripts, and closure activities. Heavy interface with Application / Technology Managers and teams including Tech Relationship Managers, App. System and/or Info Security Engineers, Database Analysts, Web Developers, etc. was required. Worked closely with fellow WFA Team BSCs on primary app. / associated/secondary installed app. crossover. Facilitated Initiation / Kickoff Meetings, Technical Deep Dive Meetings with Technical PM or SMEs, and Implementation Readiness Meetings for Implementation Coordinator (IC) handoffs. Updated/maintained engagement status logs in SharePoint, the status of all application servers in Excel Master Server List (MSL), and SharePoint engagement folders including server lists, meeting minutes, email communications and closure artifacts. Participated in bi-weekly WFA S/S Team Meetings, and weekly Core BSC/IC Team Meetings to discuss general project updates and engagement kickoff/closures/total in flight status. Helped create/document WFA S/S project workflow procedures, and conducted assigned workflow training presentations for new BSCs.

American Express Consultant – DT CTH, American Express Technology

Delivery Transformation (DT) Contract to Hire (CTH) Administrator – (9/15 – 2/16)

Provided support of Delivery Transformation Program Technology hiring fulfillment. As a liaison to AMEX hiring leaders, worked with DT CTH Program vendor partners to place top technology talent pursuant to DT CTH Program goals/initiatives. Was hired to perform role as DT CTH Administrator / liaison role for the UK launch of talent fulfillment for the DT CTH Program which was delayed. Heavy communication daily between hiring leaders and their organization hiring coordinators, AMEX recruiting team, DT CTH Regional PMs, Administrator team colleagues as well as vendor representatives. Managed DT CTH Inbox per schedule, processing new vendor submittals and resubmittals – from the point of presentation/CTH interview / acceptance to the final conversion step as a full time hire. Heavy status tracking / updates and collaboration between DT CTH team including daily Scrum team calls and weekly Tag Up meetings in alignment with Agile project methodology used by the DT PMO.

Wells Fargo Bank Consultant– Technology Operations Group –IS Org – Enterprise Release Mgmt.

Implementation Consultant (4/15 – 5/15)

Provided release coordination support to the IS Org. CIO Lines of Business in service of the Enterprise Release Management group. Coordination involved running daily status reports and providing heavy communication / support to Project Managers in an effort to assist them in meeting the various Release Readiness stages of their software development implementation code release/test activities and deadlines.

Wells Fargo Bank Consultant– Technology Operations Group – TIS Org – EPTS

Project Coordinator (11/14 – 2/15)

Provided project management/coordination support to the TIS PMO for the Chandler Campus Build Project. Monitored project tracking to ensure successful compliance of schedule and milestone deliverable requirements within the Project Mgmt. Universal Work Station (PMUWS) tool/system of record (SOR). Managed SharePoint project documentation in accordance with TOG Project Methodology standards. Created TPM Deliverable Checklist to meet the project compliance requirements. Worked closely with TOG Governance Team to ensure project deliverables met standards. Responsible for Change/Risk/Issue (CRI) management tracking/resolution. Responsible for MS Project Plan / Server upload/updates, Change Management/Change Control submissions in alignment with Risk Management/Compliance requirements. Managed Issue / Risk updates in Sharepoint and PMUWS. Managed Chandler Bldg. project move leadership meetings - coordination and minutes and maintained Action Item Log/Resolution tracking. Attended PMO CPG Leadership meetings, Chandler Build Project CPG Group Construction Meetings, TIS Town Hall meetings as well as TIS PM Community of Practice meetings. Created SharePoint STAMP project tracking resource forecast list. Made minor SharePoint project site content updates / member access updates.

AZ Department of Environmental Quality (ADEQ) Consultant – myDEQ Portal Project

Project Coordinator (1/14 – 9/14)

Agile Project – Project schedule maintenance/updates including regular re-baseline updates and SharePoint dashboard updates. Attended weekly Core Team Project Meetings and Stakeholder Meetings. Maintained Core Team agendas/content review. Attended Scrum of Scrum and Project Status Meetings / provided Scrum Team support. Project-wide tracking of action items – created SharePoint AI tracking log including owner status update / participation. Posted process, financial, deliverable documentation and alerts to project SharePoint site, updating shared team documentation. Created miscellaneous SharePoint project site document storage libraries and links as requested / minor SP page editing. Monthly Project Reporting / Weekly Labor Burndown Rate Reporting. Participated in QA / UAT testing as needed. Provided project new hire onboarding assistance / developed onboarding process / checklist and new hire orientation guide.

Wells Fargo Bank Consultant– Technology Operations Group/Information Services

Tech Project Coordinator (10/12 – 1/14)

Project Coordination service & support for the Project Delivery Services Group in support of IT customers in the Technology Infrastructure Services (TIS) organization, and various internal Lines of Business (LOB). Assigned to provide project coordination support to the TIS PMO for the Win7 Transformation Project. Monitored project tracking to ensure successful compliance of schedule and milestone deliverable requirements within the Planview project tracking tool/system of record (SOR) in accordance with TOG Project Methodology standards. Worked closely with TOG Governance Team to ensure project deliverables met standards. Provided Change/Risk/Issue (CRI) management and resolution. Performed Change Management/Change Control submissions in alignment with Risk Management/Compliance requirements and performed Issue / Risk updates in SharePoint and Planview. Managed program leadership meeting coordination and minutes, and workstream group meeting participation/support. Assisted with Win7 migration user support mailbox coordination. Coordinated/attended team project offsites/events. Used Word, Excel, Outlook, Lync, Powerpoint, Visio, Project, Sharepoint, Planview, STAMP, PMUWS (new SOR tool).

American Express Consultant

Project Coordinator (4/12 - 8/12)

Project Coordination / reporting for Project Management Office (PMO) of Data Center Move Project. Prepared weekly program status report data received from Program Project Managers for all work streams, tracking milestone completion activity project-wide. Ran Excel data extract reports to prepare Excel workbook for weekly PowerPoint presentation for PMO Status meeting. Prepared and published weekly PMO Status Meeting Minutes. Prepared weekly Issues/Risks/Changes Report for PPMs, and bi-weekly Executive Issues/Risks Meeting Report and Minutes. Prepared weekly L0 Milestone Report and Operational Readiness Report. Updated project risk/issue/change request activity in Clarity for PPMs.

Wells Fargo Bank Consultant– Technology Operations Group/Information Services

Tech Project Coordinator (5/11 – 2/12)

Project Coordination service & support for the Project Delivery Services Group in support of IT customers in the Technology Infrastructure Services (TIS) organization. Monitor project tracking and ensure successful compliance of schedule and milestone deliverable requirements within the Planview project tracking tool/system of record in accordance with TOG Project Methodology standards including Change Management/Change Control submissions to ensure project met Risk Management/ Compliance Requirements. Provided implementation support on a TIS Communications Room/Server Security Remediation project including SharePoint vendor/equipment updates, Sharepoint design, and site readiness management, issue management/resolution, and PO submissions. Delivered successful project ahead of schedule and under budget. Provided Project Coordination for a TIS Shared/Virtual Platform Migration- internal support transition project. Also delivered ahead of schedule/under budget. Used Word, Excel, Outlook, Sharepoint, Planview, WANDA-PO system.

Previous Assignment:

Executive Assistant (12/10 – 5/11)

Executive Administrative support to 3 Wells Fargo Bank Technology Operations Group/Information Services IS Headquarter Executives - Project Delivery Services (PDS) Group Technology Mgr., Chief Architect and Head of Strategy & Efficiency Management (Corporate Vendor Management). Also supported the IS Implementation Consultant. Provided project administration to the Wells Fargo Strategic Development and Architecture (SDA) - Innovation Team within Project Delivery Services, on all Wells Fargo product and services innovation initiatives including, but not limited to, new concept submittals/tracking, creation of concept process information/communication postings, patent submittal/tracking support, internal PDS and Innovation newsletter submissions as well as SDA SharePoint site information/documentation and workstream facilitation/input/collaboration. Used Word, Excel, Outlook, Powerpoint, Wells Fargo travel database, and Visio on Innovation project flowcharts.

Various Administrative/Project Contract Roles - 4/07 – 12/10 - (List can be provided upon request.)

American Express Consultant

Project Coordinator (3/07 – 4/07)

Managed and tracked network infrastructure projects; assigned, scheduled and tracked project work activity for Technical Engineers, initiated process improvements, including increased communications and milestone productivity.

Build/Project Coordinator (Bus. Analyst) (9/06 – 1/07)

Managed/performed project status tracking and status reporting including inputs from cross functional teams. Input new server build service requests and rebuild requests in tracking sheet daily. Emailed new server build assignments to Service Administrators (SAs) on Windows and Unix Teams. Opened activity for SAs in AMEX Service Request System. Attended daily project status call. Updated project status tracking sheet daily from email updates and daily status calls. Monitor delivery date completions / problems & escalations status and follow-up from all cross functional support teams. Sent server build completion emails daily; closing out activity in SR system upon build completion. Calculated build cycle time for daily completions in tracking sheet. Performed weekly status reporting. Attended daily duration/scheduling conference calls with Sr. Build Coordinator on server build cycle time / project scheduling. Used Word, Excel, MS Project, EPIC Proj. Mgmt. tool.

Pomeroy IT Solutions (Alternative Resources Corporation ~1year - prior to Pomeroy IT purchase of ARC)

Project Coordinator (5/04 – 4/06)

Managed high volume short-term IT Deployment Projects. Worked with a team of internal recruiters to fulfill technician resource requirements. Managed resource deployment activities, resource orientation, resource timecard/expenses, performed all reporting and billing for projects. Worked with various project clients to ensure deployment was fulfilled according to Statement of Work. - Pomeroy project resume available for detail. Used Word, Excel, MS Project, IBM Lotus Notes, Groupwise, Citrix tool, Linx, Recruitmax, Astea,

5/97 to 5/04 – CONSULTANT – Various Metro Phoenix Executive Admin, Admin Assistant, Office Mgr. Roles

Allied Signal Aerospace, Phoenix Arizona

HR Department Assistant (1/96 – 4/97)

Prepared/typed business correspondence, prepared travel arrangements/ran automated travel & expense reports, coordinated schedules/meetings for HR Generalists. Prepared presentations/various program tracking reports for HR team and various associate teams. Coordinated training schedules for all associates on new benefits programs, FAA Compliance Programs, policies, etc. Compiled and cross-referenced data for Fall/Spring Management Resource Review (MRR) Process. Ran/maintained files & internal/external reporting for Phx. R&O FAA Drug and Alcohol Testing Program, developed new testing process & procedures (took program from audit fail status in 1995 to 100% FAA compliance in 1996). Customer Satisfaction - provided associate feedback/troubleshooting on individual HR related issues & concerns; heavy HR interface with R&O management team & associates. Assisted HR Generalists in development, and streamlining proper usage of all HR policies/procedures in support of department and corporate standards & requirements. Created/implemented R&O HR Dept. infrastructure/policies for R&O organization as needed. Provided to and elicited support from the various ASA-wide HR teams, MS&S public affairs team and MS&S legal department relative to general HR associate issues & communications. Served as PC Focal Point for the entire MS&S Phx. based HR Team in support of the Business and Information Systems group migration of the Company to a new technology platform called GlobalLink. Used Word, Excel, Powerpoint, Outlook, HRIS-HR Database and Peoplesoft-HR Management tool.

McDonnell Douglas Aerospace, Mesa Arizona

Senior Secretary (1/91 – 12/95)

Supported growth/development of the company from 52 personnel in 1991 to 280 personnel in 1995; a growth from $3 million in sales per year to $40 million. Frequent multilevel management interface with internal customers, domestic/international clients, government representatives, consultants; handled many protocol issues independently on behalf of Director. Composed large volume of business correspondence; typed presentations, proposals, spreadsheets; made heavy domestic/international travel arrangements for Director and his staff; coordinated Director’s schedule with his staff and all internal/external customers. Led administrative empowered team, coordinated various company awards & several personnel training programs. Established/streamlined office filing systems, desktop instructions and administrative procedures. Conducted company team building/solicitation efforts, initiated office automation/training improvements. Managed flow down of new procedures throughout the organization. Coordinated all organization-wide internal/external/client social events. Used Word, Excel, Outlook, Powerpoint.

CONSULTANT

Intel Corporation, Chandler, Arizona

Secretary II and III 1/89 – 10/90)

Various administrative contract positions within the company; the most long-term position was providing administrative support to the Director of Marketing, CMAD Division. Typed business correspondence, spreadsheets, management presentations, maintained department filing systems, coordinated inter-departmental meeting schedules, catering functions, travel arrangements and the schedules for the Director and his staff. Provided assistance to domestic and international marketing clientele. Participated in the marketing department administrative staff meetings; its primary focus to track/streamline continuous improvement in support of management team and all personnel. Used Word, Excel, Outlook, Powerpoint.

EDUCATION:

● Partial Bachelor's Degree, University of Phoenix, Phoenix/Mesa, AZ (Completed approximately 1/3 of Program in Business Management / Information Systems)

● Diploma, Oxford H.S., Oxford MS



Contact this candidate