Post Job Free
Sign in

2nd shift Supervisor.

Location:
Bolingbrook, IL
Salary:
93,000 - 105,300
Posted:
November 21, 2026

Contact this candidate

Resume:

Enrique (Rick) Rivera

****.********@*****.***

630-***-****

MANUFACTURING LEADERSHIP PROFESSIONAL

Bilingual in Spanish and English. A solid, results driven, approachable and coaching manufacturing leader with over 20 years’ experience in plastic and rubber molding. Served as a manufacturing supervisor with increasing responsibilities. A well-organized leader that strives to make others successful and enjoy building well performing teams. Involved in 2 plant transition, multiple CI projects, a high impact Six Sigma Green Belt project, and have led key implementation projects for 5S, Visual management, TPM, SMED, and Safety awareness. Excellent organizational skills along with a strong work ethic and a desire to succeed and improve along with removing barriers to progress by means of training, waste identification, elimination and by building quality into the process/product.

Key Areas of Expertise

Rubber Compression & Injection Molding – Plastic Molding – Automation – Manufacturing Leadership – Quality

Rapid Problem Solving – Continuous Improvement – Kaizen – Standard Work Creation - 5S – SMED – TPM

Waste Identification – Kanban – Material Replenishment – Furniture Upholstery

Training

Net Suite ERP system – CMS ERP system – IQMS ERP system – Lean leadership – Forklift Trainer

First Aid/CPR – Paulson, Molding training – Whitman, Robotic training – Single Piece Flow Simulation

Safety, Honeywell – ASTM, Rubber insulating safety equipment.

Work Experience

All Type (Home) Construction – Aurora, IL 2026 - Current

Construction Worker

Replace Windows

Drywall

Pergo Flooring Installation

Wood Floor Sanding

Electrical

Automotive Repair – Bolingbrook, IL 2020 – Current

Personal Business

Brakes.

Tune up.

Front end.

Engine.

Drive Train.

Oil Change.

Automotive Repair – Port Charolette, FL 2025 – 2026

Family Business – Jesus Tires/ Automotive

Brakes.

Tune up.

Front end.

Engine.

Drive Train.

Oil Change.

Motor Trouble Shoot.

Geka Med Mix I Blow Molding – Elgin, IL 2025 - 2025

Production Supervisor

Blow molding machine trouble shooting

Adjust Foil automation machine

KPI

GMP

Hire/ Fire

Disciplinary action

Employee Evaluation

Cat I Glass – South Elgin, IL 2024 - 2024

2nd + 3rd Shift Supervisor

Schedule up to 40 employees

Schedule line leads

Efficient production start up

Quality inspections

5S

Lean

Responsible for 2nd and 3rd shift 2 separate buildings

Added a safety rule. All must wear safety shoes. Working with heavy glass.

Menasha Packaging – Aurora, IL 2023 - 2024

2nd shift Supervisor

Schedule up to 90 packers of dry food goods (FDA).

Schedule Line Leads.

Schedule Forklift drivers.

Controlled attendance for employees.

Scheduled CI and safety ideas to the work force.

Attended daily management meetings.

I was a crucial part of Quality because there wasn’t any support on the 2nd shift.

Started Line lead meetings before the start of shift.

Filled out incident reports.

Used SAP ERP system for production and inventory.

Responsible for 17 packaging lines.

Trelleborg Sealing Solutions – Streamwood, IL 2021 - 2022

1st & 2nd Shift Production Supervisor

Scheduled employees for 2 shifts to workstations/cells

Prioritized work orders with master scheduler.

Prioritized cell workload with team leaders.

Conducted shift hand off with 2nd shift team leader.

Managed: 4 Team leaders, 1 Material handler, 24 Machine operators.

Attended: QC meetings, Safran meetings, Production meetings with groups as needed.

Started to implement 5S, Continuous improvements. Reorganized Customs dept.

Scheduled in packing all the WIP that was waiting to be processed. Which opened floor space.

Started to work on cross training employees.

Started to work with the molding team for better mold change efficiencies.

Responsible for 12 CNC machines.

Responsible for 14 Injection molding machines.

Norix Group, Inc. – West Chicago, IL 2020 - 2020

1st Shift Production Supervisor

Presented daily shift tier meetings on various topics, including Safety, Quality, Production, CI and 5S.

Scheduled employees to workstations/cells.

Provided work orders to workstations/cells.

Provided production schedules to the team leaders.

Implemented 5S program.

Started to assemble safety team.

Started to assemble a continuous improvement program.

Midwest Molding Inc. – Bartlett, IL 2016 – 2020

1st Shift Plant Supervisor

Attended supervisor shift handoff.

Provided daily production work schedule to team leaders.

Scheduled mold changes with mold set up group.

Prioritized machine operations {start up, sampling, completed orders} with process technicians and engineering.

Prioritized mold repair schedule with Toolroom.

Attended daily management production meeting.

Managed: 4 Process techs, 2 Set up techs, 5 Material handlers, 9 Team leaders and up to 32 machine operators.

Implemented Safety Procedures, 5S, and Lean practices.

Attended Paulson Molding training.

Attended Matsui Dryer training.

Attended IQMS training (ERP) system.

Interviewed new hires – Set up, Material handlers, Team Leaders, Operator.

Electric Plastic molding presses – 55T-750T – JSW, Toyo, Krauss Maffie, Arburg, Engel, Husky.

Whittman robots.

Salisbury by Honeywell – Bolingbrook, IL 2002 – 2016

Manufacturing Supervisor

Supervised one team leader and twelve hourly production personnel across multiple tasks such as injection molding technicians, compression molding technicians, electrical testing associates, and assemblers.

Maintained daily operations of 7 Tung-Yu rubber compression presses ranging from 350 Ton to 800 Ton clamp force; 7 REP rubber injection presses ranging from 200 Ton to 600 Ton clamp force; 1 110 Liter Tilt discharge rubber mixer, 6 pieces of electrical equipment and various other custom pieces of equipment.

Lead daily problem solving to root cause using Ishakawa Diagram and 5-Why analysis.

Supported daily safety observation goals and continuous improvement goals.

Drive manufacturing excellence in support of KPI’s; Safety, Quality, Delivery, Cost, and Inventory

Scheduling daily production activities along with mold change and setup

Troubleshoot compression and injection molding machines.

Interviewed new hires, evaluation, and discipline functions with hourly personnel along with tracking time and attendance.

Trained all new operators in labor reporting and inventory transactions using CMS ERP/MRP system.

Tracked all operator training via training/cross-training matrix.

1st aid and CPR certified

1 year mold set up – Hands on

Scrap reduction by scheduling mixing rubber and mold changes.

Performed process maps to identify and eliminate waste in mold/tool setup and change-over.

Accomplishments

Key member of transition team moving 2 older facilities into the new Bolingbrook facility with “Zero” customer impact

Implemented operator TPM program on critical equipment.

Led TPM, PM, and Set UP reduction teams to HOS Bronze status.

Led a Six sigma green belt project to double blanket electrical testing capacity; from 18 blankets per hour to 36; resulted in $80K annual savings and $150K additional capacity cost avoidance.

Authority to hire, discharge, review and train employees.

Decreased labor usage 15% with new line layouts and improvements.

Document and input production rates, scrap and all quantities for further analysis.

Education

Honeywell: Six Sigma Green Belt Certificate

Lincoln Technical Institute: Diploma

Triton College: GED



Contact this candidate