Enrique (Rick) Rivera
****.********@*****.***
MANUFACTURING LEADERSHIP PROFESSIONAL
Bilingual in Spanish and English. A solid, results driven, approachable and coaching manufacturing leader with over 20 years’ experience in plastic and rubber molding. Served as a manufacturing supervisor with increasing responsibilities. A well-organized leader that strives to make others successful and enjoy building well performing teams. Involved in 2 plant transition, multiple CI projects, a high impact Six Sigma Green Belt project, and have led key implementation projects for 5S, Visual management, TPM, SMED, and Safety awareness. Excellent organizational skills along with a strong work ethic and a desire to succeed and improve along with removing barriers to progress by means of training, waste identification, elimination and by building quality into the process/product.
Key Areas of Expertise
Rubber Compression & Injection Molding – Plastic Molding – Automation – Manufacturing Leadership – Quality
Rapid Problem Solving – Continuous Improvement – Kaizen – Standard Work Creation - 5S – SMED – TPM
Waste Identification – Kanban – Material Replenishment – Furniture Upholstery
Training
Net Suite ERP system – CMS ERP system – IQMS ERP system – Lean leadership – Forklift Trainer
First Aid/CPR – Paulson, Molding training – Whitman, Robotic training – Single Piece Flow Simulation
Safety, Honeywell – ASTM, Rubber insulating safety equipment.
Work Experience
All Type (Home) Construction – Aurora, IL 2026 - Current
Construction Worker
Replace Windows
Drywall
Pergo Flooring Installation
Wood Floor Sanding
Electrical
Automotive Repair – Bolingbrook, IL 2020 – Current
Personal Business
Brakes.
Tune up.
Front end.
Engine.
Drive Train.
Oil Change.
Automotive Repair – Port Charolette, FL 2025 – 2026
Family Business – Jesus Tires/ Automotive
Brakes.
Tune up.
Front end.
Engine.
Drive Train.
Oil Change.
Motor Trouble Shoot.
Geka Med Mix I Blow Molding – Elgin, IL 2025 - 2025
Production Supervisor
Blow molding machine trouble shooting
Adjust Foil automation machine
KPI
GMP
Hire/ Fire
Disciplinary action
Employee Evaluation
Cat I Glass – South Elgin, IL 2024 - 2024
2nd + 3rd Shift Supervisor
Schedule up to 40 employees
Schedule line leads
Efficient production start up
Quality inspections
5S
Lean
Responsible for 2nd and 3rd shift 2 separate buildings
Added a safety rule. All must wear safety shoes. Working with heavy glass.
Menasha Packaging – Aurora, IL 2023 - 2024
2nd shift Supervisor
Schedule up to 90 packers of dry food goods (FDA).
Schedule Line Leads.
Schedule Forklift drivers.
Controlled attendance for employees.
Scheduled CI and safety ideas to the work force.
Attended daily management meetings.
I was a crucial part of Quality because there wasn’t any support on the 2nd shift.
Started Line lead meetings before the start of shift.
Filled out incident reports.
Used SAP ERP system for production and inventory.
Responsible for 17 packaging lines.
Trelleborg Sealing Solutions – Streamwood, IL 2021 - 2022
1st & 2nd Shift Production Supervisor
Scheduled employees for 2 shifts to workstations/cells
Prioritized work orders with master scheduler.
Prioritized cell workload with team leaders.
Conducted shift hand off with 2nd shift team leader.
Managed: 4 Team leaders, 1 Material handler, 24 Machine operators.
Attended: QC meetings, Safran meetings, Production meetings with groups as needed.
Started to implement 5S, Continuous improvements. Reorganized Customs dept.
Scheduled in packing all the WIP that was waiting to be processed. Which opened floor space.
Started to work on cross training employees.
Started to work with the molding team for better mold change efficiencies.
Responsible for 12 CNC machines.
Responsible for 14 Injection molding machines.
Norix Group, Inc. – West Chicago, IL 2020 - 2020
1st Shift Production Supervisor
Presented daily shift tier meetings on various topics, including Safety, Quality, Production, CI and 5S.
Scheduled employees to workstations/cells.
Provided work orders to workstations/cells.
Provided production schedules to the team leaders.
Implemented 5S program.
Started to assemble safety team.
Started to assemble a continuous improvement program.
Midwest Molding Inc. – Bartlett, IL 2016 – 2020
1st Shift Plant Supervisor
Attended supervisor shift handoff.
Provided daily production work schedule to team leaders.
Scheduled mold changes with mold set up group.
Prioritized machine operations {start up, sampling, completed orders} with process technicians and engineering.
Prioritized mold repair schedule with Toolroom.
Attended daily management production meeting.
Managed: 4 Process techs, 2 Set up techs, 5 Material handlers, 9 Team leaders and up to 32 machine operators.
Implemented Safety Procedures, 5S, and Lean practices.
Attended Paulson Molding training.
Attended Matsui Dryer training.
Attended IQMS training (ERP) system.
Interviewed new hires – Set up, Material handlers, Team Leaders, Operator.
Electric Plastic molding presses – 55T-750T – JSW, Toyo, Krauss Maffie, Arburg, Engel, Husky.
Whittman robots.
Salisbury by Honeywell – Bolingbrook, IL 2002 – 2016
Manufacturing Supervisor
Supervised one team leader and twelve hourly production personnel across multiple tasks such as injection molding technicians, compression molding technicians, electrical testing associates, and assemblers.
Maintained daily operations of 7 Tung-Yu rubber compression presses ranging from 350 Ton to 800 Ton clamp force; 7 REP rubber injection presses ranging from 200 Ton to 600 Ton clamp force; 1 110 Liter Tilt discharge rubber mixer, 6 pieces of electrical equipment and various other custom pieces of equipment.
Lead daily problem solving to root cause using Ishakawa Diagram and 5-Why analysis.
Supported daily safety observation goals and continuous improvement goals.
Drive manufacturing excellence in support of KPI’s; Safety, Quality, Delivery, Cost, and Inventory
Scheduling daily production activities along with mold change and setup
Troubleshoot compression and injection molding machines.
Interviewed new hires, evaluation, and discipline functions with hourly personnel along with tracking time and attendance.
Trained all new operators in labor reporting and inventory transactions using CMS ERP/MRP system.
Tracked all operator training via training/cross-training matrix.
1st aid and CPR certified
1 year mold set up – Hands on
Scrap reduction by scheduling mixing rubber and mold changes.
Performed process maps to identify and eliminate waste in mold/tool setup and change-over.
Accomplishments
Key member of transition team moving 2 older facilities into the new Bolingbrook facility with “Zero” customer impact
Implemented operator TPM program on critical equipment.
Led TPM, PM, and Set UP reduction teams to HOS Bronze status.
Led a Six sigma green belt project to double blanket electrical testing capacity; from 18 blankets per hour to 36; resulted in $80K annual savings and $150K additional capacity cost avoidance.
Authority to hire, discharge, review and train employees.
Decreased labor usage 15% with new line layouts and improvements.
Document and input production rates, scrap and all quantities for further analysis.
Education
Honeywell: Six Sigma Green Belt Certificate
Lincoln Technical Institute: Diploma
Triton College: GED