Robert J. McBride, R.A. Pawling, NY *****
******************@*****.***
914-***-**** cell License Number: 027525-01
SUMMARY OF QUALIFICATIONS
Provides Interior and Exterior Envelope Design from 25 years of experience
Writing Specifications/ Scope reports / Technical reports for various Architectural firms
Reviewed Drawings, Wrote Specifications and Technical writing, Reviewed Shop Drawings and reviewed Structural and MEP Design coordination
Worked with VRH Construction Corporation, Englewood, NJ for Delta Airlines as a
Quality Assurance (QA) Manager in the construction trailer at LaGuardia Airport NY and Assistant QA Manager for J Kokolakis Contracting Inc., Bohemia, NY at Corps of Army Engineers Caven Point, Jersey City, NJ.
Reviewed Drawings, Specifications and Technical Writing for all Engineering Trades with Architecture in New York State, NYC, NJ and CT.
Understanding of the Constructability review required before completion of construction drawings provided to Contractors. Coordination of trades to be noted and shown as required on architectural drawings. Masonry expert dealing with new and restoration.
WORK HISTORY
Consultant to following Architects from 6/2017 to present:
James Nixon, R.A. in the Village of Brewster, NY and Connecticut- Worked on additions and homes. Provided Details, Sections for exterior/interior and structural design with coordination of MEP. Reviewed Quality of Documents for Construction.
Bryan Brown, R.A. Architects, Pound Ridge, NY- Worked on the design of high-end residential Projects as a Consultant. This included two homes/estates in Greenwich, CT. Provided Sections and Details to scale and coordinate with mechanical, electrical and plumbing. This included reviewing the structural design to verify it was compatible with architecture and would meet intended loads anticipated safely. Red lined existing structural and MEP drawings for further review by engineering. Provided exterior and interior construction Sections and Details. This work was done on a Irena Skoda, R.A. team.
Irena Skoda, R.A. Skoda Design + Architecture, Queens, NY. - Worked on 6 story Passive Manhattan Brownstone envelope with 100-year- old 4-story brick walls with new 5th and 6th floor masonry envelope walls and roof on 95th St. in Manhattan. Old envelope walls needed to become non-structural. Therefore, a new steel structure with columns and beams was designed to support all six floors at elevations we chose to meet interior design requirements. Provided interior design and net-zero energy usage design using solar panels vertically at the south elevation and on the roof. We also designed a prefabricated 4-story apt. building for Queens and other multi-family Projects. Latest Project in City of North Port, Florida is a one family Dome House with accessory buildings.
Robert Palermo, R.A. Corporate Design of America, P.C., Coney Island, Brooklyn, NY – Designed Medical offices, childcare facilities, office buildings and multi-family projects. We also worked on single family homes/additions in Brooklyn, NY. I provided structural and envelope design including interior design layouts coordinated with MEP. 6/2017-Present (Four Firms Above)
NYC Dept. of Environmental Protection (Consultant) 59-17 Junction Blvd., Corona, NY- Engineering Audits Office 12th Floor- Auditor Provided auditing of multi-million - dollar Change Orders for Renovation Work for Wastewater and Water Treatment Plants and other facilities. Reviewed Engineering Design Firms and Contractors Work. This included the review of architectural and engineering drawings and specifications for errors and omissions. 1/2016-3/2017
Perkins Eastman-S9 in NYC and NJ (Consultant) Senior Architect Quality assurance peer review work for all trades (MEP and Structural) of multi-million dollar mid-rise and high-rise Residential Projects. I provided detailing, industry standards, space planning and specification back-up information. Firm now named S9 Architecture & Engineering NYC and NJ. 3/2014-10/2015
VRH Construction Corporation, Englewood, NJ (Consultant to Delta Airlines) Quality Assurance Manager in field at LaGuardia Airport reviewing drawings, shop drawings, Manufacturer’s catalog information and Contract Documents for work to be done in field. I wrote Request for Information or RFI’s to the Design Firms for them to supply additional information to the General Contractor. Took photos for the Daily Contractor’s Report. Fast tracked using photos for Port Authority Approval of long spanned truss connections for Terminal C and Terminal D Connector Building. I provided Drawings to revise Fire Exit Stairs at Connector and other locations. Reviewed design Specifications and Drawings for Quality Assurance. 7/2012-3/2014
Corporate Design of America, P.C., 1816 Voorhies Ave., Brooklyn, NY Manager/Architect/Estimating/Marketing for Multi-family Residential and Commercial Building Projects. Additions and one family homes were also designed. 4/2008-6/2012
Ismael Leyva Architects P.C., 48 W. 37th Street, New York, NY Quality Assurance Manager of Design of high and mid-rise multi-family Residential Project’s interiors and exteriors working with major Real Estate Development Firms. Related was one of them. 9/2006-3/2008
Dattner Architects, New York, NY working at 2 Broadway, New York, NY Consultant on Subway Project -Worked on the redesign of the #7 Subway Line and planning all systems, architecture and all trades. Provided coordination for traction power, communication conduits, electrical conduits in Subway Station(s). This included support tunnels and support building architecture on grade to provide mechanical systems and others for the Subway Station(s) architecture. 2/2006-9/2006
Silvester Tafuro Design/ TRANSYSTEMS, 50 Washington Street, Norwalk, CT Provided programming, conceptual design, interior and exterior design development, construction documents, project coordination and Quality Assurance review for airport terminal drawings and specifications. Worked on American Airlines at JFK and others. 4/2004-2/2006
STV Incorporated, 225 Park Avenue, New York, NY (Moved to Empire State Building) Architect, designer, manager, coordinator of engineering trades with architecture including terracotta, slate and copper roofs including specifications. Worked on over 100 SCA School Projects, Light Rail to JFK, residential and stores. I coordinated MEP, sprinkler systems and structural with architecture with STV Engineers. Reviewed all Construction Documents for Quality Assurance. 3/1997-3/2004
Education: New York Institute of Technology, B.S. in Architecture, Westchester Community College, A.A.S. in Civil Engineering, LEED Green Associate July 2010 and New York State Registered Architect 1999 # 027525-1
Major Projects
1.Provided Additions, Renovations and Home Construction with Designs for over (20) Clients in New York and Connecticut with Associates.
2.Renovation programming Designs of existing Schools for masonry restorations with interior renovations and new schools for the NYC School Construction Authority SCA.
3.Designed prefabricated exterior walls with Ismael Leyva Architects for many hi-rise and mid-rise condominium projects that included curtain wall, window wall, prefabricated exterior metal stud walls, precast concrete walls with internal insulation and rain screen cladding systems.
4.American Airlines Terminal at JFK Airport, Queens, NY (2004-2006) with Silvester Tafuro Design / TranSystems. Design review for QA based on Terminal circulation with fire, life safety. This included review of fire separations and basic design requirements.
5.SHPO Project for SCA at Curtis High School, Staten Island, NY with STV Incorporated.
Provided exterior masonry restoration and preservation with copper and slate roofs with terracotta units.
6.Provided field survey and architectural design with engineering coordination for the Yonkers, NY Board of Education as a Consultant to Antonucci & Associates Architects and Engineers in Pelham, NY. Provided exterior masonry restoration & interior design work.
7.Morgan Building Post Office at 9th Avenue and 29th Street in Manhattan with Ismael Leyva for roof replacement. Building size is one square block. Led survey team concerning existing drain locations, roof slopes to drains and future installation of a white roof. I had a drawing created to indicate field conditions and what revisions were needed to use a white roof. The result was a Design Change to a GREEN ROOF to use the old 60 feet drain spacing in each direction rather than adding drains to space drains
30 feet apart. The closer spacing would allow ” per foot slopes to drains which is recommended for white roofs.
Skills and Experience
1.Reviewed and researched documents for coordination adding constructible details, field surveying and shop drawing review.
2.Coordinated inspections of School Boiler Rooms with a team including a Mechanical and Electrical Engineer for STV Incorporated and other firms.
3.Provided details and reviewed concrete encased electrical service at 110 Wall Street, New York, NY relocated from cellar to 2nd floor above flood level for Perkins Eastman-S9.
4.Provided architecture for flood protection of existing and new MEP Rooms with the NYC Department of Environmental Protection.
5.Provided architectural design for VRH Construction Corporation to protect installation of 5 KV Transformer Room below gang toilets at Terminal ‘D’ Delta Club, LaGuardia Airport.
6.Recommended roof dunnage designs as required to suit type of roofing.
7.Reviewed placement of roof generator including sound proofing of enclosure for walls, roof and doors for Perkins Eastman-S9 in NYC.
8.Provided designs for inspection platforms for Boiler and Oil Storage Rooms for STV, Inc.
9.Reviewed and recommended to the EPA of NYC to use fail-safe(open) louvers in front of there Emergency Generators during power failures.
10.Led Design Team at Dattner Architects in space planning to install traction power, ducts for pressurized fire exit corridors, conduits hung and buried with manholes for electrical power and communication from Subway Station to above grade support buildings.
11.Directed quality control reviews with consultants, management and vendors.
12.Designed fire exit stairs, elevator shafts, communication rooms, balconies, terraces, roofing details, compactor rooms and electrical conduit locations.
13. Did Project Meeting minutes & reviewed field reports. I wrote scope reports.