SANG W. KIM (MICHAEL)
Any Position: Civil/Infrastructure Engineer
P +1-805-***-**** E
kstech77
@gmail.com
A
Lompoc. CA 93436
B Nov. 6, 1953
PROFILE
EDUCATION
Experienced project leader with expertise in engineering management, procurement, and team leadership across multiple sections. Proficient in water/wastewater systems, project design, and execution. Demonstrate strong analytical skills and a commitment to quality and efficiency. Kown for fostering team collaboration and achieving project goals within budget and time constraints. Eager to leverage extensive background in engineering and project management to drive success in future endeavors. Currently based in Lompoc (Vandenberg Village). I am committed to delivering exceptional results in my field.
-M.S. in Civil Engineering
California State University
Los Angeles, California-03/1986
-B.Sc. om Civil Engineering
Han Yang University,
Seoul,,Korea-01/1979
REGISTRATION
-Professional Engineer(PE) in Civil
Engr., C 38346, CA., USA, 1984
-Environmental Assessor(REA),
CA-EPA, USA, 1990
-PE in Water Supply and
Sewerage, Korea, 1992
KEY SKILLS
TEAM LEADERSHIP
TECHNICAL PROPOSL, PROJECT
PLANNING,,AND PROCUREMENT
STRATEGIES
PROJECT MANAGEMENT
CONSTRUCTION SUPERVISION
AND MANAGEMENT
ENGINEERING DESIGN AND
BUILD
WATER, WASTEWATER, AND
DRAINGAE SYSTEM
QUALITY ASSURENCE
STAKE HOLDER ENGAGEMENT
PROCESS IMPROVEMENT
ANALYTIVAL SKILLS
EXPERIENCE
Feb. 2021-Dec. 2024
Royal Hasikoning DHV International, Netherland
Project Team Leader/CM Manager of ODA projects
Maech, 2012-Jan, 2021
Exp International Services Inc., Quebek, Canada
Project Team Leader/CM Manager-Senior Infrastructure Expert and Procurement Specialist of WB/ADB projects
Sept. 2010-Feb. 2012
HEC engineering Consultants, Seoul, Korea
Executive Vice President/International Project Director 2000-2009
KS Tech Group., Torrance, CA, USA
Engineering Partner-Infrastructure Engineering and Construction Management Services.
1996-1999
Montgomery Watson, USA and Hong Kong
Principal Engineer in Infrastructure Engineering Project 1992-1995
-JM Montgomery Consulting Engineers, Desigen Engineer 1986-1991
KST Consulting Engineers, Torrance. CA, USA
Project Engineer/Principal Engineer
1981-1985
Lee and Ro Consulting Engineers, Design Engineer
1979-1981- Korea Engineering Consultants Co., Seoul, Korea SUMMARY OF DETAILED ASSIGNED IN CONSULTANT’S TEAM
RH DHV
International
Netherland
Name of project: Consulting Services for Deasign Review, Construction Management/Supervision, Procurement Support and Contract Management – MCDP in Vietnam – Additional Financing – Dong Hoi subproject: WB fund Year: 2022- Dec.2024 (Completed)
Location: Dong Hoi, Quang Binh Province, Vietnam
Client: Dong Hoi City, PMU
Project Team Leader; Chief Resident Engineer, Infrastructure Expert, CS and Procurement Specialist
Main project features: Project includes:
Drainage, sewer and tertiary pipes, Embanking and dredging downstream of Cau Rao river, improving drainage capacity of Cong Muoi bridge, Improvement of Water front such as seawalls and revetments, and Duc Ninh Wastewater Treatment Plant upgrading. Preparing detail design and bidding documents for remaining items, Road from Le Ky bridge to city bypass road; Construction supervision of Tay bridge, Urban connectivity improvement, and road from Le Ky bridge to city bypass road, EXP International,
Quebec, Canada
Name of project: Consulting Services for Construction Supervision, Procurement Support and Construct Management – MCDP in Vietnam – Additional Financing – Phu Ly subproject: WB funded project
Year: 2020-2021 (final stage)
Location: Phu Ly, Ha Nam Province, Vietnam
Client: Phu Ly City, PMU
Main project features: Project includes:: Design Review, Project Management and Supervision: Particularly for river/canal embankment and dredging work, canal bottom elevations have been measured in an independent and licensed surveying company to form a basis for dredged volume calculation On-going records of Work done to be maintained and updated constantly. The records will form the basis for both interim payments and for verification of the actual final quantities of work, Quantity Surveyors on the CMC, PM will be responsible to perform and record these measurements.-Review the contractor’s construction methodology Name of project: Design/Construction Management and Supervision for Tay Ninh. Project: Greater Mekong Sub-region (GMS) Corridor Towns Development Project - ADB fund. .
Year: 2016-2019
Location: Moc Bai Town, Tay Ninh Province, Vietnam Client: Tay Ninh GMS PMU
Main project features: Project includes:
1. Moc Bai Water Supply, WTP, 2. Moc Bay WWTP, 3. Moc Bay Urban Road, 4.Moc Bay Material Recovery Facility (MBF)
Main project features: Project includes: Design Review, Construction Supervision and Management, Preparation of Operation Manual: Check and verify Contractors’ periodic measurements of completed work and maintain and update such records based on the approved design. Conduct survey to determine actual quantities of work where necessary and to be accomplished by the Contractors. Name of the Project: Improvement and Expansion Water Supply System in Da Lat City – WB Fund Year: 08/2012-04/2013 (6 months completed)
Location: Da Lat city, Lam Dong Province, Vietnam
Client: LAWACO PMU
Main project features: The project is to ensure the 100% of urban population has access to water supply services of 100-120 lpcd at the target year of 2015. Project consist of Pipe network level I: D400- 800 DIP-L=35,000m, pipe network level II: D150-300mm, HDPE-L=16,000m and booster pumping stations with 7-service reservoirs. 12,000 household connections, operation building, SCADA management system and water meter to control NRW, and 13,500 household connections Positions held: Project Team Leader
Activities performed:
Overall general and financial management of the project; liaison with Client, other organizations in the province and World Bank; responsible for ensuring that all reports and other outputs are delivered to the Client according to the agreed time schedule.
Sets up the design organization and manages the whole team. Deals with Client, local authorities, and communities. Sets up QA and QC procedures for to ensure the quality of preparation work.
Overall direction of the design, cost estimates, bidding document, reports and other output. Name of the Project: My Phuoc Urban Industry Water Supply Sub-Project – WB Fund Year: 03/2012-01/2013 (11 months completed)
Location: My Phuoc 3 Urban Industrial Zone, Binh Duong Province, Vietnam Client: BIWASE
Main project features: Improving the water supply capacity, its quality and reliability of the water system in My Phuoc 3, Urban industry zone and meeting the demand on clean water until year 2020. The project is included –intake work and raw water pumping system near at the Dong Nai river – raw water conveying pipe line, D=1,000mm-L=4,493 m; new WTP, Q=30,000m3/day, transmission lines, D=800 mm-L=7,000m, D=600 mm-L=13,900m, D=400mm-L=7,900m and 3 service reservoirs, 13,500 household connections.
Positions held: Project Team Leader
Activities performed:
Overall general and financial management of the project; liaison with Client, other organizations in the province and World Bank; responsible for ensuring that all reports and other outputs are delivered to the Client according to the agreed time schedule.
Sets up the design organization and manages the whole team. Deals with Client, local authorities, and communities. Sets up QA and QC procedures for to ensure the quality of preparation work.
Overall direction of the design, cost estimates, bidding document, reports and other output. Name of the Project: Ben Luc Water Supply Project - Kobleco, PPP Fund of JICA ODA Year: 09/2011-01/2012(4 months)
Location: Long An Province, Vietnam
Client: Kobelco, Japan
Main project features: The objective of this project is to provide matching both the domestic/residential water demand and industrial water consumption at PAT industrial complex in the Long An Province. This project involves two raw water intake pumping stations at Vam Co River and at raw water reservoir, 1200 mm raw water conveying, 50,000 m3/day water treatment plant, and treated water transmission line.
Positions held: Sr. Water Treatment and Procurement Specialist Activities performed: Basic design with solution method for de-saline raw water at the Vam Co river, detailed design, cost estimates, preparation bid documents and procurement support Name of the Project: Hoa Khanh Tay Water Supply Project – ODA EDCF Fund Year: 09/2010-02/2012(16 months)
Location: Long An Province, Vietnam
Client: PMV and PPC of Long An Province.
Main project features: The main objective of this project is to improve and conserve the natural and aquatic environment of the domestic and industrial complex in the Province, which in turn is expected to contribute to uplifting the living standards of the local residents as well as to increase the investment potential of the project area. This project involves the irrigation canal and raw water conveying canal, Q=40,000m3/day Water Treatment Plant, and over 40 km main water distribution pipeline included street improvements.
Positions held: Project Manager
Activities performed: Basic design, detailed design, cost estimates, procurement plan and bidding documents, bid evaluation, and assist construction supervision Name of assignment or project: Rehabilitation of Water Distribution Pipelines Year: 2006-2007 (8 months)
Location: Long Beach, CA, USA
Client: Long Beach Water Department
Main project features: Rehabilitation of main water distribution lines at 4-central districts and the project included the replacement of valves; 36”(900mm) to 72”(1,800mm) valves and multi- 48”(1,000mm) distribution lines. The object of project was to provide sufficient water to the new development area
Positions held: Principal Engineer
Activities performed:
Supervise and lead the construction supervision team
Preparation of construction supervision procedure and manual Tender assistance and procurement support
Name of the Project: Improvement Water Supply and Sewerage System in Retreat Golf and Resorts in Corona and San Diego, CA
Year: 2003-2005
Location: Corona and San Diego, CA, USA
Client: Retreat Golf Resort, LLC and the County of San Diego, CA Main project features:
Main water distribution, sewerage, and drainage system design for 1,980 residential area included in Resort Hotel and 36-holes-Retreat Golf Courses
Rehabilitation of portable and gray water distribution system included 24” (600 mm): main water transmission line with 2-booster pump stations, 2- service reservoir tanks, and washed wastewater treatment system.
Positions held: Project Manager/Infrastructure Specialist Activities performed: Review existing system, Detailed Design and Cost Estimates Other Projects:
- Won-Ju Water Treatment Plant-Q=200,000m3/day (Montgomery Watson+ HEC))
- Rehabilitation of South Water Reclamation Facility and Aeration System Improvement Project
(Montgomery Watson)
- Renovation of Irvine Ranch Water Treatment Plant, CA (JM+L&R)
- Rehabilitation of Primary Sedimentation Basins D&E and F&G, OCSD, CA (L&R)
- Renovation Grit Chamber and Lift Station, OCSD, CA (L&R)
- Oliven force main project, San Diego, CA(L&R)
- George air force and March air force airport rehabilitation project (L&R)
- Numerous Military Infrastructure and Public Works Projects (L&R)
- Numerous industrial wastewater treatment and water purification system for fabric D&F factories and food processing factories (KST)
Location: CA, USA
Client: Government agencies and Private parties
Positions held: Project/Design Engineer
Activities performed: Project site investigation, planning and preparation of detailed design, cost estimates and bidding document.
Certification: I, the undersigned, certify that to the best of my knowledge and belief, this CV correctly describes myself, my qualifications, and my experience, and I am available, as and when necessary, to undertake the assignment in case of an award. I understand that any misstatement or misrepresentation described herein may lead to my disqualification or dismissal by the Client, and/or sanctions by the Bank. Sang W. Kim (Michael)
Date: 07/02//2026