BAKLI ISLAM
CONTACT
*********@*****.***
Cidex 11 BP 67 street of ARBII
BEN MHIDI Ghardaïa state Alge
ria
SKILLS
English writing and speaking skill
Computer skills (Excel,word,
PowerPoint,fortron
programmation, Windows,
internet)
Certification of First aid training,
Algerian Red Crescent, (2011)
Valid Driving licence category B
REFERENCE
Salah Abimhamed -
"Schlumberger"
Procurement & Sourcing Manager
at Schlumberger
********@*******.***
Abdallah Bouhoun - "NDSC
company"
Drilling Superintendant at
NDSC,Oman
Abdallah *******@*****.***
Ahmed Zain - "ABRAJ energy
services S.O.A.C"
HR consultant
*****.****@*********.***
Janvier
2013 - Till
Present
EXPERIENCE
SONATRACH
Completion supervisor
From April 2014 till present
I am a graduate Master degree in Drilling
engineering with significant completion
supervisor experience (eight years). I have been
involved in all aspects of well completion and
operation including wellhead and well
intervention operations dealing with Installation
and repair wellhead and BOP, and testing
pressure its (Cameron and FMC 5000PSI and
10000PSI). I have significant amount of
onshore supervision experience, working with
operators, service companies,(Halliburtoun,
Waterford,Baker, Gairo Data,Expro, Well Tech )
Experienced in lots of operations, such as
Fishing, Milling,completion and DST
operations, high temperature and high
pressure, oil, gas land jobs, setting
packers(hydraulical,Mecanichal and electrical
types) and testing its, killing well with mud fluid and setting PBP(Permanent Bridge Plug),
RBP(retrievaible Bridge Plug), BPV(Back
Pressure Valve) and TWO WAY CHECK VALVES
,
PROJECTS
Installation completion tubing with hydraulic Packer After testing pressure of production tubing 4 1/2" and testing pressure of anulus 4 1/2" and7" .
The test was OK
Installation of completion tubing with electric Packer After testing the production tubing of 4 1/2"
And the Anulus of 4 1/2" and 7".
The test was OK.
Seting whipstock tool on the top of cement plug After it's orientation The whipstock milling tool starting milling bottom of production casing till formalize water Mellon window.
Installation tieback of 7"
1-Starting redresing on the top of liner hunger using special redresing tool(OTIS or BROWN). After this operation will ciculate the mud fluid for one cycle.
2-Installation the tieback for conecting the top of liner hunger to the surface.
3-After seting tieback on the top of liner hunger and making cement between tieback of 7" and casing of 9" 5/8
4-Testing pressure in the Anulus of 7" and 9" 5/8. The test was OK.
Juin 2015
Jun 2011
2020
May-Jun
2012
2013
2012
2012
Setting permanant Bridge Plug on the top of cement plug. The operation of setting permanant Bridge Plug was for purpose to isolate the lower reservoir from the upper.
After this operation will perforate the casing of upper reservoir using wire line unit with special gun tool.
EDUCATION
University of Hydrocarbon KASDI MARBAH
Ouargla state Algeria
Master degree in drilling engineer
75%
Hydrocarbon university of KASDI MARBAH
Bachelor Degree
70%
Red Med centre
Certification of IWCF (Supervisor level )
75%
ENTP Drilling Company
Training certification about Mud Logging during
one month with Drilling company, (May-Jun
2012).
60%
Pro-Info Centre (Algiers state)
English language Certification (Advanced level)
Pro-info Cent
75%
VCS Centre (Ghardaïa state)
Certification in computer skills (IT, office tools, access, windows, Internet)
80%
Algerian Red Crecsent
Certification of First aid training,
75%