Post Job Free
Sign in

Telecommunications

Location:
Selinsgrove, PA, 17870
Posted:
June 18, 2026

Contact this candidate

Resume:

Christopher Peters

** ***** ******* ***********, ** 17870 281-***-**** chris.peters2255@sbcglobal. net

Operations and services leader who improved quality, productivity and performance while cutting costs for telecom, technologies and consulting organizations. Improved efficiencies and created processes and procedures to ensure requirements and client expectations. Expert in strategic planning, and continuous improvements.

Key Skills: Turning around under-performing units. Analyzing situations rapidly. Building and motivating successful teams. Finding new alternatives. Meeting demanding objectives. Relating easily to people at all levels. Simplifying complex problems. Improving work environments and building employee relations.

Career History

Services Quality Engineer, Emerson Network Power/ Vertiv. 2017-2026. Audit DC power projects and transport projects in the NE to assure workmanship requirements are met per customer standards, and detailed engineering specifications. Extensive knowledge of Verizon IP72202 standards and AT&T TP76300. Travel to customer Data Center sites, to inspect thermal equipment and document and report factory defects found in the field. Investigate and report on quality issues identified by the field technician’s, concerning operation of the equipment.

Installation Supervisor, Emerson Network Power. 2017. Supervise sub -contractors in the installation of DC power Equipment and distribution in Telco switching offices. Review and approve Emerson installers MOP’s and all other duties assigned.

AT&T EJF SME. Emerson Network Power. 2016 to 2017. Support the transport project managers with AT&T projects. Creating job folders, JSA documents for all projects. Review and verify accuracy of installation completion documents from the field. Upload all documents to the EJF folders.

Installation Supervisor, Emerson Network Power, 2013 to 2016. Supervise sub- contractors in the installation of DC power Equipment and distribution in Telco switching offices. Review and approve Emerson installers MOP’s and all other duties assigned.

Installer, R&B Networks INC., 2013 to 2013. GSMoE Migration project for AT&T. Migrating T-1 circuits to Ethernet based Cisco router from Fiber Tower Blocks in AT&T cell site huts in Dallas Ft. Worth and Houston and Waco. Also Installation of Alcatel Lucent equipment for Tel Mex, and Wise Connect Wireless.

Document Specialist, Gibson & Associates, 2011 to 2012. Contracted to client Emerson Network Power to support the mid-west region Installation Manager and teams. Compiled, reviewed and uploaded project documents to the AT&T Electronic Job folder system. Wrote Detailed Methods of Procedure, tracked with customer AT&T for approval of the MOP, uploaded the document to the AT&T AOTS system and scheduled the work time frames. Communicated with the AT&T customers on a daily basis, as well as Emerson Management. Perform engineering site surveys in AT&T facilities to document site conditions, and layout project requirements.

Field Engineer / Installation Supv., Gibson & Associates, 2007 to 2011 Contracted to client, Emerson Network Power, to perform pre-Engineering and bid proposal site surveys. Conduct customer site visits for the installation of DC Power Equipment and cable, data and transport equipment. Write and maintain job documentation for all projects in the region, to include method’s of procedures, test records ect.

Area Installation Manager, Tyco Electronics, 2003 to 2007. Managed multiple installation teams. Created and maintained relationships with diverse customer base. Controlled and managed costs per project with multiple projects running at the same time. Managed all aspects of DC power deployment, re-arrangement and replacement, in the Central Office, MTSO, and Cell site environments for AT&T, Verizon, Verizon Wireless, and Sprint. Conducted site surveys, including new equipment layouts and estimated labor requirements for each project. Managed 10 employees and up to $2.5M budgets.

Project Team Manager, Marconi Communications, 1998 to 2003. Oversaw customer requirements and managed multiple installation teams. Forecasted labor needs and billable revenues on a monthly basis. Controlled and managed costs per project with multiple projects running at the same time. Managed all aspects of DC power deployment, re-arrangement and replacement, in the Central Office, MTSO, and Cell site environments for AT&T, Verizon, Verizon Wireless, and Sprint.. Conducted site surveys, including new equipment layouts and estimated labor requirements for each project.

Site Supervisor, Reltec, 1990 to 1998. Directed contract labor in installation of telecommunications DC power equipment and batteries on customer's premises, to include the Central Office, MTSO, and Cell Site environments. Installed Emergency generators to include transfer switches, control and alarm wiring, and fuel tanks and distribution. Responsible for compliance with all customer standards, documentation, and maintaining network reliability during all phases of projects. Managed 10 staff and up to $1.5M budget.

Other Positions: Lead Installer, J-TEC Communications. Installer, Contel Federal Systems. Installler, Western Electric



Contact this candidate