ADARSH SUDARSANAN
E-Mail: *.**********@**************.*** Contact No: +974********
SNAPSHOT
A result-oriented professional with 15 years of experience, including 3.7 years in electrical installation, commissioning, testing, maintenance, and project management of power plants. I have 4.7 years of facility maintenance experience at Hamad International Airport, Doha, with Malaysia Airports Consultancy Services Middle East LLC, and 2 years at Hamad Medical Corporation under Qatar Site and Power W.L.L. Additionally, I have 3 years of facility maintenance experience at Hamad Medical Corporation with Elegancia Facilities Management. Currently, I serve as a Facilities Management Engineer with Elegancia Facilities Management at the prestigious Military Medical City Hospital (MMCH) Project. SKILLS
I possess strong expertise in the operation, maintenance, and optimization of buildings and their systems, with hands-on experience in managing MEP services efficiently. I am proficient in using Salesforce and Oracle, CMMS for maintenance planning, tracking, and reporting. My skill set includes interpreting engineering drawings and O&M manuals to support accurate maintenance and system upgrades. I have extensive experience in electrical testing, commissioning, troubleshooting, Erection, and maintenance, along with a solid background in executing power plant projects. This combination of technical knowledge and practical experience allows me to ensure reliable system performance, regulatory compliance, and effective project execution.
EMPLOYMENT RECITAL
Facilities Management Engineer March 2025 - Present Organization : Elegancia Facilities Management
Project : Facility Maintenance project (MEP) - Military Medical City Hospital (MMCH) Project. Role : Responsible for the operation, maintenance, and reliability of all electrical systems within the hospital facility, ensuring uninterrupted power supply to critical and non-critical areas in compliance with healthcare standards. Performed regular inspections and ensured efficient functioning of electrical infrastructure including LV systems, Transformers, switchgear, UPS systems, CBS System, IPS System, Generators, and lighting control systems through planned preventive and corrective maintenance programs.
Managed manpower and coordinated with teams for daily maintenance activities, shutdowns, and emergency breakdowns. Reviewed daily activity reports and ensured timely resolution of complaints related to electrical systems. Maintained accurate electrical documentation including load schedules, single line diagrams, and asset registers. Conducted load analysis, ensured proper load distribution, and implemented energy-saving initiatives without compromising system reliability. Ensured compliance with hospital safety standards, electrical regulations, and infection control requirements. Performed risk assessments, ensured proper grounding, and validated system safety through regular testing.
2 P a g e
Handled KPI monitoring, contractor performance evaluation, and contract document reviews. Verified assets, maintained maintenance logs, and ensured all works met contractual and regulatory requirements.
Supported budgeting for electrical upgrades and maintenance, identified cost optimization opportunities, and ensured efficient utilization of resources while maintaining high standards of safety and operational excellence.
Facilities Management Engineer Dec 2024 – March 2025 Organization : Elegancia Facilities Management
Project : Facility Maintenance project (MEP) - Msheireb Downtown Doha Project. Role : Involving a range of responsibilities related to the operation, maintenance, and optimization of buildings and their systems. I was responsible for inspecting and ensuring all building services functioned properly through the implementation of planned preventive and corrective maintenance, supported by daily activity report reviews. I managed project manpower and task allocation across departments and addressed tenant concerns promptly while aligning systems with their needs. I maintained accurate MEP documentation, managed budgets for system upgrades and maintenance, and identified cost-saving measures without compromising quality. Ensuring compliance with safety regulations and building codes, I handled KPI validation, contract document reviews, and asset verification. I oversaw maintenance record-keeping, system administration, and ensured contractual requirements were met by effectively managing resources and minimizing waste, all while adhering to safety standards in facilities management. Facilities Management Engineer Oct 2021 – Dec 2024 Organization : Elegancia Facilities Management
Project : Facility Maintenance project (MEP)- Hamad Medical Corporation Role : Involving a range of responsibilities related to the operation, maintenance, and optimization of buildings and their systems. I led and monitored a maintenance team to execute scheduled programs efficiently, coordinated with clients for planning and updates, and developed preventive maintenance strategies to ensure the reliability of MEP systems. I scheduled inspections, collaborated with stakeholders, and provided staff training and support. Addressing tenant concerns, maintaining accurate documentation, generating performance and budget reports, and managing MEP project budgets were key responsibilities. I ensured regulatory compliance, responded to emergencies promptly, implemented contingency plans, verified as-built drawings, and prepared weekly, monthly, and annual reports, including KPIs and records for JCI inspections, while identifying cost- saving opportunities without compromising system quality. 3 P a g e
Site In charge Nov 2019 – Oct 2021
Organization : Qatar Site and Power W.L.L
Project : Maintenance project - Hamad Medical Corporation – Al Khor Hospital, Qatar. Role : Planning and scheduling of maintenance work like, Handling All Utilities Operation & Maintenance of Electrical system, i.e., Generator Set 1650 KVA, 500 KVA, 22KVA, MDBs
(440V), SMDBs (220V), SDBs, and DB’s, Testing of LV switch gear, electrical panels, ATS, Battery Chargers and generator set. Preparing weekly reports and monthly KPI reports. Preparing reports and records for annual JCI inspection. Technical officer Feb 2015 - Oct 2019
Organization : Malaysia Airports Consultancy Services Middle East LLC Project : Maintenance project - Hamad International Airport, Doha, Qatar Role : Planning and scheduling of maintenance work like, Preventive maintenance/ Annual Testing of LV switch gear, electrical panels, UPS system, generator set, MDBs (440V), SMDBs (220V), SDBs, DBs and Capacitor panels, AHUs, CRAC Units, and all split units, Building Management system (BMS). Handling Operation & Maintenance of Kitchen equipment’s. PAT testing for kitchen appliances and power chords. Handling the operation. Planning and scheduling of maintenance work (Preventive Maintenance) and CMMS (Computerized maintenance management system - Maximo & Oracle)
Maintenance Supervisor Oct 2014 - Jan 2015
Organization : Bharath Petroleum Corporation Limited, Kochi Project : Maintenance project BPCL
Role : I am responsible for the planning and scheduling of preventive and corrective maintenance activities, with hands-on experience in end-to-end maintenance processes, including coordination with end users. I oversee the operation and maintenance of HVAC systems, including Air Handling Units (AHUs), Computer Room Air Conditioning (CRAC) units, and various types of split units, ensuring optimal performance, energy efficiency, and minimal downtime through proactive maintenance strategies and effective scheduling. Electrical Testing & Commissioning Engineer May 2011 - Aug 2014 Organization : LEKHA Enterprises, Pune
Projects : 1x350 MW GSEG CCPP Surat, Gujarat. (BHEL Project)
: 2 X 500 MW Karnataka Power corporation Ltd (BHEL Projects)
: 2x270 MW IEPL TPS Bella, Nagpur. (BHEL Project)
: 2x325 MW DIL (Dhariwal Infrastructure Limited), Tadali, Chandrapur. Role : I was responsible for the erection, testing, commissioning, and maintenance of electrical and electronic equipment, ensuring all systems were installed and operated according to technical specifications and safety standards. My responsibilities extended through to the final handover, involving thorough inspections, performance testing, and coordination with stakeholders to ensure seamless project completion and reliable system functionality. 4 P a g e
COURSE ATTENDED
Attended a three-day safety class at BPCL, cochin (Safety No:PS-1756-09-14)
Electrical AP HTM 06-02 Course
Water Safety CP S02 Course
Basic Life Support with AED (BLS/AED) Training
Fire Safety Orientation Training
Infection Prevention and Control Education
Environmental Safety Training
Lockout Tag out (LOTO) Safety awareness Course
Authorized Gas tester Certification
PAT Testing Operational Training
SCHOLASTICS
2011 - Bachelor of Engineering in Electrical Engineering from SCAD College of Engineering
&Technology, Anna University, Tamilnadu (Course Complete)
2007 - Diploma in Electrical & Electronics Engineering from SCAD Polytechnic College, Tirunelveli with 83%
2004 - 12thfrom St. Thomas HSS, Punalur, State Board with 60%
2002 - 10th from St.Goretti HSS, Punalur, State Board with58% IT FORTE
Well versed with Operating System: MS Window/ Office and Internet Applications.
Computerized maintenance management system – Maximo, Oracle & Sales Force
SAP Successful Factors
PERSONAL DOSSIER
Date of Birth: 11th January 1987
Permanent Address: Rohini, Vattamon, Mathara (PO), Punalur, Kollam Dist. Kerala. Language known: Hindi, English, Malayalam and Tamil ADARSH SUDARSANAN