Resume:

Murugesan Madasamy

Versatile, high-energy professional targeting assignments in Project Management on MEP services; scaling new heights of success with hard work & dedication and leaving a mark of excellence on each step

***********@*****.*** +91-704******* / 875-***-****

Profile Summary:

Offering over 27 years of extensive experience in Electrical (HV, LV), ELV, BMS, HVAC and MEP Services & Project Engineering Operations, installation, Testing & Commissioning & Maintenance of various high-rise buildings & metro projects Proficient in MEP design methods, review closeout documentation like O&M, training, conducting test, quality analysis & preventive maintenance; skilled in managing erection, testing & commissioning operations Excellence in monitoring quality systems & compliance with preset standards, troubleshooting the problems & maintaining requisite documents to ensure complete in-process quality & improvement capabilities Resourceful in creating & interpreting engineering drawings as per defined technical specifications regulating multi - discipline contracts involving electrical-mechanical work & ensuring proper coordination of design services & specifications. Proven capabilities in regulating project activities from conceptualization to execution, including technical specifications, stage inspections, progress monitoring, site management, and manpower planning Enterprising leader with excellent relationship management, analytical and negotiation skills, with capabilities in swiftly ramping up projects in coordination with clients, vendors, and consultants Merit of managing various MEP projects, such as:

o Metro Rail Projects (Dubai Metro -Red Line & Green Line Station and Depots, Qatar Metro – Car Park, Indore Metro –Elevated Stations and Viaducts) – 13+years o Airport, Hospitals, and Sports Complex Projects

o Petro Chemical, Wind Mill, and Substation Projects o Industrials Projects (Anchor Electric Pvt. Ltd by Panasonic, Komatsu, and Unicharm) o Commercial, Residential, and Fit-out Projects

o Hotel and High-Rise Buildings Project

Equipment Handled:

Project management and maintenance of the following machinery& estimating, designing, procuring, variation, and budget cost claiming, Shop Drawings, and Materials submission reviews on: o Electrical System, Fire Alarm System, Central Battery System, Lighting Control System, Lightning Protection and Earthlings System, FM 200 System, Pre-action Control System, Installation of SMATV, CCTV, Door Access control and Security Systems, Building Management Systems (BMS), HVAC System, Chillers, AHUs, cooling towers, Air compressor, WTP, ROS, STP, FF, Irrigation & Drainage Systems. Key Impact Areas:

QA, QC Managements Tender & Procurement Operations QS Management Project Management MEP, ELV, and BMS Test

& Commissioning

Facility Management & Maintenance

Manpower & Materials Management Cross-functional Coordination Design Coordination Career Timeline:

`Jun’ 00- Jun 06 with

Al Samara Contracting

Company, KSA as Senior

Electrical Engineer

Jan’ 13 - Aug’ 18 with Kajima

India Pvt Ltd, India as MEP

Project Manager

Jan 22 – Till date with URC

Construction Company (P)

Ltd as Ass. General

Manager - MEP.

Education:

Jun’ 06-Dec ' 12 with Al

Futtaim Group LLC, UAE as

Construction Manager - MEP

Aug’18 – April 21 with

Sterling and Wilson WLL,

Qatar, as Project Manager

- Electrical

1. BE (Electrical and Electronics Engineering) from GCE – MK University, 2 .Associate Member in the Institute of Engineering (India) Current Work Experience:

URC Construction Pvt Ltd. (India)

Title: Metro Project Package – 02, 03 & 04 (MPMRCL – Indore) Roll: AGM – Electrical (As project roll- MEP System manager, System Interface Manager, Stockholder Manager, Electrical Safety in charge, P&M coordinator and MEP Establishment administration, Utility Diversion-OH & UG Services)

Duration: Since Jan 22 (4.3y)

Key Result Areas:

1. Steering material & manpower planning, procurement, indenting, and inventory management of tools & testing instruments for ensuring timely completion of the project & building services as per specifications 2. Designing, testing, and commissioning strategies as per the project functional requirement; working in close coordination with the consultant, client, vendors & specialist services subcontractors for smooth execution of various projects 3. Utility diversion/shifting and obtaining the owning agency's coordination for approval and handover.

4. Conducting inspections & adhering to health & safety standards during the Project Execution 5. Developing project baselines; monitoring and controlling projects with respect to cost, time overruns, and quality compliance to ensure satisfactory execution of projects 6. Collaborating with the purchase department/ Vendors for the requirements of material & delivery Cost estimation, tender preparation, drafting submission, obtaining approval on materials proposal, drawings & so on

(RFI/IRs)

Interfacing with the Concern team for timely submission of MARs and shop drawings & checking Approvals Coordination with FM for final accounts preparation & QS for raising an invoice for work done, and details of materials availability at the site

Developing effective working relationships with the clients through regular meetings, counseling & providing recommendations on designing projects and for system upgrade Involved procurement management on Electrical service materials with reference to approved MAR and project cost. Maintain necessary records and documentation on the complete project, what was done, and how to develop at future. Jun’06- Nov’12 with Al Futtaim Engineering LLC. - UAE Growth Path:

Jul’06-May’07 as Senior MEP Engineer

Jun’07- Dec’12 as MEP – Construction Manager

As Senior MEP- Engineer

Supervised the entire gamut of testing & commissioning activities in the project, right from analyzing tender drawings, creating cost estimations, budget/subcontractor & material management, submission of materials and shop drawings for approval in line with the company’s vision

Liaised & coordinated with Quantity Surveyor for Variation, Site Supervisors/ Engineers, Client, Consultant, Management & Safety Officer for HSE operations, quality assurance & control related activities, thereby ensuring smooth site activities. Monitored project progress closely & prepared weekly site progress report, forecast for the completion of the project Within the stipulated time

Managed installation of HV, LV, ELV, BMS, Aircraft Warning Lights, HVAC, AHUs, WTP, STP, FFS, and Utility Services. Participated in weekly meetings with consultants and the client to assess modifications and site progress As MEP – Construction Manager

o Involved planning the entire project and documenting all jobs that must be completed o Expenses of each project are efficiently managed throughout the process to ensure adjustments for unexpected issues or difficulties

o Ensured that the contractors employed for the project are completing the project to high quality standard o Monitored construction process, contract provisions, and ensured that all parties involved were satisfied o Ensured that correct systems are in place to maintain no accidents and that the works meet all the legal requirements and building regulations.

o Completed projects within the stipulated time with minimal cost o Responsibility had to arrange agencies, subcontractors’ local agency, and report to management o Provided guidelines to the construction team for timely, safe, and quality construction o Selected tools, materials, equipment, and track inventory o Reviewed work progress daily and coordinated with the consultant and client in weekly progress meetings o Prepared internal and external reports about job status o Negotiation on terms of agreements, draft contracts, and obtained permits and licenses o Planned to prevent problems and resolve any emerging ones o Performed oversight and direct construction projects from conception to completion Highlights:

Implemented several measures to identify deformities, other abnormalities on LV, ELV, BMS, FFS, AHUs, HVAC, ROS, STP, WTP, Utility service parts/components/products

Ensured the successful completion of the prestigious projects within the approved budget by continuous monitoring of budget movement and optimized utilization, as Project Lead Initiated successful development and implementation of QP mechanism as well as the cost reduction on MEP activities related to project operation systems, along with design selection & quality control activities Implemented proper HSE policy and preventive measures, such as safety patrol and Daily Tool Box Talks, to successful completion

Successfully conducted troubleshooting exercises for smooth operation, which helped achieve productivity achievements Previous Experience:

Aug’18-April ’21 with Sterling & Wilson Middle East, Qatar – Project Manager – MEP Metro Car Park Project (1B+G+2) – 3 years

Jan’13-Aug’18 with Kajima India Pvt. Ltd. (PMC), India – Project Manager – MEP Jul’06-Dec’12 with Al Futtaim Engineering LLC, UAE – Construction Manager – MEP Metro Projects (Red & Green Lines stations and Depots, Car park) – 6.5Years Jun’00-Jun’06 with Al Samara Contracting Company, KSA – Senior Engineer - MEP July’97-May’00 with Southern Petro Chemical Industry Limited, India – Maintenance Engineer, Aug’91-Aug ’97 with Justin & Company, India - Electrical Engineer – Site & Liaison Engineer IT Skills:

Tools: Microsoft Office (Word/Excel/PowerPoint)

Technical: AutoCAD

Training Certificates:

DNV’s Training Program – Construction Safety Course

March 2013

UAE

Certificate of Professional Development Program – Beyond Constitutional Requirements in Electrical Safety

September 2015

India

Integrated Management System (IMS) - ISO 9001:2015; ISO 14001:2015; ISO 45001:2018 Standards

March 2019

Qatar

Major Projects:

Sterling & Wilson Middle East WLL - Qatar

Title: Shield 5 (Army Project), Metro Car Park Projects Role: Project Manager - MEP

Duration: 2018- 2021

Kajima India Pvt. Ltd. (PMC) - India

Title: Anchor Electrical by Panasonic Factory project, Unicharm project, Komatsu project, and SMBC Projects Role: Project Manager – MEP

Duration: 2013-2018

Al Futtaim Engineering & Real Estate LLC - Dubai (UAE) Title: Dubai Metro Rail Projects (Red Line & Green Line Station and Depots) & High-Rise Buildings (Hilton Hotel and KIP Development)

Role: Construction Manager - MEP

Duration: 2006-2012

Al Samara Contracting Company- Riyadh (KSA)

Title: Building Constructions - Airport, Hospital, and Sports Complex Projects Role: Senior Engineer - MEP

Duration: 2000 to 2006

Star Electricals contacting company - India

Title: Southern Petrochemical Industry Limited - Ammonia, Urea plants and water & substation plants Role: Maintenance Engineer – Contract

Duration: 1997 to 2000

Justin & Company - India

Title: Wind Mill & Sub Station and Tower work Projects - 250-600KW Wind Generator & 220KV, 132KV, 110KV, 66KV, 33KV, 11KV/430V SS

Role: Electrical Engineer

Duration: 1991 to 1997

Personal Details:

Date of Birth: 21st December 1969

Languages Known: English, Hindi, Tamil, Malayalam, and Arabic.

Marital Status: Married

No. of Dependents: xxx

Passport No. /Expiry: R0990100 / 25th May 2027

Driving License: Yes

Visa & Expiry: xxx

Address: 182 Periyar Nagar, Thenkalam & PO, Tirunelveli - Dist., Tamil Nadu – 627357, India.

Service Details on Metro Projects

Dubai Metro Project

Dubai metro projects consist of two packages, one is green line which starts with Al Qusais and ends at Deirha and another one is red lines starts at Al Rashidiya and ends Jebal Ali. Both have elevated and underground stations as well as depots. Depots have maintenance sheds, CCO buildings, traction substations and extra.

My roles in Dubai metro packages are senior engineer and construction manager — map services, and I have the responsibility as

1. Site installation with approval drawings and materials 2. Coordination with project partners and internal team like procurement, design, quantity survey, quality control and health & safety

3. Participating in a weekly progress review meeting with consultant and client for smooth completion of the project.

4. I have contributed to this project 1.0 years as senior MEP engineer and 5.6 years as construction manager, a total of 6.6 years serviced and completed the project successfully. Qatar Metro Project

In the Qatar Metro project, we have executed a car park (1B+G+2) and my role is as project manager -MEP and the responsibilities are

1. Installation of electrical and mechanical services (Electrical services, fire alarm system, CCTV, BMS, public address system, automated gate barrier system, heat and ventilation system, FF system, public health engineering services and extra.

2. Participating in meetings frequently with consultants and clients for progress review and update as well as monthly invoice submission for smooth cash flow of the project. 3. I have serviced in this project for 2.9 years and successfully completed it and handed it over to the client. Indore Metro Project

Indore metro has two packages, 2A and 3A. Both packages have 16 elevated stations and 19 km viaducts which start from Indore Airport to Malvia Nagar (Radisson square). The project was awarded to M/S.URCC in 2021.

I was appointed as AGM - Electrical in Jan 2022. My roles and responsibilities in the projects are 1. MEP System Manager

2. System Interface Manager

3. Stakeholder Manager

MEP System Manager

1. Closely monitor site activity with coordination of vendor, design, QS, QC, Health and safety, procurement team for on-time delivery and achieve the target date. 2. Attend progress review meeting and update the site situation, tracking schedule of target and monthly claim submission and variation discussion if deviates tender scope. System Interface Manager

1. Participate in interface coordination meetings with project partners (KPTL -PST, Alstom -Signaling, PSD and Civil contractors) to share and update the necessary inputs for respective service smooth construction. 2. Coordination with the design team to prepare CSD based on project partner and MEP service requirements to carry out site activities to avoid any reworks and save time. Stakeholder Manager

1. Coordinate with the owning agency (Indore Development Authority, Indore Municipal Corporation, Madhya Pradhes Electric Board and Railway authorities) for approval prior to shifting the infringed services for metro construction activity.

2. Managing Liasoning part with the concerned authority to get proper estimation and approval for utility diversion (Division of Overhead and underground services) 3. Vendor finalization and management for diversion activity and monitor progress at site to ensure the proper clearance for metro construction activities.

Over all service period in Indore metro projects is 4.4 years and still going on Also involved in managing MEP services establishment work, Electrical service safety at site and Plant & Machinery coordination at various projects.



Contact this candidate