Oct **, **** • **** Chris Drive, Oreana, USA, ****4 • *********@*****.*** • +1-918-***-**** •
linkedin.com/in/alex-varga-meder • V625-0005-1299
ALEJANDRO VARGA MEDER
Senior Automation / Construction / Engineering / Project / Manager PROFESSIONAL SUMMARY
Senior Automation / Construction / Engineering / Project / Manager with 40+ years focused on large-scale industrial Oil & Gas (Upstream, Midstream and Downstream), Petrochemicals in particular Sulfur, Material Handling Systems, Food (Beer Processing, Alcohol Distilleries and Beverage Plants) as well as Nuclear. projects, directing design, construction as well as new or updated control-system upgrades across multi- phase programs.
Managed multidisciplinary teams, schedules and multi-million-dollar budgets while coordinating complex shutdowns and vendor integrations. Seeking to lead engineering, construction projects and delivery of high-risk modernization projects to improve reliability and compliance. Recognized for the ability to execute projects with careful attention to detail, schedule, budget and safety, making the utmost effort to comply and surpass client requirements, as well as being a proactive problem solver who manages multi discipline personnel through results, providing autonomy, with direction as needed. Extensive experience in all multi-disciplinary design engineering phases, like FEED, Conceptual, Basic, Detailed Engineering, Procurement, Construction Management, and Commissioning in the US, Argentina, Venezuela, Trinidad and Tobago and Saudi Arabia. EMPLOYMENT HISTORY
PRINCIPAL PROJECT MANAGER 2025 – 2026
CONSTELLATION ENERGY Marseilles, IL, USA
Principal Project Manager for Design engineering and Construction associated with several Nuclear Projects in the LaSalle Generation Station in Marseilles, IL, with special emphasis in the design and construction of the Hydrogen Injection systems and Feedwater Level Control of the Boiling Water Reactor, and structural supports for the main Steam lines.
2025 – 2026, LaSalle Generation Station, EPU Uprate Project. Total Installed Cost (TIC) estimated based on project completion by 2030 for the project is US $ 25,000,000. SENIOR CONSTRUCTION MANAGER 2023 – 2024
PROJECT MANAGEMENT CONSULTANTS St. Charles, IL, USA Project construction Manager in charge of Construction Contractors associated with the General Mills Candy Factory in St. Charles, IL with special emphasis in the installation / construction of Wet and Dry Kitchen areas, as well as the sugar silos, including mechanical, structural modifications, electrical and equipment and controls installation.
2023 – 2024, General Mills, Candy Factory Upgrade and Modernization. Total Installed Cost (TIC) 10,000,000.
SENIOR PROJECT AUTOMATION MANAGER 2021 – 2023
ARCHER DANIELS MIDLAND Decatur, IL, USA
Senior Project Automation Manager in charge of Engineering and Construction projects associated with the ADM Program Aurora Digital Transformation of the Decatur, IL East Plants Soy Processing plants in Decatur, IL Digital Modernization and Transformation associated with the Program Aurora replacement of existing Rockwell PLC (Programable Logic Controllers) control systems with Emerson DeltaV control system, with special emphasis in the design and construction of Emerson DeltaV DCS (Distributed Control System) system replacement of Rockwell D3, PLANTPAX and D5 PLC control systems in existing operating plants, where scheduled shutdowns needed to be coordinated and scheduled 6 or more months ahead of time.
The project is comprised of 8 phases with an estimated TIC of $80+MM, the project worked on the following:
Infrastructure which included the civil, mechanical, structural associated with a new Emerson supplied Remote Instrument Enclosure (RIE) / Data Center Building with new servers, modification of an existing storage area to a new IO room, an electrical pipe bridge to interconnect several plant areas over railroad tracks and the installation of a fiber optic link interconnecting several plant areas and the new IO rooms as well as the Corporate Data Center.
Preparation and Extraction area of Soy Grains with the replacement of over 17 Rockwell sub panels with the new Emerson DeltaV system components. The preliminary work of checking existing wiring, connections, installation of UPS and clean power, grounding and WIFI systems was performed previous to the plant shutdowns. During the shutdown the panels where replaced and then proceeded to perform commissioning and start up by plant Automation personnel as well as Emerson / Experitec personnel.
In the Fluor Mill A, the same was performed with 11 PLC’s changed out, though a big difference was that several shorter shutdowns where coordinated, allowing for an easier process of placing system back into operations
The Isolate 1 plant was in the final stages of de FEL 3 process starting to move to the FEL 3 / 4
(Construction), at the same time the Functional Concentrates plant was in the FEL 2 stage
Development of the following:
Perform Project Management strategies implementing the recently implemented Front End Loading
(FEL) system coordinating all the disciplines necessary as Technical (Civil, Electrical, Instrumentation and Controls, Process, Structural, External Third-Party engineering etc.) and Administrative
(Accounting / Budgeting, Scheduling and tracking of the project schedule, Documentation, Procurement and Logistics, etc.) to develop a quality engineering project, both on time and on budget.
Project Scheduling, both development and execution and tracking (Engineering / Construction / Precommissioning, Commissioning and Start Up)
Perform Fabrication inspection of units and components, where applicable.
Perform Construction Management Support to construction contractors as engineering advisory.
Participate in Precommissioning, Commissioning and Startup of process units.
Participate in Control System migrations from new equipment controlled via original PLC’s to Customer DCS control Systems.
2021 – 2023, ADM East Plant Soy Processing Plants, Modernization and Digital Transformation of Control Systems. Total Installed Cost (TIC) estimated US $ 80,000,000+ SENIOR PROJECT / CONSTRUCTION / AUTOMATION MANAGER AND BUSINESS DEVELOPMENT MANAGER
2016 – 2020
MATRIX PDM ENGINEERING
Tulsa, OK,
USA
Project and Construction Manager as well as Business Development Support for Latin America and EMEA / Saudi Arabia in particular for Engineering and Construction projects with special emphasis in the design and construction of materials handling systems and Sulfur Pelletizing / Prilling Systems, also working as Electrical – Instrumentation and Control Systems Specialist and consultant to several Liquid Sulfur Pelletization / Prilling projects.
Perform Project Management coordinating all the disciplines necessary as Technical (Civil, Electrical, Instrumentation and Controls, Mechanical, Piping, Process, Structural, etc.) and Administrative
(Accounting / Budgeting / Billing – Invoicing, Scheduling and tracking of the project schedule, Documentation, Procurement, QAQC, Shipping and Logistics, etc.) to develop a quality engineering project, on time and on budget. Perform Fabrication inspection of unit components.
Project Scheduling, with Project Controls for both engineering development and execution and tracking
(Engineering / Construction / Precommissioning, Commissioning and Start Up)
Management of Fabrication to ascertain the equipment built to drawings and specs.
Developed Control Narratives, Cause and Effect Diagrams, Logic Schemes, Plant Operation manuals.
Participated in HAZOPS, HAZAN, as needed.
Familiar with Saudi Aramco specifications and standards applied to projects
Development of the Electrical and Instrumentation and Control System of the project.
Verification with logistics company the crating and international shipping logistics.
Involved in discussions with Saudi Aramco CSD to present technical foundations for use of CPVC piping in Saudi Aramco installations.
Perform Control System migrations from new equipment controlled via PLC’s to Customer DCS Control Systems.
Assisted with construction support in Saudi Arabia to the installation contractor to resolve technical issues, modifications.
2016 – 2020, Saudi Aramco Pelletizer / Sulfur Forming Unit 2,000 tpd production Project in Jubail, Saudi Arabia. Total Installed Cost (TIC) approximately US $ 20,000,000
2016 – 2017, Heartland Pelletizer / Sulfur Forming Unit 2,000 tpd production Project in Alberta, Canada. Total Installed Cost (TIC) approximately US $ 15,000,000. SENIOR PROJECT / CONSTRUCTION / AUTOMATION MANAGER AND BUSINESS DEVELOPMENT MANAGER
2011 – 2016
DEVCO / Houston Interests
Tulsa, OK,
USA
Project and Construction Manager as well as Business Development Support for Latin America and EMEA / Saudi Arabia in particular for Engineering and Construction projects with special emphasis in the design and construction of materials handling systems and Sulfur Pelletizing / Prilling Systems, also working as Electrical – Instrumentation and Control Systems Specialist and consultant to several Liquid Sulfur Pelletization / Prilling projects.
Perform Project Management coordinating all the disciplines necessary as Technical (Civil, Electrical, Instrumentation and Controls, Mechanical, Piping, Process, Structural, etc.) and Administrative
(Accounting / Budgeting / Billing – Invoicing, Scheduling and tracking of the project schedule, Documentation, Procurement, QAQC, Shipping and Logistics, etc.) to develop a quality engineering project, on time and on budget. Perform Fabrication inspection of unit components.
Project Scheduling, with Project Controls for both engineering development and execution and tracking
(Engineering / Construction / Precommissioning, Commissioning and Start Up)
Management of Fabrication to ascertain the equipment built to drawings and specs.
Developed Control Narratives, Cause and Effect Diagrams, Logic Schemes, Plant Operation manuals.
Participated in HAZOPS, HAZAN, as needed.
Familiar with Saudi Aramco specifications and standards applied to projects
Development of the Electrical and Instrumentation and Control System of the project.
Verification with logistics company the crating and international shipping logistics.
Perform Control System migrations from new equipment controlled via PLC’s to Customer DCS Control Systems.
Assisted with construction support in Saudi Arabia to the installation contractor to resolve technical issues, modifications.
2016 – 2016, Saudi Aramco Pelletizer / Sulfur Forming Unit 2,000 tpd production Project in Jubail, Saudi Arabia. Total Installed Cost (TIC) approximately US $ 15,000,000.
2012 – 2014, Sulfur Purification Project in Iraq 250,000 t/yr.; in Mosul, Iraq. Total Installed Cost (TIC) approximately US $ 100,000,000.
2011 – 2014, SAMREF Pelletizer / Sulfur Forming Unit 1,000 tpd production Project in Yanbu, Saudi Arabia. Total Installed Cost (TIC) approximately US $ 10,000,000
2011 – 2014, CNPC YOLOTAN Pelletizer / Sulfur Forming Units 2 2,000 tpd production Project in Yolotan, Turkmenistan. Total Installed Cost (TIC) approximately US $ 60,000,000. SENIOR PROJECT / CONSTRUCTION / AUTOMATION MANAGER 2007 – 2011 RIVER CONSULTING Metairie, LA, USA
Construction Manager for Engineering and Construction projects with special emphasis in the design and construction of materials handling systems. Project / Construction Management both in office and site.
Perform Engineering and Construction Management for all disciplines for Material Handling Projects.
Perform Operator Training, Precommissioning and Commissioning of system components and hand over to operations.
Developed Control Narratives, Cause and Effect Diagrams, Logic Schemes, Plant Operation manuals.
2011-2011, Field and Business Development Support for Sulfur and Petcoke projects in Saudi Arabia and EMEA countries in specific O&M Petcoke and Sulfur Projects being developed for SATORP and Saudi Aramco by DEVCO.
2010 – 2011, DUKE IGCC Coal Gasification Project for the Coal Material Handling Sub project for the installation of the crushers, materials handling units on the DUKE Coal Gasification Power Plant project in Edwardsport Indiana. Total Installed Cost (TIC) approximately US $ 17.500,000
Developed Plant Operation and training manuals.
2009 – 2010, ALUTRINT Coke and Alumina Materials Handling System for GLF / NEC in Mandeville LA, Columbus OH and Trinidad and Tobago. Total Installed Cost (TIC)approximately US $ 97,000,000
2008 – 2009, Cement Storage Facility, train unloading and interconnections with the existing distribution plant for GCC for the storage and distribution facilities in Brookings, South Dakota. Total Installed Cost (TIC) approximately US $ 45,000,000
Worked as Owners Construction Manager
2007 – 2009, Construction and Engineering management services, for the different internal projects of River Consulting as well as fo inspection projects for the Port of New Orleans recovering from Hurricane Katrina.
PROJECT / CONSTRUCTION / AUTOMATION MANAGER 1986 – 2007 INELECTRA Caracas, Miranda, Venezuela
Started as Consultant to the Electrical and Instrument and Controls Department and progressed into overall Project Engineering, and multidisciplined Project and Construction Manager.
2005 – 2007, Development of the Basic Engineering of the SIOM project for SINCOR, supervising the executions of licensor Sub Contracts for the sulfur plant and solids material handling systems for SINCOR S.A., for the refinery in Puerto La Cruz, Anzoátegui, Venezuela. Basic Engineering design including the supervision of licensor sub contracts in the offices of the licensors in Dallas, Texas, USA and New Orleans, Louisiana, USA, as well as coordinating the design in Caracas, Venezuela. Total Installed Cost (TIC) approximately US $500,000,000
2004 – 2005, Several Conceptual, Basic Engineering, Studies and Detail Engineering projects (total of 14 projects) under an umbrella contract agreement with PETROBRAS ENERGIAS.A., for the refineries in Bahia Blanca and San Lorenzo, Argentina. Total Installed Cost (TIC) approximately US $ 1,500,000
2004 – 2005, Proyecto Revisión de Ingeniería, Provisión de Materiales y Montaje para Reforma del Colector de Aspiración de los Compresores de Propano en Planta LTS II, e Independización de la Producción de los Trenes Criogénicos en Turbo - Expander, Unidad Económica Loma La Lata Project. It included the Management of the Detail engineering design, material procurement and construction management, with plant shut downs for the required modifications of the Project developed in Lomas La Lata, Neuquén, Argentina. Total Installed Cost (TIC)approximately US $ 5,000,000
2004 – 2005, Engineering Studies of the PEMEX Gas and Energía Mayakan Gas pipelines, including the technical review, analysis and pipeline simulations of the gas pipelines forthe rate increases requested to the CRE, for the project developed by Stone & Webster Management Inc. in Caracas and Mexico.
2003 – 2004, Basic and Detail Engineering of the Fire Protection System Upgrade for the flow stations UM-1, UM-2 y Tucupita of Benton-Vinccler. Design of the Basic and Detail engineering for the project to be developed in Caracas, Temblador and Tucupita. Total Installed Cost (TIC) approximately US $ 155,000
2002 – 2003, Detailed Engineering of Phase II of the Dación Development Project for LASMO, in Caracas and San Tome, Anzoátegui. Total Installed Cost (TIC) approximately US $135,000,000
2002 – 2003, Design Engineering Manager for both the Basic (FEED) and Detail Engineering of Phase II of the Dación Development Project for LASMO, in Caracas and San Tome, Anzoátegui. Total Installed Cost (TIC) approximately US $ 35,000,000
1999 – 2002, as Engineering Manager, Automation Consultant and Construction Manager of the outside BOP of the Production Facilities of the Boquerón Oil Field for BP Project, in the project, in Maturin, Monagas. Total Installed Cost (TIC) approximately US $ 72,000,000
1999 – 2002, as Engineering Manager of the Phase 1 development of the Kaki and Maulpa oil fields of the INEMAKA Project, in Anaco, Anzoátegui, Total Installed Cost (TIC) approximately US $ 17,500,000
1997 – 1999, SCADA of the CHEVRON LL-652 Oil Production Platforms Project, in the Lake Maracaibo, Maracaibo. Total Installed Cost (TIC) approximately US $ 100,000,000
1997 – 1999, Design Engineering Manager and Construction Coordinator for the CHEVRON Expansion Project, in Campo Boscan Maracaibo. Total Installed Cost (TIC)approximately US $ 150,000,000
1986 – 1997, Various, detailed below.
Engineering assistance to various projects, as specialist in instrumentation, for the LAGOVEN Caripito Basic and Detailed Engineering, for the LAGOVEN Morichal Conceptual Engineering, etc., in Caracas. Construction supervision as team leader for electrical and instrumentation and Construction Superintendent for electrical and instrumentation, including loop testing, also assisted in the clearing of punch list items of other packages (Foster Wheeler Package A in the B3 and D1 blocks and the Coke Handling Unit) for the MARAVEN Expansion Project, in the Cardon Refinery, also the preparation of the construction work bid packages for the MARAVEN Expansion Project instrumentation packages, in Caracas. Total Installed Cost (TIC) approximately US $ 1,500,000,000 Preparation of the detailed engineering for the Plants Packages project of Refinería ISLA, as design team leader for all other disciplines, in Caracas and Curacao. Collaboration with the modification of the reused air conditioning compressors to be installed for the MARAVEN expansion project main building, in Caracas and Cardón Refinery. Total Installed Cost (TIC) approximately US $ 2,000,000
Preparation and collaboration with the presentation of bids for major, medium and minor projects on which INELECTRA was bidding on, such as the ACCRO project, MARAVEN privatization of power and steam, etc.
Preparation of the detailed engineering of the ACCRO project of CORPOVEN, S.A. as design team leader of instrumentation, in Caracas and Jose, and as a construction specialist for package unit start-ups, for metering skids, analyzers, compressors, etc., in Jose, Anzoategui, Venezuela. Preparation of the detailed engineering of the Methanol project of PEQUIVEN-MITSUBISHI, as design team leader of instrumentation, in Caracas.
Preparation of the detailed engineering for the project of moving the gas compressor station of LAGOVEN from Jusepin to Boquerón, as a design engineer, in Caracas. Preparation of the detailed engineering of the instrumentation of the conveying and storage system of the bauxite mine of Bauxiven in Los Pijiguaos, for ITALIMPIANTI, as design team leader of instrumentation in Caracas
Coordination of construction and testing of the instrumentation of the B.T.X. project of CORPOVEN S.A. of the areas of the Revamp units, new units and Offsites in the refinery in El Palito. Preparation of the detailed engineering for the revamp of the carbon black plant of NEGROVEN S.A., as design team leader for instrumentation, in Caracas and Valencia. Consultant for the detailed engineering for the utilities areas of the CARBONORCA project, in Caracas. Preparation of the detailed engineering of the revamp of the High Vacuum units # 2 and 3 of MARAVEN S.A. as design team leader for instrumentation in Caracas and the refinery in Punta Cardón. Preparation of the detailed engineering of the revamp of the Cat-Cracking plant (RFCC) of CORPOVEN S.A. as design team leader in Caracas and construction team lead in the the refinery in Puerto La Cruz. Preparation of detailed engineering of the SISCO project of CORPOVEN S.A. as design engineer for various projects of CORPOVEN, Gerencia de Gas, also construction supervisor a sample of the projects are the detailed engineering design of the gas reducing sub-stations of La Peñita, La Bonanza, Ramal Pequiven, etc., in the construction of the compressor station of Guacara, and various other gas sub- stations between the gas compression of Guacara and Morón. Preparation in the basic engineering of the SISCO project of CORPOVEN, S.A. as instrumentation design team leader.
EDUCATION
BACHELOR OF SCIENCE Aug 1969 – Dec 1972
Southern Institute of Technology Marietta, GA, USA Extensive coursework in Electrical Engineering, Degree not completed. SKILLS
Project Design Engineering Management, Project Management, Multitasking, Leadership, Team Building, Management of multiple projects, Shareholder Management, Stakeholder Management, Customer management, Development of Front End Loading (FEL) Process, Construction Management, Project Financials, Budgeting, Invoicing, Tracking, Change Order Management, Automation, Instrument and Controls Project Management, Precommissioning, Commissioning, Start Up, Operator Training, QU/QC of Design, Knowledge of Project Management Principles, PMBOK, FEED Design Engineering, Conceptual Design Engineering, Basic Engineering, Detailed Engineering, Design Engineering Supervision, Control Systems design, Equipment Migrations, Design Control Rooms, Substations, Satellite Control Areas, Data Centers, Refinery Engineering, Utility and Facility Engineering, Electrical and Instrumentation and Control Systems Specialist, Material Handling, Conveying and Storage Systems, Material Specifications, Equipment Specifications, Construction Management, Construction Contractor Supervision, Fabrication Supervision, Field Engineering, Health Safety Environmental and Hygiene, Job Site QA/QC, Project Scheduling, Material Procurement, International Shipping Logistics, Assistance in Project Quality Assurance, OSHA 10, OSHA 30, TWIC, Assistance in Project Document Control Development, Business Development, Generation of proposals, Adobe Acrobat, AutoCAD 2D, Microsoft Office, Microsoft Access, Microsoft Excel, Microsoft Outlook, Microsoft Teams, Microsoft PowerPoint, Microsoft Project, Microsoft Visio, Microsoft Word, Primavera P6, McKinsey WAVE, Maximo, COUPA, Navisworks, BLUE BEAM, Risk Management, Process Optimization, Technical Documentation, Cost Estimation, Regulatory Compliance, Conflict Resolution, Creative Problem Solving, Negotiation Skills, Adaptability, Time Management, Critical Thinking, Beverage Processing, Field Operations Management, Hydrogen Systems Design, Electrical Systems Design, Mentorship, Strategic Planning, Crisis Management, Interpersonal Skills, Emotional Intelligence, System Integration, Technical Training, Decision Making, Team Collaboration, Cultural Awareness, Innovative Thinking, Client Relations, Performance Management LANGUAGES
English (Native), Spanish (Native), Italian (Highly proficient), German (Novice), Portuguese (Novice) ADDITIONAL INFORMATION
GAP YEAR
Due to illness (gallbladder removal surgery, recovery and therapy) was not working from January 2024 to Mid 2025.
TECHNICAL ORGANIZATION MEMBERSHIP
Member ISA over 15 years
Member PMI over 10 years
Project Management with supervision of Engineering group to prepare drawings for Fabrication and / or Construction.
Assisted in the development of the Corpoven / Meneven Basic Engineering Manuals and Guidelines