Post Job Free
Sign in

Senior Electrical & Instrumentation Engineer

Location:
Mumbai, Maharashtra, India
Posted:
August 15, 2026

Contact this candidate

Resume:

Page * of *

Mohammad Tayeb

Sr. Electrical Engineer Oil & Gas, EPC & Commissioning

: - +91-932*******, :- *****.**********@*****.*** Passport No :- T0214531 (Till 05.11.2028)

● Educational Background

Bachelor of Degree [B. Tech] (Electrical & Electronics Engineering)

(Correspondence AIIT Hyderabad Affiliated by Gov. of Andhra Pradesh) 3 Year Diploma in Electrical Engineering (AICTE Ranchi University Jharkhand) Work Permit Receiver Exam Qualified from Saudi Aramco till 09.10.2026 Electrical Hazard Recognition Exam Qualified from Saudi Aramco till 26.11.2027

● Professional Summaries

19+ years Electrical Engineering leader in Oil & Gas across Offshore & Onshore & Gas Plants. Expertise in E&I Package Management, Hazardous Area Design, Commissioning and Team Leadership of 40+ Worker, Engineers/Supervisors, Delivered Many Major and Minor Projects for ONGC, Reliance, IOCL and International EPCs Like Aramco with Zero LTI.

Project Management E&I Engineering Detailed Engineering Procurement Construction Commissioning Hazardous Area Classification IS, IEC, API, OISD-117 HT/LT Systems Power Distribution VFD, Soft Starters, UPS, Emergency Power AutoCAD Vendor Management Contract Management Cost Control HSE Compliance

● Technical Skills

Clients Worked

with

Saudi Aramco Saudi Arabia– Offshore/Onshore

Jana Marine Services Saudi Arabia – Offshore/Onshore

ONGC– Offshore/Onshore

Larsen & Toubro Energy Hydrocarbon– Offshore/Onshore

Punj Lloyd- Offshore

Afcon Gunanusa Joint Venture

Leighton Welspun India Pvt Ltd

IOCL Mundra – Onshore

Reliance Industries Ltd – FPSO Offshore

Samsung – Offshore

OCS – Offshore

Installation,

Testing, Pre-

commissioning

& Inspection

Review and verification of Electrical & Instrument Index, Datasheets, Cable schedule, Single Line Diagram, Control Schematic of Motor feeder, P&ID, Instrument Installation drawings, General Arrangement Drawings, Instrument Points and Lines.

Participating in design reviews, AutoCAD, inter-discipline checks, 3D model reviews.

Client Interaction for fault finding, Loop checking of all the system loops with reference of loop diagrams & alarm tables.

Preparation of Redline mark-up drawings as per site requirements.

Testing & Inspection of HIPOT test of HV cable, Potential Transformer test, Earth resistance test and Current transformer test etc. Supervision &

Support

Vendor support– Eaton, CCI, Polycab, Rotork, Atlas Copco, Melcon, Roxtec, Sudhir SWGR etc.

Skid installation, Panel & Lighting system installation, MCT installation, Cable laying, Tubing/Cable tray installation, Glanding (barrier and non- barrier) and termination, Scaffolding work etc.

Page 2 of 3

Hook-up &

Construction

Supervision and installation of all Electrical & Instruments items. Knowledge of Electrical blueprints, SLD, Control schematic of motor feeder, interconnection dwg, P&ID, wiring diagram

System Handled – DCS, PCS, ESD, & F & G MV/LV Switchgear, MCC, Motors, Cables, Battery Charger & UPS System, VFD & Power Transformers.

Design Documents Review like power control cable sizing calculations, tray, MCT sizing calculations and breaker sizing calculations etc. Pre-

commissioning

Calibration, SAT, Cold/Hot Loop checking, System Integrity Test

● Employment Scan

MAHWS Oilfield Services Pvt Ltd Oct 2021 - To till Date Das Offshore Engineering Ltd Jan 2013 - June 2021

Savair Energy Ltd Oct 2010 - Dec 2012

OHCS (I) Pvt Ltd Sep 2007 - Oct 2010

● Professional Work Experience

Project Details in M/s. MAHWS Oilfield Services Pvt Ltd as Site In-Charge E&I Project Details in M/s. Das Offshore Engineering Pvt Ltd as Sr. Electrical Engineer Project Details in M/s. Savair Energy Ltd as Sr. Electrical Engineer Project Details in M/s. OHCS (I) Pvt Ltd as Electrical Engineer Name of Project DAMAN UPSIDE DEVELOPMENT PROJECT WELLHEAD PLATFORMS AND PIPLINES (DUDP-WP)

Name of Project TUR 503/504 Maintenance Work for Saudi Aramco Name of Project PRP-VII (Surveying)

Name of Project KGD6 RUBY FPSO Project Kakinada Andhra Pradesh Name of project LEWPP-1

Name of Project Daman Development Project

Name of Project C-26 Project

Name of Project Combined Station Works for Fire Augmentation of Firewater system Name of Project Pipe Line Replacement project phase III Name of Project Shifting of MIP from Neelam and re-install the same MIP at Heera Process Complex

Name of project Replacement of IA - UA Compressor & Instrument Air Dryer at BPA, BPB & ICW Platform in ONGC Offshore Platform.

Name of Project New Propane Gas Compressor Project at Uran ONGC Name of Project Replacement of Fire Networks Project at Hazira ONGC Name of Project Heera Redevelopment Project

Name of Project Mumbai High South Field Redevelopment Phase -II (ICP-R) Project Page 3 of 3

● Roles & Responsibilities

In-depth knowledge of data sheets, Electrical & Instrument drawings, Control schematics, I/O list, panels control wiring, SLD & P&IDs (In Tools).

Well known about IP codes, ATEX, OISD-117, Zone Classification, Insulation Class, Temp Class & Gas Group for flame proof and weather proof equipment’s.

Handle all aspects of Construction activities including site investigations, site surveys etc.

Coordination of finalizing Cable entries, cable routes, cable diversions etc.

Electrical, Instrumentation & Fiber Optic cable installation and its Glanding termination and splicing works

Manage & Supervise cable tray Installation & Instrument Control & Power Cable laying & termination work.

Supervise and manage Installation Earthing and Lightning Protection works.

Installation of Lighting and Small Power works. Manage and Supervise cable tray installation and Fire Alarm System and termination works.

Supervise the EPIC Contractors during the execution of construction activities at the construction site.

Coordinate mobilization of contractors on site.

Supervise and approve Construction activities and Co-Ordinate various aspects of project Construction including Inspections, Material submission and working drawings from contractors, and processing documentation as required.

Conduct Electrical & Instrument evaluation and troubleshooting for electrical, pneumatic, electronic system

Monitoring project status during periodic project review meetings.

Client Coordination & Daily Progress Review Meeting with Clients.

Review the calculation of Power Cable sizing and SWGR Equipment’s according to site requirement.

Review the calculations of power cable, CT/PT, Motor, cable tray & MCT frame and their blocks etc.

Installation, testing & commissioning of Current Transformers.

Cable laying, Tray works, Installation of several kinds of supports according to respective drawings.

Testing of Electrical equipment’s, Switchgear items, HIPOT Test and Transformers etc.

High Voltage Test as per IS code 1255 for Breakers, Bus Duct, Bus Bar and Power Cables etc.

Testing of HV/LV Motors, step up/step down Transformers & Battery load test.

Testing of Earth resistance for Earthing of Electrical Equipment’s.

Cable glanding, MCT & Tray sizing calculation for HT and LT cables.

IR value Test of power & control cables.

Review the power & Control wiring for Motor feeder.

Cable termination Continuity, Meggering and Loop checking.

Sign work permits on behalf of Client and to ensure that contractor’s compliance with work permits.

Participant Development of As-Built drawings/documentation

Pre-Engineering & Construction and Post Construction Survey Reports

Planning the projects, Time Scheduling, Time cycling of works.

Preparation of work procedure of Installation, Testing & Commissioning of HT/LT Feeder & Transformer.

Preparation Notification of Inspection Test Report and Request for Inspection

Tendering, Estimation & Coasting for Quote the Project.

Reviewing MTO for Electrical & Instrumentation System.

Responsible for reviewing clients' comments and do resolve on various Engineering deliverables.

Site visit for Witnessing various Quality Activities as per project requirements, Transmitters, Temperature Transmitters, Pressure Switches, and Shutdown Valves

Executions of cable tray, support fabrication, tray erection, bend fabrication and erection of Panel base frame, control, Power cable laying, glanding and termination.

Erection and commissioning of Battery charger, load test with battery bank.

Preparing Calibration and Test Reports, and Commissioning Reports for Projects under Execution.

Preparation of related documents for Electrical & Instrumentation Inspection Works.

Prepare Plan and Daily Progress Report (DPR).