Scott Moeller
**** ******* **** ****, ***********, TN 37042
PROFESSIONAL EXPERIENCE
Hopkinsville Community College-Hopkinsville, Kentucky (May 2026-Present)
Instructor for Mechatronics and Industrial Electrical Maintenance
●Advanced 14 week curriculum designed to turn out qualified technicians
●SACA National Certifications
●100% graduation rate as well as 100% SACA certification
Google Data Center-Clarksville, Tennessee (January 2026-May 2026)
Data Center Technician
●Qualified Control Room Operator in 3 months 1 week. Allotted time given to complete qualification is 1 year.
●Specialty training for advanced system controls
Hopkinsville Community College-Hopkinsville, Kentucky (June 2025-December 2025)
Instructor for Mechatronics and Industrial Electrical Maintenance
●Advanced 14 week curriculum
●SACA certifications
Nyrstar Smelting-Clarksville, TN (2022-June 2025)
Electrical Coordinator/Electrical Planner
●Project Supervisor of a $4,000,000 rectifier controls upgrade
●Responsible for critical spare parts ordering and sourcing
●Successfully rebuilt 56KA Siemans rectifier after explosion
●SAP experience
White Drives-Hopkinsville, KY (2021-Sept 2022)
Process/Maintenance Engineer
●Responsible for writing and publishing S.O.P’s
●Responsible for developing preventative maintenance program
●Assisted maintenance personnel in trouble shooting and repair
Tennessee College of Applied Technology (2018-Oct 2021)
Lift Instructor/IEM instructor/Mechatronics Instructor/Early Technical College
TGASK - Hopkinsville, KY (2017 – 2018) Multi-Craft Maintenance Technician
●Duties range from troubleshooting Omron and Allen Bradley PLC’s
●Troubleshooting and repairing hydraulic and pneumatics
●Control all PLC changes and backups
●Touchscreen programming VFDS IAI robots along with Fanuc and Motoman robot maintenance
USA Needle - Central Square, NY (2010 – 2017) Controls Engineer/General Manager
●Completely automate a diabetic lancet factory through taking manual cylinders and replacing with CNC drives feed from conveyors to cut raw material to correct length
Viam - Manchester, TN (2007 – 2010) Plant Engineer
●All aspects of project management, industrial time studies budgets, installation of new equipment, reduction of downtime, Kaizan and Pokeyokes
●Had control over three factories, two of which stamped out floor mats for most car manufacturers, the other made mats via injection molding
●Automated and synchronize first industrial Motoman robot to a servo controlled turn table to serge the edging on the mat
Nissan North America - Decherd, TN (2000 – 2007) Maintenance Engineer
●Extensive Japan travel to oversee production testing, time trials, previous lessons learned corrected installed two 200 million dollar headlines and had them up to 90% OEE within 3 month
●Day to day assist in troubleshooting complex problems, major downtime reports and corrective measures, monthly update on status of the line with the plant manager
●Managed teams of technicians for complex upgrades
Bridgestone North America - Morrison, TN (1997 - 2000) Multicraft Maintenance
●In charge of daily breakdown repairs for 39 tire assembly machines, mechanical and electrical
●Troubleshot motorman and Fanuc robots
●Troubleshot with Hitachi, Mitsubishi, Allen Bradley and Omron PLC's
US Navy (1990 - 1996) Nuclear reactor operator Reactor Technician Certified Naval Instructor
●E-6 leading Petty Officer over 70+ men
●In charge of supervision of operation of 2 GE 550MW nuclear reactors
●Selected as ORSE Reactor Technician where we successfully recovered from a real casualty during our examination by the ORSE team
●Certified Naval Instructor with focus on Nuclear Plant Operation, Nuclear Plant Maintenance as well as chemistry, physics, materials and casualty response and recovery.