Post Job Free
Sign in

Senior Project Controls Engineer & Planning Engineer

Location:
Doha, Qatar
Salary:
QAR18000
Posted:
April 25, 2026

Contact this candidate

Resume:

CHIMAOBI

UZOMA

OKORO

Senior Project Controls

Engineer Change &

Cost Control Specialist

*****.*.*****@*****.***

+974-********

Doha, Qatar

Open to FIFO / International

Assignments

PROFILE

Senior Project Controls Engineer with

over 15 years of experience in large-

scale infrastructure, oil & gas, and EPC

environments. Proven expertise in

change control, cost engineering,

forecasting, trend analysis, and

commercial governance across multi-

billion-dollar projects.

Strong background in integrating

change management with risk, cost,

and claims processes to protect project

margins and enhance financial

transparency. Experienced in

supporting executive leadership with

data-driven insights during critical

project execution phases.

Currently pursuing an M.Sc . in

Management to further strengthen

strategic and commercial leadership

capabilities.

PROJECT EXPERIENCE

HIGHLIGHTS

Large Infrastructure Developments

(Civil & MEP Scope)

Oil & Gas EPC Projects

Industrial Facilities & Utilities

Projects

PROFESSIONAL EXPERIENCE

Senior Project Controls / Planning Engineer

Unitech Contracting and Engineering Services WLL

01/2020 – Present Doha, Qatar

•Led end-to-end change control processes including identification, impact analysis, pricing, approval workflow, and integration into baseline budgets.

•Developed and maintained detailed cost forecasts

aligned with project execution strategies.

•Performed trend analysis to identify early cost

overruns and schedule risks.

•Supported quarterly financial forecasting across

multi-disciplinary international project teams.

•Provided commercial insight to Project Managers and senior leadership for executive reporting.

•Integrated risk register with cost control systems to quantify financial exposure.

•Supported claims preparation through detailed

change documentation and delay analysis.

•Strengthened governance processes ensuring

compliance with contract terms and internal controls.

•Operated within lean project controls teams, taking ownership of cost, schedule, and change tracking.

Planning & Cost Engineer

Arab Engineering Bureau Redco

10/2018 – 12/2019 Doha, Qatar

•Prepared cost-loaded schedules and monitored

project performance using EVM.

•Developed cost breakdown structures aligned with

WBS.

•Monitored procurement and subcontractor cost

performance.

•Conducted variance analysis and prepared

management dashboards.

•Coordinated with procurement, engineering, and

construction teams to ensure cost transparency

•Maintained high standards of quality control through diligent review of deliverables and adherence to

specifications.

•Collaborated with cross-functional teams to develop comprehensive project scopes and objectives.

•Planned and coordinated materials, equipment and

labor for seven projects.

•Increased throughput by 35% through accurate

analysis and optimization of production processes. Planning Engineer

Al Darwish Engineering WLL

09/2013 – 08/2018 Doha, Qatar

•Participated in weekly progress meetings, providing updates on schedule adherence, resource allocation, and overall project health.

• Reviewed design documents and coordinated revisions as necessary to meet changing client requirements or construction constraints.

CHIMAOBI UZOMA OKORO,

*****.*.*****@*****.***

1 / 5

Commercial Construction Projects

Experience in contractor-side

environments with strong exposure to

commercial governance, change

valuation, and contract compliance.

CORE COMPETENCIES

Change Control & Variation

Management

Cost Estimating & Budget

Development

Trend Analysis & Forecasting

(Quarterly & Annual)

Claims & Contract Administration

Support

Earned Value Management (EVM)

EPC Project Environment

Cost-to-Complete (CTC) Analysis

Schedule & Cost Integration

Stakeholder & Cross-Functional

Coordination

SAP (Cost Modules) Primavera P6

Advanced Excel

TECHNICAL SYSTEMS

SAP (Cost Control & Reporting)

Primavera P6

Microsoft Excel (Advanced Financial

Modeling)

MS Project

Power BI (Reporting Exposure)

EDUCATION

M.Sc. Management (In Progress)

University of Huddersfield

UK

Higher National Diploma (HND)

Federal Polytechnic Nekede

07/2006 Owerri Imo State, Nigeria

• Maintained excellent communication with clients, providing regular updates on project status and

addressing concerns promptly.

• Developed customized reports for stakeholders,

presenting key performance indicators that informed decision making.

• Made accurate estimates for timescales and costs for five projects • Used Oracle Primavera P6, MS Project, to draw plans for five different projects.

• Improved productivity 25% by implementing updated capacity-planning models.

• Developed contingency plans to address unforeseen challenges, minimizing disruptions to overall project timeline.

Offshore Scheduler

Ocean Marine Solutions Ltd

02/2010 – 06/2013 Port Harcourt/Nigeria

• Reduced scheduling conflicts and ensured timely

execution of tasks through proactive rescheduling and resource allocation adjustments.

• Maintained high level of customer satisfaction

through diligent scheduling coordination, ensuring all deliverables were met within agreed timeframes.

• Consistently met deadlines by effectively allocating resources, tracking progress, and making necessary adjustments to schedules as needed.

• Worked with supervisors and team members to

understand supply needs and bring levels within

desired tolerances.

• Identified best practices within the scheduling

function, sharing these insights across teams to drive continuous improvement efforts.

• Proactively addressed potential risks within the schedule by conducting thorough analyses and

implementing preventive measures where necessary.

• Optimized scheduling processes by implementing

efficient software tools and organizational systems

• Conducted in-depth analysis of scheduling failures to prevent recurrence, enhancing overall project

reliability.

• Monitored project progress against schedules

meticulously, identifying lags early and adjusting plans to stay on track.

• Prioritized tasks according to strategic importance, ensuring that critical project milestones were met on time

PROJECT

Project: Reconstruction & Upgrading of Old Salwa

RPS with Underground Reservoirs (GTC-518)

Major Infrastructure & EPC Projects

01/2023 – present Doha, Qatar

Project Value: QAR 85,970,492.92

Key Stakeholders:

•Client - Kahramaa

•Consultant – ECG

CHIMAOBI UZOMA OKORO,

*****.*.*****@*****.***

2 / 5

National Diploma

Federal Polytechnic Nekede

12/2002 Owerri Imo State, Nigeria

PROFESSIONAL

DEVELOPMENT

Advanced Project Controls Practices

Cost Engineering & Forecasting

Workshops

Risk Management & Claims

Awareness

Leadership & Commercial

Management Training

PROFESSIONAL

STRENGTHS

Strong change engineering

background

Commercially aware and contract-

focused

Clear communicator with senior

stakeholders

Data-driven decision support

capability

Experience in execution-phase

project environments

Comfortable in site-based roles (FIFO

adaptable)

•Main Contractor – Navayuga Engineering Company

•Subcontractor – Unitech Contracting and

Engineering Services WLL

Scope of Work:

Automation Works • Pump House & Control

Building:

Complete supply, installation, testing, and

commissioning of MEP and automation systems.

• Reservoir Gallery: Implementation of electrical, mechanical, and instrumentation systems. • Facility Upgrades & New Structures:

Power & Control Infrastructure:

• Switchgear Buildings: LV5 & LV6 systems

• MV (Medium Voltage) Room: Installation and

commissioning of power distribution systems.

• MCC (Motor Control Center) Room:

• Transformer Room: Electrical infrastructure for power distribution

Gewan Island Infrastructure Works – Package

CP/18-5, P2005 CP/18-5, P2005.

Large Infrastructure Developments (Civil & MEP Scope) 01/2020 – 12/2022 Doha, Qatar

Project Value: QAR 500,970,492.92

Key Stakeholders:

• Client: United Development Company (UDC)

• Project Consultant: KEO International

• Main Contractor: Navayuga Engineering Company

• Subcontractor: Unitech Contracting and Engineering Services WLL Scope of Work:

Mechanical & Wet Utilities:

• Supply, installation, testing, and commissioning of:

• Pre-Insulated Steel Pipes for the Chilled Water

Network

• Glass Reinforced Plastic (GRP) Pipes for Stormwater and Wastewater systems

• Ductile Iron Pipes for the Potable Water Network

Electrical & Dry Utilities:

• Supply, installation, testing, and commissioning of:

• Medium Voltage (MV) & Low Voltage (LV) Networks.

• Telecommunication & Street Lighting Systems.

• Extra Low Voltage (ELV) Network

MEP & Instrumentation for Utility Buildings:

• Electrical, mechanical, and instrumentation works for multiple utility buildings, including:

• Electrical Substation Buildings (A, B & C)

• Sewage Pumping Stations (1, 2, 3 & 4)

• Water Reservoir & Pump Station Building Vacuum

Station Building

• Landscape Maintenance Building

• Reservoir Pump Station Building

• Gas Plant Building

• HEX Building for Chilled Water Network, including tie-in to Qatar Cool

CHIMAOBI UZOMA OKORO,

*****.*.*****@*****.***

3 / 5

Project: Construction VIVA BAHRIYA – VB11 & VB17,

THE PEARL

Commercial Construction Projects

10/2018 – 12/2019 Doha, Qatar

Project Value: QAR 560,000,000.00

Key Stakeholders:

Client: Dorrat Doha

Consultant: Arab Engineering Bureau REDCO

Contractor: Al Mana

Project Overview: The project consists of two high-rise residential towers (VB11 & VB17) with 23 floors in the prestigious Pearl Qatar. Each tower features 19

residential floors, with 5 to 8 apartments per floor and top-tier amenities, including: Gymnasium • Swimming pool & spa area • Water features • Children's play area • Landscaped Garden.

• Scope of Work – Complete MEP Package

Mechanical, Electrical, and Plumbing (MEP)

Systems:

• Drainage, Plumbing & Firefighting Systems –

Installed as per client specifications.

• HVAC System – Designed and installed to meet

performance and efficiency requirements.

• Fire Alarm System – Integrated for safety and

compliance with regulatory standards.

• Low Current Systems – Installed as per client

requirements, ensuring seamless building automation and security.

Project: Construction of (10) New KG in Doha &

Villages – Package-6, Site #57

Large-Scale Engineering & Construction Projects

09/2013 – 08/2018 Rawdat Abal Heeran, Qatar

Project Value: QAR 380,000,000.00

Key Stakeholders:

Client: ASHGHAL

Contractor: Al Darwish Engineering

Project Overview: The project involved the construction of 10 new kindergarten (KG) facilities in Doha and surrounding villages, aimed at enhancing educational infrastructure.

Scope of Work:

Structural & Architectural Works – Development of

modern, child-friendly KG buildings. MEP Systems

Installation – Including HVAC, electrical, plumbing, and firefighting systems.

External Works – Landscaping, playgrounds, parking, and access roads.

Safety & Compliance – Ensuring adherence to

ASHGHAL and Qatari building regulations.

Project: Survey for Installation of Oil Pipeline

Large-Scale Engineering Oil & Gas EPC Projects

09/2012 – 06/2013 Rivers, Nigeria

Project Value: N1,200,000,000.00

Key Stakeholders:

• Client: SHELL Petroleum Development Company /

SNEPCO Joint Venture

• Main Contractor: Bourbon Liberty

CHIMAOBI UZOMA OKORO,

*****.*.*****@*****.***

4 / 5

• Subcontractor: Ocean Marine Solutions Ltd

Project Overview: The project involved conducting a comprehensive offshore survey for the installation of an oil pipeline from Shell Bonny Export Terminal to SBM1

& SBM2, leading to the crude oil loading point at Bonny Island Offshore.

Scope of Work:

• Pipeline Route Survey – Detailed bathymetric and geophysical survey for pipeline alignment.

•Environmental & Geotechnical Assessments –

Ensuring suitability of seabed conditions for pipeline installation.

•Offshore Survey Operations – Utilizing advanced

marine survey technology to map out the pipeline

corridor.

•Data Collection & Reporting – Providing crucial

insights for pipeline design, installation, and risk mitigation.

Ship-to-Ship Transfer Security Surveillance

Large-Scale Engineering Oil & Gas EPC Projects

05/2011 – 08/2012 Okono Oilfield, Nigeria

Project Value: N3,000,000,000.00

Key Stakeholders:

• Client: NNPC /AGIP Unlimited Joint Venture

• Contractor: Ocean Marine Solutions Ltd

Project Overview:

The project involved providing security surveillance for Ship-to-Ship (STS) crude oil transfer operations on the FPSO-Mystras at Okono Oilfield, offshore Nigeria.

Scope of Work:

•Maritime Security Surveillance – Ensuring the safe and secure transfer of crude oil between vessels.

•Monitoring & Threat Prevention – Identifying and

mitigating potential security risks during STS

operations.

• Vessel Traffic Coordination – Facilitating smooth operations by coordinating vessel movements and

logistics.

•Compliance & Safety Assurance – Adhering to

industry regulations and security protocols for

offshore oil transfer.

CHIMAOBI UZOMA OKORO,

*****.*.*****@*****.***

5 / 5



Contact this candidate