Post Job Free
Sign in

Electrical Engineer with Multinational Project Leadership

Location:
Singapore, Central Singapore Community Development
Salary:
8000
Posted:
April 24, 2026

Contact this candidate

Resume:

TAN AH CHUN

Mobile: **** ****, *********@*****.***, linkedin.com/in/ah-chun-tan-13487a76

Singapore PR since 1998, Availability: Immediate

CAREER OBJECTIVE

• A strong Leader and team player with Local and multi-national environments, adept at providing solution,

collaboration and communication to clients, management, business, and stakeholders. Resolving the conflicts of Arch, Consultants, PM, RTO, MainCon, & Subcon, Liaison with Authority, Safety and Health.

• In Project Management planning and scheduling, tasks, time lines, critical path, miles stone, time and budget, Checking of Architectural with Structural, M&E tender drawings for RFI’s and Prepared Shop Drawings/CSD/Materials RFA’s submissions, Upstream and Downstream, Back to back system, Payment upon Progress, Abortive work without planning causes Losing the job, SOP, Standard deliveries, inspections on schedule and kick-off/Tools box meetings, highlighted the project issues. Method statement submission from DSC, Reminded the sub cons of work.

Prepared and submitted progress/Demo reports. 415Volt Switch / Tele-com rooms handing over procedure, FAT/SAT, OMM, and RIs /TOP inspections.

In commercial project (Police HQ), Yec Engineering P/L(NSC), 22kV/415LV Switchgears/ AHU/ Motor-Pump, VFD/ Transformer(22kV/415LV)/ Genset/Rooms, Aircooled Chiller, ELV, BMS, Security, CCTV, MCT, Fire Protection Systems, Sanitary Plumbing, Electrical, Telecom, VRV/Split ACMV/Syatems, FAT/SAT, and Inspections. Prepared OMM and handed over to customers. SingTel Data Facilities (Large Scale), At Telepark, Tampines, Cooling Tower, CRAC/AHU/ Chiller Plant/VFD/ Pump/ MCC/ Rooms, UPS/ Genset/ Battery/HT/ Switch/Server/ Rooms. FM200/ Fire Alarm Systems.

2018 SS638 Electrical, Design Layout, SLD, Circuit breaker amp rating/Cable size selection/Load amp, Equipment selection, sub-main Cable sizing by checklist 100m, Load Calculation, Max Demand, L.F., Voltage Drop Calculation, Earth pit layout, Lux Calculation, SS 555: 2018 LPS Clauses 8.3 to 8.6.

all Earth Pit Looping connection, Pilecap/Ground I.L./Lightning tape Coordination, & IEC 60909, Short Circuit Calculations. ESS/Fire alarm Design, Underground SPPG reticulations plan with other services coordination.

SS 636: 2018 PUB, LV Bus bar protection from FCU drain pan water dr op, sanitary pipe crossing in Master BedRoom due to its transfershaft. Sprinkler pipe flange area water drop on plumbing pipe to cover.

BCA and LTA Coordination areas: S/S 22kV outgoing Lead-In Pipe clearance 300mm above Cascaded LTA Drain (if depth 4 to 5m), S/S 22kV outgoing Lead-in Pipe 200mm clearance below LTA Drain (if not deeper), Telecom outgoing Lead-in pipe below LTA HT Line.

BCA areas: Outgoing main IC Line is below outgoing Lead-in 22kV Pipe Line. PUB structural surface drain clearance 100mm from 2018 SS 555 ICs, SPPG Reticulation Plan Pipe Services Coordination with other services.

M&E Clearance of Lift shaft, slab/wall openings, Natural ventilation air in/out at slab, MV exchaust/ fresh air openings for casting, AC ledge resizing for A/C equipments space coordination. hoisting heavy equipment to 7-Sty.

Assembly on control Ccts, panel fabrications in Chan Ho Engineering P/L (AutoBender Press Brake AutoShear Guillotine).

Control Syatems Specialisation in Department Of Electrical Power Engineering as Lecturer, Rangoon Institute Of Technology.Working experiences in Commercial Project, Police HQ(Tanglin) and Data Centre, SigTel, Operation: Chiller Syatems BMS, Singapore.

KEY SKILLS

• Data management • Data analytics • Stakeholder manag, ement

Resource management • Risk management • Incident management.

Client relationship • Outsource management • Microsoft Office /Project /AutoCAD/

Management PDF/Photoshop/Revit/Navisworks/

IT skills/Internet/email/ Dem Report

FUNCTIONAL CAPABILITIES

• Applied Exel to update status of shop drawings for large scale project (NYP)

Extracted authority website data to incorporate into Above/Below Ground Coordinated Services CSD/ SEM Drawings by AutoCAD, Structural model with MEP equipments by Revit/Naviswork(Sunhuan/TransBuild-HDB Project).

• Analyzed Engineering data to match with site data to reach a goal by coordination with senior site

Installation personnel(Norvale Electrical Engineering).

• Updated drawing submission to Consultants with liaised with Subcontractors.

Resource management

Worked with supplier manpower/supervisors closely to achieve the goal.

Followed up Client’s representative for inspections with documentations

Attended the Client and consultant meetings.

Found out the way to solve the updated problems of new environments.

Monitored the site installation according to drawings, and updated regulations.

Chaired the subcontractor meetings and prepared meeting minutes for sending out to all parties.

Allocated materials delivered at site in proper designated area.

Stakeholder Management

• Managed stakeholders’ expectations to meet budgets, timelines and deliverables.

• Provided justifications and resolved differences in opinions in amicable manners to maintain good working relationships at all levels and across departments.

Incident and Risk Management

• Reported and monitored Incidents and risk occurrence according to the risk regulations and procedures

• Briefed all workers about safety regulations to take care the resident’s complains at toolbox meetings

• Liaised with Authority in order to in line with site regulations.

Client Relationship Management

• Explained the site progress and reports to Client and Consultants in the meeting room.

• Submitted biweekly meeting reports to Clients and Consultants.

• Attended emergency meetings arranged by Clients or Company Director.

Outsource Management

• Found out the source of materials and/or liaised with the purchaser

• Checked out the manpower supply utilized at worksite and recommended correct number.

PROFESSIONAL EXPERIENCES

•Newtech Technology (South Asia) Pte Ltd(SingTel Managing Agent), Singapore Dec 2020 – Mar 2021

Asst. Engineer(M.A.): DC Operation Maintenance; supervision on contractors At SingTel Data Center Facilities, TelePark, 5 Tampines Central 6, Singapore

Fucom Construction P/L, Singapore M&E Coordinator Jan 2020- May 2020

Proposed Erection Of A 3-Sty General Industrial Building at Woodlands Terrace, Singapore

Sunhuan Construction/ Transbuild Corporation(S) (B-Construction P/L), Singapore

M&E Engineer Dec 2014- Aug 2016

Proposed Public Housing Development, Comprising 3 Blocks of 13/14-Storey Residential, Building, 1 Block of MSCP with ESS, Precinct Pavilion & 2 Common Green (Sembawang N1C4).

Proposed Public Housing Development, Comprising 4 Blocks of 11-Sty Residential Building,

1 Block of MSCP with ESS,, Precinct Pavilion, Common Facilities (Sembawang N1C5)

Awp Architects P/L, Singapore Consultant Project Manager Aug 2013 – Apr 2014

Design and build of Upgrading Projects HIP/LUP For HDB G13G Precinct, Singapore.

[Macpherson/ Geyland/ Bedok Reservoir Precincts]

Zhonghe Huaxing Development( China Nuclear Industrial.) P/L, Singapore

M&E Coordinator Jul 2012 - Apr 2013

Proposed Erection Of A 7–Storey(72m) Single-User (Super Coffee) General Industrial Factory

with Ancilliary Office & Mezzanine Floors, At Tuas West Drive (Tuas Planning Area), Singapore.

Okh Holdings P/L, Singapore M&E Coordinator Apr 2011 – Feb 2012

Proposed Erection Of An 8- Storey Multiple-User Clean And Light Industrial Development with Mezzanine Floor at 8th Storey Comprising 220 Flatted Factory Units with A Staff Canteen at Yishun Avenue, Street 23 & Yishun Industrial Street 1, Singapore.

Seah Construction P/L, Singapore M&E Coordinator Jun 2010 – Dec 2010

Proposed Landed Housing Development Comprising 84 Units of 3-sty Terrace and Semi-Detached Dwelling Houses ( Ph 2/3 ) and 2 Showhouses/ Sales Gallery at AMK5, Singapore.

Norvale Electrical Engineering P/L, Singapore Electrical Engineer Apr 2009 – Aug 2009 Design and Build Condominium Housing & Development Comprising 9-Blks of 5-stories, 180 Units Residential Flats Basement, Carpark, Swimming pool and Communal facilities at Balmeg Hill, Singapore

Lincolne Scott Ng P/L, Singapore Electrical Designer Feb 2008 - Jul 2008

Designing on ESS, Telecom, in Residential Projects 12 Sty (23 units), 15 Sty 13 Blks, 17Sty 2Blks, (110 units),

28 Sty, 5 Blks Commercial & Carpark.

William Ng Consultants P/L, Singapore Electrical Designer May 2007 – Feb 2008

Designing on ESS & Telecom, in School, Embassy, factory & Residential projects.

Ee Koon Construction P/L, Singapore M&E Site Coordinator Aug 2006 – Mar 2007

Proposed Erection of 2 Blocks Of 5-Sty Flat with Attic, Swimming Pool & Carpark, at Lor G-Telok

Kurau, Singapore.

Wang Fung Construction P/L, Singapore Arch/M&E Coordinator Feb 2005 – May 2005

Proposed Erection of 6-sty Building, at Lor Napiri, Singapore

Jalex Interior Environment Builder( S ) P/L, Singapore M&E Manager Apr 2004 – Oct 2004

Proposed Erection & renovation works on Chancery, Facilities and Residential Of Malaysia Commissioner, at Jervois Road, Singapore

Nam Tat Construction Co. P/L, Singapore M&E Coordinator Feb 2003 – Jan 2004 Proposed Erection of 4 Sty 5 Blks Residential (All Green Developer- Cherry Garden), with Basement Carpark & Swimming Pool, at Lor Lew Lian, Serangoon, Singapore.

Ishikawajima Harima Heavy Ind.( I.H.I.) Co. Ltd, Singapore M&E Inspector Nov 2001 – Jun 2002

Proposed Erection of PPE Plant( Asahi Kasei ), and Ancillary Buildings, at 65 Sakra Rd, Jurong Island,

Singapore

Yec Engineering (S) P/L, Singapore Asst Engineer (Electrical) Dec 1999 – Jun 2001

Proposed Erection Of A 7-Sty, Police HQ with 2-Basements, Commercial Project

(Next to the KK Hospital) at Kampong Java Road, Singapore.

Appointment confirmed. Project completed. 2-month Bonus & AWS receive, Overtime claim.

The Project Start to End Complete.

Evan Lim & Co P/L, Singapore M&E Engineer Jun 1996–Jan 1999

Proposed Erection Of NYP & NIE School Projects, Singapore

Chan Ho Engineering P/L 19, Benoi Crescent, Jurong Ind. Est., Singapore

Electrical Engineer Nov 1995 – Jun 1996 Assembly on control Ccts, panel fabrications for ( AutoBender Press Brake AutoShear Guillotine ).

RANGOON INSTITUTE OF TECHNOLOGY ( RIT ), Ministry of Education ( MOE ), Myanmar

Department of Electrical Power Engineering Lecturer/ Asst Lecturer/ Instructor Oct 1982 –Jan 1995

Control Systems Theory, Linear Systems Analysis, Electrical Engineering Circuits Analysis, Elements Of Power Systems Analysis. Principles and Practice of Electrical Engineering.

PWD, Rangoon, Myanmar

Asst Electrical Engineer Electrical workshop Nov 1972–Sep 1982

EDUCATION

Rangoon Institute Of Technology ( RIT ), Myanmar

Master’s Degree (M.Phil.) in Electrical Power Engineering, 1991.

Bachelor’s Degree (B.E.) in Electrical Power Engineering, 1972, Qualified, GPA 4/5. Recognized by P.E.Board, Singapore.

PROFESSIONAL ENGINEERS (APPROVED QUALIFICATIONS) NOTIFICATION 2009.pdf

USAID RANGOON

TOEFL Score 527, GRE (General Test) Score 1480, 1987

PROFESSIONAL CERTIFICATIONS

SCWSH (BCSS), 2020, NTUC, Singapore,

Revit / Navisworks, 2015, Crown System (S) P/L, Tampines, Singapore



Contact this candidate