RESUME OF
Shah Mohammed Ashikuzzaman
San Antonio,
Texas 78245.
**************@*****.***
Cell -956-***-****
Objective
Aresponsiblepositionprovidingforcareergrowth,utilizingleadershipskills,compatibility with others and educational experience.A desire to contribute effectively through motivation,discipline and hard work.
Work Experience
leadman Aug 1,2018 -Till date
JW Sands LLC
Dryer operator April 16,2018 -Jul 31,2018
JW Sands LLC
Tasks:
Efficient and consistent operation of plant production.
Monitor production related machinery,lubricating and inspect plant daily
Perform preventive maintenance and pre-shift inspections.
Repair and clean equipment as needed.
Ensuring the proper workflow
Monitoring schedules,assuming all workers allotted to the worksite,checking to see if the work progresses as per the schedule.
Production Team Member January 22,2018 -April 13,2018 TOYOTETSU AMERICA (AEROTEK)
Tasks:
Produce assemblies of metal work piece to quality and efficiency standard, repetitively lifting and placing metal workpiece into robotic welding fixtures.
Removing completed assemblies and examining work pieces for defects as prescribed.
Sales Manager
TREASURE LAND (F &K Khan Inc)Feb 2016 -Jan 15,2018 TASKS:
Jewelry sales,maintaining cash registers,jewelry repair and inventory. Page 2 of 3
Shah Mohammed Ashikuzzaman RESUME
Production Team Member (Temp)Oct 8th,2015 – Oct 30th,2015 AVANZAR INTERIOR TECHNOLOGIES (IHC)USA.
TASKS:
Quality inspection of molded foam,backing,demolding,defective foam repair, stocking,
Quality inspection of 3000 ton,1500 ton injection molding products,assembly and stocking
Manager (Maintenance)November,2000 -April,2015
ROYAL CEMENT LTD.Bangladesh
TASKS:
Erection and commissioning and maintenance of (unit I)two complete lines (1600 TPD)ofcementmills(BallMills,Separator,IdFans,FilterBags,BucketElevators, Conveyor Belts,Air Slides,Pump Compressors,Blowers,Jaw Crusher,Vibrating Screen,ScrewConveyors,RotaryAirLock,oneHaverandoneWuxiRotaryPacking Machines etc.)Under supervision of experts fromHTCChinaandgermanexperts from HAVER &BOKER GERMANY.
Erection &Commissioning of 10MW Power Plant (Rolls Royce Bergen Gas Generators,Caterpillar and Mitsubishi Diesel Generator).
Modification and Fabrication of Mill Air Slides and Chinese Designed Rotary Packing Plants for Power Saving Purpose.
Erection and Commissioning and maintenance of(UnitII)onecompleteline(1400 TPD)of Cement Mill(BallMill,Separator,IDFans,FilterBags,BucketElevators, Conveyor Belts,Air Slides,Pumps,Compressors,Blowers)under supervision of experts from CHMC CHINA.
ErectionandCommissioningofonecompletelineofP.P.BagPlant(CircularLoom, MultiPastingBagMakingMachine,ServoFullyAutomaticWovenBagConversion Line,FlexographicReelToReelPrintingMachine,Cutting-SewingMachine)Under Supervision of Experts from KUNG SHING TAIWAN.
Erectioncommissioningandmaintenanceof Drier(UnitI)onecompletelineof (30 TPH)of Drier (Conveyor Belts,Bucket Elevator,Bag Filter,ScrewConveyor,Fan Blower,Drier Shell,Drive Unit)
Erection commissioning and maintenance of (Unit III)one Complete Line (1400 TPD)of Cement Mill(BallMill,Separator,IDFans,FilterBags,BucketElevators, Conveyor Belts,Air Slides,Pumps,Compressors,Blowers)under supervision of Experts from CHMC CHINA.
Operation and Maintenance of Cement Mills,Driers and Rotary Packers. Page 3 of 3
Shah Mohammed Ashikuzzaman RESUME
As Process Engineer Aug,1999 -October,2000
T.K.CHEMICAL COMPLEX LTD.Bangladesh
TASKS:
Supervision,Operation and Optimisation of Paper Mill (StockPreparationProcess, PaperMachineProcessandFinishingProcess),UnderSupervisionofExpertsFrom FRANSASIA FAR EAST Inc.,PHILIPPINES.
As Junior Engineer (Mechanical)April,1998 -July,1999 CHITTAGONG CEMENT CLINKER &GRINDING CO.LTD.Bangladesh TASKS:
Erection and Commissioning of second Grinding Unit Complete Line (90T/h)of CementMill(BallMill,IDFans,Separator,BucketElevators,FilterBags,AirSlides Conveyor Belts,,Pumps,Compressors,Blowers)under supervision OfERCOM CONSULTING ENGINEERS PVT.LTD.,INDIA.
Special Technical Skills
Highly safety conscious,supports safety function and looks for safer ways of working.
Develop &Implement schedule Maintenance Programme for Process Machinery
Issue of Drawings/Specifications
Preparation of Maintenance Plan
Ensure Processing Machines are in satisfactory working condition
Analysis of Machine Down Time,Life of Spares and Performance of Machine
Assist to Calibration &Control of Measuring Devices
Maintain all Measuring Instrument properly
Good knowledge on Rotary Machines,Static Equipment.
Self motivated ability to work hard individually and with a team.
Good Coordination,Planning and Organizing Knowledge.
Ability to sharing Technical Knowledge with other team members.
Supervisory skill to Supervise Technicians as a Team Leader.
CompletecompetencyassessmentonpermittoWorkSystem,Pump,PressureSafety Valve,Instrument Air Compressor,Bearing,Valve,Alignment,Static Equipment, Seals and Gasket,Pipe &Fittings,Lifting operation. Page 4 of 3
Shah Mohammed Ashikuzzaman RESUME
Training
Nov 25th,2012 -Nov 30th,2012
Plant Visit and Training on Clinker Production Process,Cement Manufacturing Process and Maintenance at SIAM CEMENT GROUP.THAILAND. 31st March 2007
SeminarinDhakaBangladeshonGrindingTechnique,ElectricPowerUtilizationand Cement Quality organised by SIAM CEMENT TRADING CO.THAILAND. July 07th,1997 -September 11th,1997
AttachmentTrainingonManufacturingandMaintenancesatGULFRAHABIBLTD. CHITTAGONG,BANGLADESH.
Academic Summary
Chittagong Polytechnic Institute (Bangladesh)
DIPLOMA IN ENGINEERING (MECHANICAL)'97
Have completed the Diploma-In-Mechanical Engineering in Second Division under Bangladesh Technical Education Board (B.T.E.B.),Dhaka,Bangladesh. Fouzdarhat Collegiate School (Bangladesh)
SECONDARY SCHOOL CERTIFICATE (S.S.C.)’1993
Have completed the first Division in Science Group from Comilla Board,Comilla Bangladesh.
Computer Skills
Microsoft Office,
Language
Fluent in speaking and writing in Bengali,hindi and English Page 5 of 3
Shah Mohammed Ashikuzzaman RESUME
Professional References :
1.Jim Walker
CEO
J W sands LLC
Cell -480-***-****
2.Mateo hernandez
general manager
J W Sands LLC
Cell -903-***-****
3.Donald dent
Superintendent
J W Sands LLC
Cell -254-***-****
4.Habib Ullah
Technical Manager
Avanzar Interior Technologies
Phone:210-***-****
Email:*******@*****.***
5.Dawood Karim David
Assistant General Manager
Royal Cement Limited
Phone:+880 181-***-****
Email:***********@*****.***
6.Rukon Uddin Faruq
General Manager (Plant)
Royal Cement Ltd.
Phone:+880-****-*** 061
Email:*********@*****.***