Post Job Free
Sign in

Electrical Lead Wind Projects & Transmission Systems

Location:
Gadag, Karnataka, India
Posted:
April 03, 2026

Contact this candidate

Resume:

SHARAD KUMAR PATHAK

Assistant Manager

+91-971******* **************@*****.*** Gadag, Karnataka INDIA Experience: 11+ Years https://www.linkedin.com/notifications/

Profile summary

Assistant Manager – Wind Projects Electrical Transmission line & Substation: Highly experienced Assistant manager with 11+ years of expertise in electrical engineering, currently working at ReNew Power. Specialized in wind energy projects, with a proven track record of managing transmission lines, substations, and renewable energy infrastructure. Skilled in leading cross-functional teams, ensuring safe and quality project execution, and delivering projects on time and within budget. Strong background in project management, commissioning, and operations support with focus on efficiency, reliability, and compliance. Core Skills & Expertise

Renewable Energy

Electrical Transmission Lines (33kV–220kV)

Unit Substations (USS / Pooling Stations)

Project Planning & Execution

Commissioning & Testing (Transformers, VCBs, Protection Systems)

Quality & Safety Compliance

Team Leadership & Contractor Management

SCADA & Grid Connectivity

Production & Manufacturing Engineering (Early Career) Key Strengths

Proven ability to manage end-to-end electrical scope in wind power projects.

Skilled in resolving on-site technical challenges, ROW issues, and coordinating with contractors, OEMs, and utilities.

Strong reporting & documentation experience (DPRs, MIS, as-built drawings).

Expertise in ensuring regulatory compliance (CEA, CEIG, STU/DISCOM).

Adept at balancing technical depth with project leadership. ReNew Power Sep 2023 - Present

Assistant Manager July 2025 – Present

Project: 300 MW wind project Kurdagi,Gadag Karnataka

Execution activities of Projects including Transmission line and USS erection, installation, testing, and commissioning of high voltage equipment such as transformers, circuit breakers, isolators and protection systems.

Plan, schedule, and coordinate site resources, manpower, and subcontractors to achieve project milestones and deadlines.

Ensure compliance with electrical standards, safety norms, and quality procedures throughout the Electrical execution.

Coordinated with ROW teams, Monitor daily progress, and conduct site inspections, and prepare progress reports for project management.

HOTO preparation inspection & Punch point’s closer.HOTO planning for inspection & documentation.

To carry out wind farms & substation audits as per laid guidelines & procedures.

SCADA connectivity issues resolution and execution. Senior Engineer Sep 2023 - Jun 2025

Project: 300 MW wind project Kurdagi Gadag Karnataka

Plan, design, and oversee construction of transmission lines for power evacuation from wind turbines to pooling substations. Review and approve engineering drawings, sag-tension charts, tower schedules, and stringing plans.

Supervise foundation, erection, stringing, and earthing activities ensuring compliance with safety & quality standards. Ensure right-of-way (ROW) clearances, statutory approvals, and environmental compliance. Conduct inspections and testing of transmission line materials (conductors, insulators, hardware).

Coordinate with contractors, vendors, and QA/QC teams to close NCRs and punch points. Perform line charging readiness checks and support commissioning activities.

Oversee installation of transformers, VCBs, CT/PTs, isolators, surge arrestors, and busbar systems. Ensure proper cable laying, termination, and control wiring as per approved drawings. Supervise installation of SCADA/communication systems for real-time monitoring. Conduct pre-commissioning tests: insulation resistance, ratio tests, SFRA, TTR, contact resistance, relay testing. Monitor oil filtration, earthing system, and fire protection systems.

Conduct joint inspections with QA/QC and client representatives.

Ensure compliance with safety standards (work-at-height, electrical isolation, PTW).

Prepare DPR (Daily Progress Report) and submit weekly/monthly MIS to management.

Resolve technical issues with design consultants, OEMs, and field teams.

Support statutory inspections (CEA, CEIG, DISCOM, STU). Conduct final inspection and punch list clearance. Prepare as-built drawings and documentation for handover. Senior Engineer – Dilip Buildcon Ltd. Aug 2022 - Sep 2023 Project: Bangalore to Chennai Expressway Road Project (BCE -1 & 2)

My job Responsibilities is Maintained Power supply of HM,WMM,RMC,Camp & Crasher plant, Utility Shifting

(11,33,220 KV line), Billing & HT/LT Connection.

Manage team of electrical contractor & Electricians.

Shift of Transmission line 11, 33 & 400kv line PGCIL.

Underground highways crossing.

Plant supply maintenance & supply maintain as per requirement of RMC, WMM, and HM or Crusher Plants.

Utility Shifting & HT connection manage As per site Engineer – Kshema Power Feb 2021 - Aug 2022

Project: 326.7 MW Pritam Nagar Wind Energy M.P. India.

Work as an Electrical Engineer of PSS, WTG,33 Kv & EHV Transmission line, Solar & Wind Energy & HOTO work..

Erection of 33kv, 220 kv & sub-station.

PSS Erection and testing of CT, PT, CB, LA & Transformer.

HOTO preparation inspection & Punch point’s closer.HOTO planning for inspection & documentation.

Preparation & documenting of Material inspection reports.

To carry out wind farms & substation audits as per laid guidelines & procedures.

To ensure calibration & validation of measuring instruments, equipment’s, tools, jigs & fixtures, lifting devices etc.

Inspection of Site raw material and site work (foundation, Stringing & tower erection) etc.

To ensure availability of latest QC documents & maintenance of quality records.

Submitted all tested documents to the client on a daily basis as per the inspection test plan (ITP) for WCC (Work Completion Certificate) approval.

Engineer – Global heavy engineering industries Bhopal Aug 2015 - Jan 2021

Worked as Execution & Quality Engineer in fabrication & heavy engineering projects.

Ensured compliance with quality standards, material inspections, and documentation.

Submitted all tested documents to the client on a daily basis as per the inspection test plan (ITP) for WCC (Work Completion Certificate) approval.

Engineer – Satyam (fab) industries Pvt Ltd. Nov 2013 - Jul 2015

Handled production & quality control in manufacturing engineering.

Supervised fabrication, inspection, and production planning activities. Engineer – Ms Shyam Indus power solution Jun 2013 - Oct 2013

Work as engineer 11 & 33kv line maintence and 33kv substation (out and indoor) execution. Projects

Wind Project

Led the development and implementation of a 300.3 MW Wind Project in Gadag, Karnataka.

Managed project budget and timelines to ensure successful completion.

Coordinated with cross-functional teams to streamline project operations and optimize efficiency.

Achieved 98% capacity utilization, surpassing industry standards. Banglore Chennai Expressway

BCE-01 & 02 : Shifting of utility transmission line and Execution of urban lights 325 MW wind Project

Commission of 326.7 MW wind Project

Education

Sl no Degree Institution / Board Year Marks

1 B.E. Electrical

Rajiv Gandhi Proudyogiki Vishwavidyalaya (RGPV), Bhopal 2013 73 % 2 12th BSEB PATNA 2008 56 %

3 10th, BSEB PATNA 2006 60%

Date: Sharad Kumar Pathak



Contact this candidate