Post Job Free
Sign in

QC Inspector Mechanical Welding/NDT Expert with 20+ Years Experience

Location:
Banda Aceh, Aceh, Indonesia
Posted:
March 29, 2026

Contact this candidate

Resume:

Curriculum Vitae

Erwandi, ST. Page * of *

Name : ERWANDI, S.T

Place/Date of Birth : Banda Aceh / September 16th,1968 Nationality : Indonesian

Profession : Welding/Structural/Piping and Mechanical Inspector Pass Port No : E 0841279 Exp. Date October 6, 2027 Phone : +(62-852-****-**** and +(62-852*-***-**** E – Mail : *************@*****.**.**

Background : Mechanical Engineer – Syiah Kuala University, Indonesia Availability : ASAP

Summary Experiences

Experienced Welding, Structural, Piping, and Mechanical/Valves Inspector: with over 20 years of professional experience in the oil & gas, petrochemical, and power generation industries. Proven expertise in inspection and quality assurance of fabrication, erection, and installation activities in accordance with international codes and standards (ASME, API, AWS, ISO).Extensive hands-on experience with a wide range of metallic materials, including carbon steel, stainless steels (304, 316), duplex and super duplex stainless steels, Hastelloy, copper-nickel (Cu-Ni), Inconel 625 and CRA (Corrosion Resistant Alloy) pipeline and welding, with a deep understanding of corrosion control, welding procedures, and proper handling of dissimilar metals. Major Involve are in heavy steel structures, fabrication and construction of oil and gas plant and other industrial component an accessory (Piping Spool, Vessel, Fuel Gas Filter Separator, Fuel Gas Super-Heater, Air Cooler Condenser Packed, Super Structure Jetty Head, Marine Operation Structure, Expansion Looping Structure, Mooring and Berthing Dolphin structure, Road Way Structure, Superstructure Loading Platform).

Experience in GRE (Glass Reinforced Epoxy) piping inspection, including material verification, adhesive joint preparation, curing control, Barcol hardness testing, hydrostatic testing, and compliance with ISO 14692. Skilled in monitoring adhesive bonded, butt & wrap, mechanical coupling, and flanged joint installations, ensuring proper curing, alignment, and QA/QC documentation in GRE piping systems. Skilled in reviewing WPS/PQR, conducting visual inspections

(VT), and coordinating NDT activities (PT, MT, RT, UT). Adept in verifying material traceability, heat numbers, and ensuring compliance with project specifications and QA/QC documentation requirements. Known for a detail-oriented approach, high standards of safety, and strong coordination with multidisciplinary teams across EPC and construction phases. Education/Qualification

Bachelor degree Mechanical Engineer

CSWIP 3.2 Senior Welding Inspector (Attended)

CSWIP 3.1 Welding Inspector (Certificate No. 333706/02, Expired date March 26th 2028)

Welding Inspector (B4T) Bandung, Certificate No.0403.12.49.1103.

PCN Level II Radiographic Interpreter, Certificate Number: T014S3622774

ASNT SNT-TC 1A level II Radiographic Interpreter (Certificate No.0004365/RI/SLV/IX/23, Expire date October 04th, 2028)

ASNT SNT-TC 1A level II Ultrasonic Testing (Certificate No: UT-R21137, Expire date December 09th 2026)

ASNT SNT-TC 1A Level II Magnetic Particle Testing (Certificate No: MT-R21167, Expire date December 12th 2026)

ASNT SNT-TC 1A Level ii Liquid Penetrant Testing (Certificate No: PT-R21167, Expire date December 12th 2026)

Blasting and Painting Inspection (In-House Training) Conducted by Mujianto Ali (NACE Level III #6858)

Pipe Stress Analysis (Caesar II) held by ApGreid Oil & Gas Training (Augustus 9th-31st 2008).

Standun Body Maker and Schneider Filter, Issue by Jeddah Beverage Can Making Co Ltd (October 2001) Curriculum Vitae

Erwandi, ST. Page 2 of 7

Safety Training

BOSIET (OPITO) – M&O Indonesia, Vantage No : 1082080, Certificate No. 000 101 402, Expiry date November 26th 2014.

OHSAS 18001 Internal Auditor: 2007 - TUV Rheinland, Cert. No. 130*******/15

Fundamental Safe Work Practice - Tripatra Fluor Consortium (November 2008)

HES Orientation - Tripatra Fluor Consortium (November 2008) Professional Experience

Petrosea (15 March 2024 to 14 April 2025)

Project : Manyar Maju Refinery

Location : Gresik, Est Jave-Indonesia

Designation : Mechanical/Welding Inspector

Job Description :

Performed Inspection incoming Material FRP Tank and Metal Tank and Pump, monitoring Inspection Padding elevation, installation PE Membrane. Witness Inspection Nozzle Orientation and Plumpness of Tank Inspect Pump Installation involved of: Padding Elevation, Center Line, Leveling, Sott Foot, Pre-or Alignment, grouting and Final Alignment. Conducted Inspection Static Equipment Installation such as for padding Elevation, Center Line, Nozzle Orientation, Plumpness and grouting foundation. Review WPS, Welder Certificate, perform fit/up and visual welding for Cooling Tower Piping.

Worley S.E.A (PMC) (02 July 2020 to 30 November 2022) Project : Refinery Development Master Plant (RDMP) Pertamina RU-V Location : Balikpapan, East Kalimantan

Designation : Stationary Equipment/Welding Inspector Job Description :

Witness Welder Test, Review WPS, Inspection Pipe Material. Performed welding activity following of fit/up- visual welding vertical/horizontal shell plate, peaking and banding, bottom leak test of Tank. For piping scope inspection as following fit/up and visual welding of Convection Fire Heater, 1 first Regenerator to 2nd Regenerator. Inspection performed for structural involved of dimensional, check plumpness for stack Boiler, platform and HRSG. Monitoring activity of Bolt and tensioning include of anchored bolt. Inspection Padding Elevation, Center Line and Grouting for equipment package as follows of: Fire Heater, Stripper, Splitter, Column, Exchanger, Air Fan Cooler, Regenerator and Perform inspection Internal Tray of Column. Witness Hydrostatic Test Vessel online, Witness Hydrostatic Test and Function Test Control Valve Perform PMI (Thermo Niton XL3t GOLDD as per API RP 578) and Hardness Test. For Rotating Equipment :

Check Elevation padding plate, Center Line and Levelness, Grouting foundation of Equipment Package, Witness Pre-Alignment Pump Surveillance Preservation Equipment, Monitor Nitrogen Pressure, Check Clearance Gas Turbine Diffuser Inspection, Witness FAT Centrifugal Pump online Issue PMAR (Positive Monitoring Action Report), Issue NCR. Review Document at ACONEX.

Curriculum Vitae

Erwandi, ST. Page 3 of 7

CSTS (Chiyoda/Saipem/Tripatra/SAE) 11 February 2019 to 21 October 2019 Project : British Petroleum Tangguh Expansion Project Train 3 Location : Teluk Bintuni, West Papua

Designation : Mechanical/Welding Inspector

Job Description :

Inspection Visual and Dimensional of Roof Plate, Bottom Plate, Annular Plate, Top Angle and Shell Plate Tank Inspection of Anchor Bolt (Center Diameter, Projection, Pit to Pit) of Static, Package and Rotating Equipment. (Boiler Stack, F.D Fan Boiler, Acid Gas Absorber, Acid Gas Stripper, Acid Flash Drum, etc.). Inspection Padding Elevation for Static, Packed and Rotating Equipment (Boiler Stack, F.D Fan Boiler, Acid Gas Absorber, Acid Gas Stripper, Acid Flash Drum, etc.), Inspection Verticality / Bolt Tightening Static Equipment (Acid Gas Stripper)

Inspection Assembly and Installation Air Cooler Condenser Package:

• Review WPS, Welder Certificate, Electrode and Welding Machine Certificate.

• Inspection Welding Consumable.

• Inspection Welding Machine Function Test.

• Monitoring Welding Activity, Before, During and after Welding.

• Witness Bolt Tightening Air Cooler Upper Structure and Super Structure

Wartsila 17 December 2015 to 14 October 2016

Project : Kraken FPSO Power Generation Module (Nort Sea) Location : Wasco Yard, Batam

Designation : Sr. QC Inspector

Job Description :

Inspection Pad Eyes, Mono Rail and Over Head Crane, Witness Load Test for Pad Eyes and Monorail. Inspection Exhaust Stack (WHRU, Steam Drum, Bellow, Exhaust Damper, Silencer for Mechanical Completion. Review MDR for Mechanical, Structural. Involved various materials, CS, Duplex / Super Duplex, SS304L and SS316L

Air Energi 06 June 2015 to 30 November 2015

Project : Exxon Mobile Cepu Ltd, EPC 1 Banyu Urip

Location : Cepu, East Java

Designation : Piping and Pipeline Inspector

Job Description :

o Monitoring and witness of fit-up, random check of welding parameters, consumable during welding, visual inspection and dimensional Inspection, Line Check, Witness Hydrostatic Test, Witness PWHT, Review Daily Welding Report and Flange inspection, witnessing PMI using Niton XRF PMI, Fischer Ferritescope, Equotip for Hardness

Involved Carbon Steel, Stainless Steels, Duplex Stainless Steels Piping, and CRA pipeline

Kellogg Join Venture Gorgon (KJVG) 01 November 2013 to 20 December 2013 Project : Chevron Australia-LNG Jetty and Marine Structure (Gorgon Project-Barrow Island) Contraction LNG Jetty- Superstructure Loading Platform East and West Deck, Pontoon 1, 2, 3 at Saipem Indonesia Karimun Branch. Location : Saipem Karimun Yard

Designation : Welding Inspector (Client Rep)

Curriculum Vitae

Erwandi, ST. Page 4 of 7

Job Description :

Monitoring and witness of fit-up, random check of welding parameters, consumable during welding, welding, visual inspection and dimensional Inspection, Witness Hydrotest for fuel line and potable water line. Perform PMI (Thermo Niton XRF analyzers as per API RP 578). Review welder certificate, review fit-up/visual report.

Kellogg Joint Venture Gorgon (KJVG) 18 January 2011 to 30 June 2013 Project : Chevron Australia- LNG Jetty and Marine Structure (Gorgon Project – Barrow Island) Construction Super Structure Jetty Head, Marine Operation Structure, Expansion Looping Structure, Mooring and Berthing Dolphin Structure, Road Way Structure Chevron Australia-LNG Jetty and Marine Structure. Location : PT. Hanjung Yard, Bandar Lampung

Designation : Welding Inspector (Client Rep) – Hanjung Yard Job Description :

Monitoring and witness of fit-up, welding, heating rectification, visual inspection and dimensional Inspection. Random check of welding parameters: consumable Volt, ampere, travel speed inter-pass temperature etc. Witness Welder Test, Witness PQR, Review UT Report, Review MDR

PT. Global Process Systems (GPS) 07 December 2009 to 27 September 2010 Project : Dragon Tortoise Gas Compressor (Booster Compressor Module) Location : Petra Fabricator SDN BHD, S&W Hear Exchanger Pte. Ltd, Pearless Mfg. Designation : Surveillance Inspector

Job Description :

Inspection Inter Stage Cooler, Discharge Cooler, Inlet Scrubber, Inter Stage, Scrubber, Discharge Scrubber, Fuel Gas Filter Separator, Fuel Gas Super-Heater and Piping Bulk Material. Review Vendor Document, including:

• Vendor Procedure

• WPS / PQR, Welder Certificate, I T P, NDE Procedure

• Welding Traceability, Dimensional and NDE Clearance Report

• Certificate (Material, Calibration etc.)

• Review Radiography Film

Witness Dimensional Inspection, Fit Up and Visual Inspection of Weld. Witness Hydrostatic Test, Witness FAT for Inter Stage Cooler and Discharge Cooler. Witness Hydrotest and Fusion Test for Control Valve, Actuator Valve. In charge for Mechanical Completion systems and Review Manufacture Data Record (MDR).

Tripatra Fluor Consortium 01 November 2009 to 01 December 2009 Project : Sumatra Light North (Chevron Field)

Location : Duri, Riau (Chevron Field)

Designation : QC Piping Inspector

Jobs Description :

Review WPQ/PQR & Welder Certificate, Fit Up and Visual Inspection of Welding, Line check Flow Line, Witness Hydrostatic Test, Review Welding Traceability Record

Germanischer Lloyd Nusantara 13 August 2008 to 29 August 2008 Project : Certification and Approval PQR/WPS Air Separator Location : Siemens Indonesia, Cilegon-West Java

Designation : Inspector (Freelancer)

Curriculum Vitae

Erwandi, ST. Page 5 of 7

Job Description :

Witness WPS/PQR, Verification of Material, Review Welder Certificates

Nippon Steel Engineering 01 May 2007 to 31 July 2008 Project : PGN South Sumatra West Java (SSWJ) Pipe Line CP-4 Location : Cilegon, West Java

Designation : QC Engineer

Jobs Description :

Review vendor & subcontractor document, including:

• Quality Plan, WPS/PQR, Welder Certificate

• Certificate (Material, Inspection / test, calibration, etc.)

• Procedure, Datasheet, Drawing, etc.

• Welding Traceability, NDE report.

• Manufacture Data Record (MDR)

Perform Visual, Dimensional, Material, and Panting Inspection Welding Inspection of Piping Installation, Review Radiography Film Witness Hydrostatic Test, Witness FAT and SAT for Metering and Regulating System, Witness SAT for UPS Completion of QA/QC Documentation work for CP – 04

PT. IKPT (Inti Karya Persada Teknik) 01 April 2006 to 30 April 2007 Project : Amerada Hess Onshore Processing Facility and Sales Gas Pipelines Location : Alvacon Valvindo (Valve Manufacturing-Cikande) Designation : QC Inspector (Resident Inspector at PT. Alphacone Valfindo (Valve Manufacture) Jobs Description :

Witness hydrostatic and functional testing of valves, including: Valve Types: Gate, Globe, Ball, Check, Butterfly, Wafer Check, Double Block Valves/Blade Valves (DBB Valve) and Control Valves (as per API 598 & ASME B16.34)

• Hydrotest static tests: Low Pressure, High Pressure, Shell Test, Backseat Test

• Dimensional, Visual, and Primer Coating inspections

• Functional Testing: Hysteresis, Dead Band, FET, Stroking Time, Rated Travel, and Failsafe Operation (including Cryogenic testing)

• Perform final inspections on valve assemblies, covering visual, dimensional, and painting checks prior to delivery.

• Review manufacturing inspection reports, including MTCs, Visual Casting, PMI, NDT, and Actuator Functional Data

• Involved Carbon steel and Stainless Steels materials

PT. IKPT (Inti Karya Persada Teknik) 04 October 2004 to 31 March 2006 Project : Kujang 1B Fertilizer Co. Ltd

Location : Cikampek, West Java

Designation : QC Piping/Mechanical Inspector

Jobs Description :

Welding Inspection on Piping Installation, Witness Welder Performance Test, Review Radiography Film Line checked of Piping Installation, Prepare NDE Clearance for Test Package, Witness Hydrostatic, Pneumatic Test of Piping Installation, Done Post Test of Piping Installation, Witness Center Line of Belt Conveyor Frame, Witness Tightening Bolt for Belt Conveyor Frame, Witness Alignment Motor and Pump Prepared Inspection Document for Turn Over to Client Curriculum Vitae

Erwandi, ST. Page 6 of 7

IKPT (Inti Karya Persada Teknik) 22 June 2004 to 03 October 2004 Project : Sumbagsel Gas Development Project (PPGS) Package II&III Location : South Sumatra

Designation : QC Engineer

Jobs Description :

Review vendor & subcontractor documents, including:

• Quality Plant

• Procedure, Datasheet, Drawing, etc.

Jeddah Beverage Can Making Co. Ltd 01 October 2001 to 01 October 2002 Location : Jeddah, Saudi Arabia

Designation : Maintainer

Job Description :

Body Maker Maintenance (Monthly PM, Quarter PM, Annual PM)

Continental Can of Saudi Arabia Co. Ltd 01 November 1999 to 01 October 2001 Location : Dammam, Saudi Arabia

Designation : Maintainer

Job Description :

Washer Maintenance (Monthly PM, Quarter PM, Annual PM)

PT, Hanjung Korea Heavy Industries 21 April 1997 to 01 May 1997 Project : Expansion Cibinong Cement Plant

Location : Cilengsi, West Java

Designation : Junior Mechanical Engineer

Jobs Description :

Anchor bolts checked for location, elevation,

Alignment of Part of transportation checked, bolt and nuts tightened Checked Driver Installed and Alignment Pump and Motor

PT. Trakindo Utama 04 March 1996 to 03 March 1997 Project : Freeport Mc. Mooran/Kelien Equator Mining Location : Irian / Kalimantan

Designation : Service Analyst Trainee

Exxon Mobile, Lhok Seumawe North Aceh 01 September 1992 to 1 October 1992 Project : On Job Training

Designation : Gas Turbine

Reference:

1. Name : Hery Utomo

Position : QA/QC Manager Petrosea

Email : ****.*****@********.***

Phone Number : +(62) –822********

2. Name : Aaron Tanhueco

Position : Asst, QA/QC Manager

Email : *****.********@******.*** or ***************@*****.*** Phone Number : +(62) – 813-****-****

Curriculum Vitae

Erwandi, ST. Page 7 of 7

3. Name : John Young

Position : Lead QA/QC KJV Gorgon Project

Email : ***@*********.**.**

Phone Number : +(44) (0-780-***-****

4. Name : Kevin Madden

Position : QA/QC Manager Global Process Systems

Email : **************@*******.***

Phone Number : +(62) - 812-****-****

5. Name : Michael Grimley

Position : QA/QC Coordinator Global Process Systems Email : *******.*******@*****.***

Phone Number : + (62) - 813-****-****

6. Name : Katsuya Tanaka

Position : Project Manager Nippon Steel Construction, SSWJ CP – 4 Project Email : ******.*******@***-***.**.**

Phone Number : + (81) – 366-652-608



Contact this candidate