Steve Barron
*** **** ***** ****, ************, TN 38017
*****.*******@*******.***
PH 901-***-****
Superintendent Work History
Goodwin Brothers Maintenance & construction
**** ***’s Wine and Spirits Superintendent May 12 September 6 2017
A woman’s clothing store renovated into the Doc’s Wine & Spirits
Ensured onsite safety and followed all OSHA regulations by doing my rounds interacting with workers and subs.
I cut the blocking and installed it.
We managed the sub-contractors and suppliers.
I kept the site clean and performed final cleanup. Oversaw the entire construction process to ensure the highest level of quality, cost control, and efficiency.
We completed the project within the schedule
C & M Builders’
Superintendent March 2018 - November 1018
2018 Gateway Tire Store - Collierville TN I took over as project Superintendent when the client removed our superintendent.
I kept the site clean. I worked with the subs and suppliers as well as the architect and client
Oversaw the entire construction process to ensure the highest level of quality, cost control, and efficiency
Ensured onsite safety and followed all OSHA regulations by Doing my rounds interacting with workers and subs.
We completed the project within the schedule.
Superintendent
2019 Loves Travel Center Fulwood MS December 2118 - May 2019
, Tire storage addition, metal building addition for tire storage and renovation and renovation to the existing Loves store
I kept the site clean.
Oversaw the entire construction process to ensure the highest level of quality, cost control, and efficiency
Ensured onsite safety and followed all OSHA regulations by Doing my rounds interacting with workers and subs.
I installed the tire rack.
Hang doors, and drill and install door hardware including the exterior door security device
/I installed the toilet accessories
We Completed the project within the schedule.
Superintendent May 2019 – December 2919
Loves Travel center - Tire storage addition, metal building addition for tire storage and renovation and addition renovation and addition to the truck repair shop. In Tomsula MS
I kept the site clean and final cleanup.
I installed the tire rack
Hang doors, and drill and install door hardware including the exterior door security device
Installed blocking and installed the toilet accessories
We managed the sub-contractors and suppliers.
Oversaw the entire construction process to ensure the highest level of quality, cost control, and efficiency.
We completed the project within the schedule.
Superintendent January 2029 - May 2020
2020 Loves Store in Tupelo MS - Addition a 756 square foot addition to the existing store and misc.
renovation to the store Plans added 2 showers and 1 washer and dryer room and a new counter top for the Subway inside the store
I ordered the brick to match the existing building,
The building had a structural deck with a TPO roof, attached to the existing roof.
I installed door and hardware and door security device and I cut the blocking and installed it
We used nails, screws, pneumatic nailing systems, concrete anchors, powder-actuated fasteners, and framing connectors effectively.
We managed the sub-contractors and suppliers. I kept the site clean and performed final cleanup.
Oversaw the entire construction process to ensure the highest level of quality, cost control, and efficiency.
We completed the project within the schedule.
Superintendent
2021 Circle K Store Baton Rouge La Lead Superintendent May 2020 - March 3021
The Slab was installed when I got there, complete store, fuel tanks installed, and fuel pumps installed concrete and asphalt paving I worked with the subs and suppliers to the finish of the project.
Oversaw the entire construction process to ensure the highest level of quality, cost control, and efficiency.
We completed the project within the scheduled time.
‘
March 2021 June 2021
Superintendent Total interior demolition to International Paper office in Memphis. Took a complete structure to the dumpster.
Ensured onsite safety and followed all OSHA regulations
I worked with the guys in the demo. I used a small front-end loader to demo the structure with the guys.
Image 21
Superintendent June 2021 – December 2121
2021 5th floor renovation UT/Methodist Hospital
Complete demolition and renovation of the 5th floor, the rooms remained
I worked with the subs and suppliers. I helped with the demolition crew to take down the structure.
Oversaw the entire construction process to ensure the highest level of quality, cost control, and efficiency
The project was completed within the scheduled
Williams Construction
Superintendent February 2024 - August 2024
Tam Restaurant
We managed the sub-contractors and suppliers.
I kept the site clean and performed final cleanup. Oversaw the entire construction process to ensure the highest leveled quality, cost control, and efficiency.
We completed the project within the schedule
2024 NACFAC Memphis Navel Service B551 Ecpansion Joints
Superintendent September 2024 - December 2024
QCQ Certificatio
Safety Certification
A & B Construction Current
Superintendent January 2025 - May 2025
Dunbar Elem. School
Renovation of existing School
New Windows and Mechanical Work