Post Job Free
Sign in

Senior Electrical Engineer & Project Management Leader

Location:
Brampton, ON, Canada
Posted:
March 14, 2026

Contact this candidate

Resume:

*

Resume

*. Objective: Senior Project Manager / Senior Engineering Manager / Senior Electrical

Projects Engineer / Engineering Advisor

2. Personnel Data

Name: Riyad Tabieh, MSc, P. Eng.

Gender: Male

Nationality: Canadian Citizen

Address: 2 Kirkpatrick Street

Brampton, Ontario

L6Z 4J9 Canada

Home Telephone: +1-905-***-**** (cellphone +1-647-***-****) E-mail: *******@*******.***

3. Summary of Work Experience

Over 40 years of extensive experience across all facets of engineering within the Petrochemical and Oil & Gas industries, including power generation, gas and processing plants, facilities, and utilities (HV substations, transmission lines, and distribution systems). Experience is fully aligned with International and North American engineering codes, practices, and standards, spanning the entire project lifecycle— from conceptual studies and FEED through detailed engineering and design, procurement, construction, commissioning, and testing of new and upgraded facilities. In the project engineering domain, responsibilities have included project and plant management; project planning and execution; capital and operating budgeting; scheduling, cost control, and scope definition; interface management between project stakeholders and disciplines; ensuring contractor and supplier compliance with contractual obligations; project team leadership; client relations; and efficient handover to operations. Additional responsibilities included project administration, bid package preparation, procurement, meetings and reporting, construction oversight, contractor supervision, and close coordination with multidisciplinary topsides engineering teams (Process, Mechanical, Instrumentation & Control, Civil, and Corrosion). Extensive experience using ETAP and SKM software for power system studies, equipment sizing, and electrical calculations. In the engineering and design field, responsibilities included the development of detailed engineering designs and all related activities such as engineering calculations, technical specifications (including power transformers, switchgear, MCCs, generators, protection relay panels, electrical buildings, cables, CTs and VTs, surge arresters, reactors, HV line towers, substation equipment, UPS and DC systems), preparation of procurement packages, and power and control drawings. Experience also includes the design of pumping stations, transmission lines, substations, and power generation plants utilizing GE Frame 5 dual-fuel gas turbines, Siemens SGT-700 gas turbines, and Solar SMT-60 mobile gas turbines, along with associated balance-of-plant (BoP) equipment and control systems. In the maintenance field, responsibilities included plant expansion and upgrades, supervision of installations, procurement and inventory control, failure analysis and corrective action development, implementation of computerized preventive and corrective maintenance programs, participation in HAZOP studies and reviews, tender evaluations, executive reporting, cost control, and initiatives to improve plant reliability.

Well-versed in applicable standards and codes, including CSA, OHSA, Ontario Regulation 22/04, NEC, NESC, IEEE, ANSI, NFPA, NEMA, API, BS, and IEC.

2

4. Skills

• Proven ability to manage capital projects valued up to USD 1 billion, from initiation through successful completion, including gas-fired power plants, HV/MV substations, HV/MV transmission lines, and electrical distribution systems.

• Extensive experience in the design, specification, procurement, and construction of electrical projects, including gas power plants; HV/MV substations; switchgear; MCCs; VFDs; power and instrument transformers; transmission lines; grounding systems; DC systems and UPS; generators; electrical buildings; instrumentation; fire detection and alarm systems; E-houses; lighting systems; and raceway systems (cable trays, ducts, and cables). Experience across voltage levels 138 kV, 34.5 kV, 13.8 kV, 4.16 kV, and 480 V.

• Strong mastery of electrical engineering principles and theories with proven practical application in complex industrial environments.

• Solid experience in gas power plant projects utilizing GE Frame 5 and Siemens SGT-700 gas turbines, including detailed engineering, preparation of RFQs and MRs, and review and approval of vendor documents and drawings.

• Extensive EPC experience in the construction of gas plants incorporating high-pressure and low- pressure gas compressors.

• Significant experience in developing contract documents and managing contracts and commercial agreements.

• Hands-on experience managing and executing EPC and FEED major projects.

• In-depth knowledge of modern electrical equipment, control theory and control systems, hazardous area equipment, safety systems, vendor management, and FAT participation.

• Strong working knowledge of electrical, instrumentation, and mechanical equipment and integrated packages.

• Broad experience in HV and MV substations, transmission lines, motor control systems, and associated auxiliaries.

• Highly analytical and intellectually capable, with the ability to apply theory effectively in practical, real-world scenarios.

• Expert in preparing tender packages and purchasing requisitions for EPC, procurement, and services, including development of scopes of work/supply, technical specifications, data sheets, and technical and commercial terms.

• Demonstrated ability to work independently and lead multidisciplinary teams of engineers and technicians.

• Strong organizational, communication, and technical documentation skills.

• Proven leadership in promoting and exemplifying company core values and ethics.

• Professional demeanor with strong interpersonal and teamwork skills; enthusiastic, conscientious, adaptable, and results-driven.

• Experienced in developing and delivering technical and management presentations. 5. Education

1976 - 1981 Master of Science in Electrical Engineering obtained with honours Specialization: Electrical Power Systems and Networks June 2001 Project Management & Planning

6. Professional Associations

• Professional Engineer (P.Eng.) – Registered in the Province of Ontario, Canada Professional Engineers Ontario (PEO), Member #100059199 – Active Member 3

7. Training Courses & Professional Development

• Production & Operation Management – July 24 to August 8, 1989

• Cathodic Protection – October 17 to 20, 1988

• Master of Construction Industry Procedure – March 27 to April 2, 1988 (Westinghouse Corporation)

• Computer Skills Training – DBase, BASIC, Quattro Pro, WordPerfect, Lotus 1-2-3, Windows, Excel, Microsoft Word, PowerPoint, and other software applications

• Microprocessors & Microcontrollers – August 1 to 19, 1992

• Communication Skills – September 11 to 15, 1988

g. Supervision skills 20-25 Oct., 1990

8. Professional Work History

8.1 February 2021 to January 2026

Employer : Wazen Oil Services - Seconded to Waha Oil Company (WOC), Tripoli, Libya

(40% of WOC shares belong to Conco Philips, USA and Total Energy, France) Titke: Senior Project Engineer

Duties:

Managed and provided technical leadership for major capital projects, including the procurement and installation of six (6) Siemens SGT-700 gas turbines (33 MW ISO each), complete with all balance-of-plant (BoP) and mechanical systems required to supply gas from source to turbine. Scope included knock-out drums, gas heaters, piping systems, and all associated electrical systems and infrastructure to connect the units to 138 kV substations, including 13.8/138 kV power transformers, 138 kV circuit breakers and disconnect switches, potential transformers, lightning arresters, steel lattice structures, grounding systems, DC systems, and related auxiliary equipment.

Led capital projects from initiation through commissioning for the procurement and installation of Solar SMT-60 mobile gas turbines (USA), including full EPC coordination.

Managed the design, procurement, and installation of a 138 kV transmission line from Gialo Field to the new Concession 6J area, including all associated civil, mechanical, and electrical works.

Led a major upgrade project to replace 4.16 kV switchgear and a 13.8 kV power transformer to energize and operate mainline pumps at Gialo, including raceway systems and cabling, DC systems, grounding, lighting, relay protection systems, and related auxiliary works.

Performed additional engineering and project management activities as directed by Engineering Management.

8.2 June 1st, 2019 To October 28, 2020

Employer: Waha Oil Company, Tripoli, Libya / Marathon Oil /Conco Philips

(Libyan-American Oil & GAS Production Company)

Company website: www.wahaoil.net

This company is engaged in the production of crude oil & gas. production is about 450, 000 Barrel of Oil A Day.

Marathon Oil, USA & Conco-Philips, USA own 48% of the company shares. Title: Engineering Advisor

Duties:

4

Served as Advisor and Technical Authority to the Engineering Department, acting as the company’s Subject Matter Expert (SME) in electrical engineering.

Performed the role of Engineering and Project Manager for all in-house and contractor-executed projects.

Led key greenfield and brownfield projects requiring electrical engineering oversight, including defining objectives, managing scope, schedule, cost, risks, resources, consultants, and achieving project goals.

Ensured all projects were fully integrated with business operations and that regional, site, and functional interests were appropriately represented.

Reviewed existing corporate policies, standards, and specifications related to electrical engineering; authored new documents where required and communicated updates across all sites.

Identified the need for company-wide standards, procedures, and policies, ensuring compliance with applicable industry codes and professional regulations.

Collaborated closely with cross-functional teams and influenced senior management decisions impacting business direction, often without direct authority.

Provided technical support to the Supply Chain team during procurement of electrical and instrumentation & control (I&C) packages.

Prepared business cases, capital cost estimates, and technical reports; presented recommendations and project status updates to executive management.

Coordinated and oversaw construction, commissioning, and handover of electrical projects.

Monitored industry developments and emerging technologies in electrical engineering; introduced new tools and methodologies and made recommendations to executive management.

Directed and managed electrical engineers reporting to the role, including setting performance objectives, monitoring performance, and developing team capabilities aligned with financial and operational strategies.

As Engineering Manager, coordinated and directed work across all engineering disciplines, serving as the primary interface with external engineering consultants.

Managed multidisciplinary interfaces, including power system connections; DCS, SCADA, and PLC automation systems; mechanical power demand and feed points; civil foundations and structures; and HSE requirements.

Reviewed and approved contractor deliverables for compliance with specifications and standards, including drawings, calculations, and equipment sizing.

Reviewed and approved engineering design drawings with respect to accuracy, constructability, reliability, interfaces, and compliance with applicable codes and standards.

Organized and participated in HSE and safety meetings to ensure safe execution of engineering and construction activities.

Maintained and updated company specifications and data sheets to incorporate latest market technologies and best practices.

Developed and justified proposals for new projects to improve system reliability and production, including preparation of Statements of Requirements (SOR) and Authorizations for Expenditure (AFE).

Planned resources, reviewed schedules, and managed team workload to meet project and operational objectives.

Conducted performance evaluations and appraisals, recommending training and professional development where appropriate.

Built strong working relationships with internal stakeholders across all departments.

Developed cost estimates; prepared, monitored, and controlled project budgets and expenditures.

Produced conceptual engineering documents such as single-line diagrams, layout drawings, and project initiation documents.

Performed detailed engineering and generated complete engineering documentation packages.

Conducted regular coordination meetings with departmental staff and senior management to review progress, budgets, and plans.

Developed and delivered technical and executive-level presentations as required. 5

8.3 Dec 20, 2011 to May 30, 2019

Employer: Waha Oil Company, Tripoli, Libya / Marathon Oil /Conco Philips

(Libyan-American Oil & GAS Production Company)

Company website: www.wahaoil.net

This company is engaged in the production of crude oil & gas. Annual production is about 450, 000 Barrel of Oil A Day.

Marathon Oil, USA & Conco-Philips, USA own 48% of the company shares. Title: Senior Staff Project Engineer

Duties:

Managed and controlled major capital projects, including HV substations, HV transmission lines, MV and distribution networks, process plants, and gas turbine power plants.

Managed interfaces among all project stakeholders and engineering disciplines, including Electrical, Automation, Communications, Mechanical, and Civil.

Led, trained, and supervised teams of engineers, designers, and construction personnel.

Managed and administered key project contract terms and conditions.

Participated in FEED for major capital projects.

Developed cost estimates and managed project budgets and expenditures.

Provided technical support to operations and maintenance teams.

Analyzed operational issues and developed technical reports recommending solutions to improve system reliability and performance.

Managed scope, schedule, and budget for multiple concurrent projects.

Conducted regular performance reviews and provided structured feedback to engineering staff.

Led and mentored engineering teams; implemented training plans and development programs to enhance technical capability.

Analyzed complex technical challenges and provided practical, effective recommendations.

Developed bid packages for the addition of GE Frame 5 gas turbine-generator sets (~30 MVA), including all auxiliaries and associated electrical systems such as 138 kV substations, 13.8 kV and 480 V switchgear, 125 V DC systems, and protection relay systems.

As Lead Engineer, provided day-to-day technical supervision and direction of assigned engineering activities.

Developed and reviewed engineering designs, including equipment sizing, cable and raceway design, transformer selection, DC systems, preparation of drawings, and technical specifications.

Led procurement activities including bills of materials, material requisitions, technical and commercial bid evaluations, vendor selection, purchase orders, expediting, and documentation control.

Prepared project cost estimates, man-hour forecasts, and resource plans.

Led multidisciplinary teams including engineers, drafters, and construction staff.

Organized and participated in HSE and safety meetings.

Supervised testing and commissioning activities.

Performed power system studies and analyses using SKM and ETAP software 8.4 April 11, 2011 to Dec 18, 2011

Employer: SNC-Lavalin T&D, Toronto, ON, Canada

Title: Principal Electrical Engineer

(HV Substations & Transmission Lines)

Duties:

6

Developed EPC bid packages for the engineering, supply, installation, testing, and commissioning of a mobile substation rated 120/36/13.2 kV with 50 MVA power transformers.

Developed EPC bid packages for the engineering, supply, installation, testing, and commissioning of a 35 kV mobile GIS switching station.

Performed conceptual design and engineering for HV substations.

Conducted detailed engineering calculations to verify that conductors and support structures could withstand short-circuit dynamic forces at 138/35 kV outdoor substations.

Performed technical evaluation of EPC bids for HV substation projects.

Reviewed and approved engineering deliverables, including single-line diagrams (SLDs), substation layouts, plans and sections, protection and relay schematics, SCADA drawings, grounding systems, raceway systems, panel schedules, and cable schedules.

Developed conceptual engineering and single-line diagrams for 230 kV and 115 kV substations with various configurations and 250 MVA power transformers, as part of feasibility and cost estimation studies to supply power to Northern Ontario and remote areas.

Provided technical guidance and mentoring to senior and junior engineers, designers, and technical staff.

Developed technical specifications for 230 kV GIS substations.

Participated in client and business development meetings to promote company capabilities in EPC engineering and construction of HV substations, supporting the acquisition of new and repeat EPC contracts.

Prepared cost estimates for EPC projects involving HV substations and transmission lines, including cash flow curves and detailed budget forecasts.

Developed and submitted technical and commercial proposals to clients.

Prepared detailed project and engineering reports 8.5 April 2008 to February 2011

Employer: Waha Oil Company, Tripoli, Libya / Marathon Oil /Philips Conco This company is engaged in the production of crude oil & gas. Annual production is about 450, 000 Barrel of oil a day.

Marathon Oil, USA & Philips-Conco, USA own 48% of the company shares. Title: Senior Staff Project Engineer, Electrical

Duties:

Acted as the primary interface and focal point for projects and modification activities involving HV substations, transmission lines, and MV/LV distribution systems.

Supervised all aspects of project engineering scopes to ensure operational, technical, safety, quality, and design requirements were met.

Supported project teams throughout the detailed engineering, construction, and commissioning phases.

Managed allocated project and modification budgets.

Participated in FEED for major capital projects.

Interpreted scope of work requirements, identified potential issues, and developed practical solutions.

Administered work packages in accordance with document control and management procedures.

Contributed to the continuous improvement of project and modification processes and procedures.

Ensured safe delivery of projects and modifications in full compliance with organizational HSE and Quality policies and procedures.

Managed and coordinated contractors, subcontractors, and service providers.

Ensured all electrical works met project safety, environmental, operational, quality, cost, design, and schedule objectives.

7

Identified and assessed deviations from Contract Technical Specifications and regulatory requirements, ensured proper processing in accordance with project procedures, and maintained the Deviation Control Log.

Managed electrical engineering queries and technical information requests from contractors and subcontractors.

Prepared and maintained project reports, records, and protocols.

Ensured all changes to project scope were properly documented, justified, and approved.

Planned, organized, and coordinated the development of project documents, drawings, and specifications.

Reported regularly to management on project progress, deviations, risks, and execution issues.

Organized and chaired regular coordination meetings with project teams and contractor representatives to review progress, resources, and deliverables.

Participated in kick-off meetings with EPC contractors and project management teams for major projects.

8.6 April 2005 to January 2008

Employer: Teknica Petroleum Services – Calgary, Canada Title: Senior Project Engineer

Duties:

Planning, execution and management of the following projects and activities:

Led the replacement of existing 4.16 kV switchgear and 4.16 kV MCCs for oil mainline pumps, along with 480 V MCC replacement and complete re-cabling, at Station LA-4 (North Waha Field) and Station LA-7 (Samah Field).

Executed full procurement activities, including preparation of tender documents, technical and commercial bid evaluations, issuance of purchase orders, contract award, and contract administration.

Managed the replacement of 4.16 kV switchgear and motor starters for mainline pumps, 480 V MCC replacement, and re-cabling at North Waha Gas Station and North Defa Gas Station, both comprising HP and LP gas compressor facilities.

Performed end-to-end procurement activities, including tender preparation, evaluation of offers, purchase orders, contract award, and administration.

Led the replacement of 4.16 kV switchgear and 4.16 kV MCCs for oil mainline pumps and water flood pumps at Gialo Station (Gialo Field), including full re-cabling works.

Developed engineering calculations, technical specifications, and drawings, and managed procurement activities through contract award and administration.

Managed the replacement of 480 V MCCs for slug catcher facilities at Slug Catcher Station, Waha Field, including re-cabling works.

Developed engineering calculations, specifications, and drawings, and executed procurement activities including bid evaluations and contract administration.

Planned, managed, and controlled project budgets, including cost estimation, preparation of Statements of Requirements (SORs) and Authorizations for Expenditure (AFEs). Maintained purchase order logs, prepared progress reports, organized regular coordination meetings with contractors, provided technical and administrative support to construction teams, and presented technical and financial project status to executive management and representatives of the National Oil Corporation.

For strategic and mega projects, responsibilities included:

Defining project strategy and organization structure

Managing interfaces among all project stakeholders and disciplines

Planning and managing resources and project teams 8

Establishing and maintaining reporting systems, including progress reports, executive reports, presentations, logs, and formal correspondence

Ensuring contractors and suppliers fulfilled contractual and technical commitments

Managing project budgets, cost control, and variance reporting

Providing technical and managerial support during construction

• Participating in testing and commissioning activities 8.7 Jan. 2002 to January 2005

Employer: AMEC Services Company

Title: Senior Electrical Project Engineer

Responsibilities:

Performed project engineering for the replacement of turbine-generator units and related power plant equipment at Gialo Field, including renovation of 138 kV substation equipment, power transformers, 13.8 kV & 4.16 kV switchgears, 480 V MCCs, and distribution systems.

This major expansion increased generation capacity by approximately 40%, with equipment including a 26 MW turbine-generator, 138 kV substation equipment, 13.8 kV switchgear, control panels, and all auxiliary systems.

Developed engineering designs and technical specifications for the upgrade and revamp of 13.8 kV power plant systems at Waha Field, including new switchgear, power transformers, protection systems, buildings, raceway systems, cabling, and DC systems.

Performed engineering calculations, specifications, and drawings for the replacement of 4.16 kV switchgear and motor starters for mainline pumps, 480 V MCCs, and re-cabling at Gattar Station.

Executed procurement activities for all projects, including preparation of tender documents, technical and commercial evaluation of bids, purchase orders, contract awarding, and contract administration.

Carried out engineering and procurement works for the electrification of new oil wells, including 34.5 kV transmission line design and installation.

Coordinated construction activities with other engineering disciplines at Faregh Field for new gas field installations.

Developed project organization charts and related documentation to support project management.

Ensured contractors and suppliers fulfilled technical, commercial, and contractual obligations.

Managed interfaces between all project parties to ensure seamless execution.

Implemented efficient handover procedures with operations teams to ensure smooth transition of completed projects.

8.8 June, 2000 to September, 2001

Employer: Technical Services Bureau Co. / Contracting Division, Jordan This company is dealing with contracts and projects. These contracts and projects include engineering, supply, construction and maintenance of LPG plants, water wells, water pumping stations, water treatment plants, chloronation systems ….etc. This includes the usage of latest technology in automation and telemetry systems such as PLCs, DCS, SCADA system, wireless control and supervisory systems.

Title: Projects Manager

Responsibilities:

9

Managed and directed operations and production across multiple plants, including pumping stations, potash production facilities, water treatment plants, and power plants.

Oversaw project management from planning through execution, ensuring delivery on scope, schedule, and budget.

Managed interfaces between all project parties and engineering disciplines, including Electrical, Mechanical, and Civil.

Established and led project teams, providing direction, mentoring, and performance oversight.

Ensured subcontractors and suppliers fulfilled technical, commercial, and contractual obligations.

Promoted and represented projects to clients, stakeholders, and management.

Directed and supervised engineering design activities, including preparation of drawings and equipment specifications.

Evaluated quotations and bid packages for technical and commercial compliance.

Managed plant and project costs, including electrical, mechanical, and civil works, ensuring adherence to budgets and expense controls.

Planned and developed tender packages for procurement and contracting.

Implemented computerized maintenance programs (preventive and predictive) using the company ERP system.

Led teams in preparing bills of materials, material requisitions, bid evaluations, and purchase order issuance.

Negotiated contract terms and agreements and supervised project execution to ensure compliance and timely delivery.

Represented the company in meetings with consultants, government authorities, and contractors.

Ensured safety compliance on construction sites, organized regular safety meetings, and promoted proper handling of hazardous situations.

8.9 Oct., 93 to Nov., 99, Waha Oil Company (Oasis Oil Company), Libya This company is engaged in the production of crude oil & gas. Annual production is about 450, 000 Barrel of oil a day.

Title: Senior Electrical Engineer (Engineering Specialist) Engineering Dept./Technical Services Div./Elec. Section Duties:

Electrical Engineering & Design Lead – Major Oil & Gas Company

• Responsible for electrical engineering, design, and upgrade activities for power generation, transmission, and distribution facilities supporting a major oil-producing and pipeline company.

• Managed a system comprising 16 gas turbine power plants, ~600 miles of 138 kV transmission lines interconnecting 4 major and ~15 smaller substations across the Sirte Desert, and numerous 34.5 kV substations supplying power to ~600 downhole pumps via ~800 miles of distribution lines.

• Led preliminary and detailed engineering, design, and commissioning of major upgrades for 138 kV & 34.5 kV substations, distribution systems, and 26 MW generation plants.

• Developed comprehensive procurement documentation, including equipment specifications for turbines, power & instrument transformers, breakers, switchgear, protection schemes, panels, structures, and auxiliary systems.

• Organized, supervised, and monitored construction activities, ensuring compliance with safety, quality, schedule, and budget requirements.

• Maintained detailed project documentation, including engineering and construction progress reports, project schedules, and monitoring records. 10

• Expedited procurement packages through a London-based purchasing office, including development of scope packages and electrical design guidelines to allow offshore engineering companies to tender and perform detailed design of a new major production station ($300 million project) and multiple station expansions. Reviewed and approved all offshore engineering deliverables.

• Developed scope and design packages for subcontractors, enabling firm-price quotations for auxiliary facilities such as camps, workshops, and support infrastructure.

• Conducted special studies such as insulator performance assessments, resulting in an ongoing insulator replacement program that significantly improved transmission line reliability.

• Developed scope specifications for power system and protective relay studies, reviewed and approved consultant work, and implemented recommendations to enhance system performance and reliability.

• Organized and managed strategic projects, including project teams and interfaces across all disciplines and stakeholders, ensuring integrated execution of complex engineering initiatives. 8.10 Feb., 87 to Sept., 93 Arab Potash Company (APC), Jordan This company is engaged in the production of KCL. The company has its own co- generation power plant and power distribution system. Title: Planning & Scheduling Maintenance Superintendent Duties:

Electrical Maintenance & Project Management – Senior Engineer / Manager

• Oversaw the maintenance of electrical equipment, including analysis of failures, root cause investigations, and recommendations for corrective actions.

• Prepared, designed, and implemented electrical and



Contact this candidate