just
RESUME
P.VENKATACHALAPATHY
*****************@*****.*** 26/2, West Street,
*************@*****.*** Nalattinputhur (Post)
Kovilpatti (T.K), Tuticorin
Tamil Nadu – India – 628716
Cell No :+91 – 979*******
Post Applied for – Electrical Engineer
CAREER OBJECTIVE:
To obtain a long term career in an organization, where innovation, engineering excellence is the way of life and where my full potential is explored for the development of oil and gas industry, power energy and petrochemical industry.
PROFESSIONAL EDUCATION:
Diploma in Electrical and Electronics Engineering (2002-2005) EXPERIENCE:
Total Experience : 13 + Years Electrical Engineer Project Field. SUMMARY OF EXPERIENCE:
A successful, highly motivated electrical engineer with 11+ years extensive experience throughout the Oil and Gas industry. Processes experience in many FPSO and offshore platform projects and few onshore projects. procurement assistance, basic and detail engineering for complete topside, worked with various international clients like Bechtel, KNPC, Borouge3, Saipem, Saudi Aramco, ADNOC, ZADCO, ONGC etc., extensive experience throughout the oil and gas industry.
just
JOB PROFILE:
1. TECNICAS REUNIDAS COMPANY (ABUDHABI)
Client Name : ADNOC
Position : Electrical
Engineer Project : MERAM
Period : JAN 2025 to Till Date
· Grounding system, Electrical Heat tracing, Fire alarm system, Cable tray layout, etc.. Proficient in Electrical system.
· Power Distribution system, Cable sizing, MV & LV switchgears, Motor control center, Lighting, Lightning Protection system.
· Conducted Elecrical inspection & test on Electromechanical equipment such as Transformers, Motor control center, Switch gear, Motor & Motor drives power cables.
· Installation of HT/LT motors, Switcgears, Power transformers, Distribution transformer & related protection system.
· Responsible for overseeing the construction supervision & inspection of erection, Electrical EHV/HV switchyard, Generators, Transformer, HT/LT switch board, HT/LT motors, HT/LT cable laying (power & control)
· 6. Battery, Battery charger & EDG, Fire protection & detection system, Earthing, cable tray, Lighting & lightning protection as per drawing and standard of all Electrical works including.
· Erection, Installation & commissioning of HT/LT Switchgear, Transformers & related Electrical works.
· Installation of a new temporary Substation rated at 10MVA, 22/6.6kV just
· Site manage the complete power grid installation of transformer, small substation, Battery bank & MV/LV cable works.
· Factory testing of a 630kVA Generator & installation.
· Supervision of the installation of Instrument control equipment inside the subtation & interlocking with generator.
· Installation of 3.3kV MCCS, including MV cabling & control wiring for our four air compressor at bayside aluminium.
· Execution of project & this include supervision on installation of medium voltage switchgear, cables (Medium/Low voltage), RMU, Variable frequency drives, Transformer control panel, MCC motors
· Conducted Elecrical inspection & test on Electromechanical equipment such as Transformers, Motor control center, Switch gear, Motor & Motor drives power cables.
2. ELTECH ENGINEERING OIL AND GAS
CONSTRUCTION PROJECT (CHENNAI)
Client Name : BECHTEL
Position : Electrical Engineer
Period : JUL 2020 to MAR 2024
· Installation of all Electrical panels in 11kv Substation. Erection and of all Electrical panels like in HT panels, MCC, LT panels, PCC,VFD’S & MLDB (Main Lighting Distribution Board) panels, MCC, LT, PCC, MLDB panels as per Layout (Distribution area).
· Installation of HT Transformer 11kv&6.6kV including with testing.
just
· Supervising of all Electrical Equipment testing like CT’S,PT’S, Circuit Breaker, HT Transformer, Busduct, Alternator and HT cables.
· Installation of both HT& LT motors as per layouts in different units.
· 11kv HT panels internal wiring (tripping closing Alarm) 11kv controls relay panels.
· HT< cabling and total illuminations of the plant.
· Attending weekly /monthly progress meetings with client and consultants and prepare progress reports including reporting to company top management.
· Power Distribution system, cable sizing, MV&LV Switchgears, motor control center, Grounding system, Electric heat tracing, Fire Alarm system, lighting .
· Supervision of Installation of cable laying, conduit installation, JB installation, Hook up installation.
· Responsible for overseeing the Construction supervision and Inspection of Erection, From EHV/HV Switch yard, Generators, transformers, HT< Switch Boards, HT< motors, HT& LT cable laying (Power and control).
· Battery charger and Emergency D.G. Sets, Fire protection and Detection system, Earthing, cable tray, Lighting and Lightening protection as per drawing and standards of all Electrical works of including.
· 33kv Electrical substations Execution and supervision of Erection, power Transformer, Distribution Transformer, NGR and RTCC panel.
· Execution and Supervision of Erection, of HV,MV SWBD/BUS duct, Battery charger, UPS,VFD panels, ACBD/DCDB.
just
· Supervision of both HT< cable laying, glanding &termination works.
· 33kv Electrical substations as per approved procedure &Schedule supervision of Erection of both HT< motor cable laying. Supervision of No load run test of MV &HT motor after cold/hot loop checking.
· Recording measurements of power, voltage,current,insulation resistance of Electrical panel/Cables, Earth resistance, Transformer OTI & WTI reading.
· In association with testing wing carried out testing of relays, Switchgear and Transformer.
· Switchgear installation and testing; Specially trained and executed testing of HV and LV switchgear equipment like circuit breaker, power Transformer, Current Transformer, voltage Transformer and relays etc.
· Provided Services for Air circuit breaker,SF6 circuit breaker in all respect like Erection, trouble shooting and overhauling etc.
· Installation of HT & LT Equipment in largest industrial project and HT< cable laying Glanding, Termination, and cable joint and cable tray installation and lighting installation.
· *MV&HT panel, sub switch board distribution board are Erection as per IE standards of measurements and
drawing.
3. DOLPHIN OILFIELD ENGINEERING COMPANY
(Abu dhabi)
Client Name : EGA
Position : Electrical Engineer
Period : Oct 2018 to OCT 2020
just
LV Switchgear, Power Panels & Switch Rack’s LV Cables
Lightings, Lighting Fixtures, Lighting Junction Boxes, Conduits
& accessories,
Power Transformer, Earthing Cables and Cable rods in compliance with standards.
Reviewed Vendor documents in compliance with standards and specifications
Equipment’s and Materials selection in compliance with Hazards areas classification
Identification of installation locality for Power Panel’s & Switch Rack’s in Tank Farm area in compliance with standards, Panels
& Cable entry locations in the buildings
Cable Trench and Cable Tray’s route marking / excavation
Conduit’s route marking/Fixing, cable fixing & cable laying.
Grounding Grid Trench excavation / cable laying & Thermo welding interconnection
PMT day to day coordination – vendor coordination
Resource planning / monitoring for smooth and timely execution of the project
Attended weekly progress review meeting with clients. Description : IFC Drawings review and modifications, MTO’s review and Modifications, Material’s selection as per project requirements, Vendor documents review as per specification, vendor coordination, cable Trench
& Cable Tray route marking/excavation, Technical Query clearance, Cable just
Laying, Cable Tray fixing, Grounding Grid Laying & interconnection, PIB/SIH Buildings Cable entries & Panel Locations, PMC Coordination, Power Panel’s & Switch Rack’s location identification & markings as per STD’s Schematic/control and logic diagram revieval.
UPS sourcing to LV Panel board
33kv cable routing design between two stations
Method statement preparation and its modification
Site facilities Development
Site Coordination
Site Visit for Data Collection
Comments updation
Site coordination and drawing modification at site
Technical Query clearance at site
Vendor coordination’s )
4. NOOR ALKHALEEJ ENGINEERING AND
CONTRUCTION COMPANY (IRAQ)
Position : Electrical Engineer
Period : May 2018 to July 2018
Installation of 13.8 Kv / 380V 2500KVA transformers 12 No’s Bus ducts arrangements, inspection, testing
commissioning and handover as per International standards. just
Installation of Electrical power HT& LT distribution panel, switch gear,
surge protectors main distribution board, sub distribution board, motor control center, starters, under voltage relay, metering, VCB,ACB,MCCB.
Installation of Temporary substation with 16 No’s 625 K.V.A D.G sets and 4 No’s 2500K.V.A Transformer all are one group connected system, and installation of its BUS BAR, U.G cable Termination, Installation of its switch gear, protective relays arrangements. Installation of cable trays, cable ladder, steel cable trunking, PVC under floor trunking, raised floor power bus bar and its trunking, lighting bus bar trunking flexible metallic conduit, underground cable conduit, low current system trays.
Section the incomer to the tie moreover the installation of circuit breakers inside the switchgear and the testing of the bus bars by the megger and Duck test. Complete transformer installation and commissioning tests such as winding and Hi-Pot test. Moreover, the termination of the control transformer cables at the annunicator panel.
MCC erection the scope included the installation of MCC’s internal bus bars and space heater. As well as, the continuity and megger test between MCC and the equipment at the field. In addition, the testing of the control sections of the MCC.
Internal cable pulling between switchgear to MCC, Switchgear to UPS, MCC to interpose panel ( Marshalling panel).
Grounding system for the projects. Cable tray and ladder installation. Lighting system. Paging and communication system for site ( installation and connection).
just
Testing and termination for all electrical equipment at side. Lighting installation as per specification drawing.
Pulling cables to xomplete the loop between lights and pulling the cables from main junction box to distrbution board. Install the cable tray or conduit between the lights to complete the circuit.
Cable glanding and termination. Heat tracking or piping and values. (Installation and cable pulling from the Main Board to junction box)Mobilization for electrical on side. Temporary power for electrical panel, pulling cables from the generator to main distribution board, and from MDB to distribution panel).
5. SOGELEC ISKAN ENGINEERING AND
CONSTRUCTION PROJECT (QATAR)
CLIENT NAME : ADCC
POSITION : ELECTRICAL ENGINEER
PERIOD : March 2015to June 2016
· Maintenance of High pressure/Low pressure filters and Chemical skids used for water treatment
· During construction of the above water injection plant worked as a Electrical supervisor reporting to project manager
· Involved in design of Electrical system and reviewing the drawings prepared by subcontractor
· Inspection of Various safety aspects for employee and plant safety while working.
· Other than electrical activities looking after instrumentation work during execution on site and reporting all to project manager. just
· After completion of construction of the project prepared commissioning procedures of the plant.
· Plans and supervising the execution of the daily work requirements for the technical maintenance program. Managing overall activities and various requirements of the plant.
· Reports regularly on above mentioned matters as well as achievement of Key Performance.
· Operation and maintenance of the various electrical and mechanical equipments / Drive systems in the plant area.
· Start up and after trouble shooting of various systems involved in process for continuous operation of plant.
(ROLES & RESPONSIBILITIES)
· Prepare procurement engineering that includes preparation of RFQQ/Material requisition, Technical Query & Vendor Document review.
· Details Vendor drawings/documents reviews of HV/LV Switchboard, distribution Transformer, DC,UPS systems, Navigational Aid, Solar power system, battery & battery charger, Generator Package, Mechanical Packages, Instrumentation cabinets
& Packages, Power etc.
· HT/LT Electrical systems for offshore & Onshore oil & Gas field and handling the sizing of equipment, earthing& lighting and Equipments layouts.
· Preparing drawings through extensive study of technical documents on detailed engineering; resolving site queries to meet execution requirement; understanding the technical & functional specifications.
· Collecting data for and coordinating the entire operation including requirement analysis, finalizing specifications and directly with client for technical queries & giving best possible solution. just
· Preparing techno commercial offer (Bid documents study, man- hours estimation and develop required pre-bid deliverables)
· HT/LT equipment sizing (inclusive of Transformer, Bus of, Switchgear, Generator, Cable, NGR & Capacitor)
· Participation in PDMS model reviews related to Electrical aspects
· Anchoring on-site erection & commissioning activities and ensuring completion of project within the rime & cost parameters and effective resource utilization to maximize the output. 6. HYUNDAI ENGINEERING AND CONTRUCTION
BOROUGE3 PROJECT (ABUDHABI)
Client Name : BOROUGE3
Position : ELECTRICAL ENGINEER
Period : Jun 2013 to Jun 2014
RESPONSIBILITIES:
Prepares daily schedules and distribution of manpower for effective productivity. Equipment and required manpower for the immediate execution and completion of the project scope of work. Coordinates with client and contractors for any modification in design. Update the work schedules by weekly prepares the materials submittals for approval of client
just
Working as Electrical Engineer / Area in charge for installation / erection of Transformers:
· Having capacity of 45/60MVA, 20/25 MVA, 2.5MVA (Installation of accessories of power transformer like Radiators, Cooling fans, TOP and bottom headers, conservator tank with pipe fittings
· Breathers, LVN busing and box, HV Box, LV Box, HV and LV bushing, NGR, Marshaling panel for control wiring, remote Tape change control panel RTCC etc.
· Participated for oil filling and filtration, meggaring, TTR test, winding resistance test, magnetic balance test, no load test for these transformers.
· And dry type transformer 75kva, 100 Kva, and 150 Kva Medium and Low Voltage Switchgears:
· 13.8 KV and 4.0KV medium voltage switchgears and 380 volt low voltage switchgears
Motor Control Centers (MCC):
· Motor control centers and emergency motor control center for difference areas
UPS System:
· 75kva ups panels and battery charger and battery bank 110 volt and 208 volts
· Also participating for plant grounding, cable pulling work and termination work as per schedule provided by client
· Lighting, protection work for plant substation, GIS and control room buildings.
· Also participating in testing
· Commissioning of MV switchgears, LV Switchgear, MCC, just
Transformers, Distribution panels, motors etc.,
Electrical:
· 500 KVA Transformer, DKT type transformer, Distribution power panel, lighting panel, lighting control panel, photocell, low bay and fluroscent lightings, grounding grid, AHUS, DDC Control panel and related instrument etc.
· Worked as site supervisor / site in-charge in shed gum for installation, operation, testing and commissioning of air handling waits, low bay lightings, grounding grid, power distribution panels and lighting contractor panels, disconnect switches and digital thermostats.
· Worked as site supervisor in for installation, operation, testing and commissioning of low voltage switchgears, control panel with star delta timer, motors and pumps for industrial duties pressure switches and level switches, fire hydrant and CS Pipe lines work.
· Activist in the engineering department as electrical engineer updating the existing drawings according with which has been done in the field and with the new instructions from the designer.
· Maintaining an accuracy situation of the already used materials in the construction activity and estimating of the necessary materials to continue the next steps of projects according with primary list. 7. MUHIBBAH ENGINEERING CONSTRUCTION
COMPANY (QATAR)
Client Name : SAIPEM
Position : Electrical Supervisor
Period : Jan 2011 to Apr 2012
· Testing and commissioning of high and low voltage, electric network and transformer substation, preparation of technical specification, installation and operation of medium Voltage Cable Networks.
just
· installation, testing and commissioning/ Switch Gear & Transformer testing up to voltage level of 500 KV, Testing and commissioning of Transformer, H.T& L.T,motors, Site Testing of HT & LT Panels, Cables, Logical and Other Panels.
· HT& LT Electrical Projects, sub-stations, transmission & distribution drawing related with control, protection, interlocking working with medium & high voltage switch gears equipments, power transformers, HV/MV cables, station auxiliaries.
· HV&EHV Electrical Project Testing and Commissioning of Various Make, Transformer ( 500,750,1000,1600,2500 KV.A, 16,35,70,200, M.V.A), Generator ( ( 500,750,1000,1600,2500 KV.A)
· and Motor ( L.T motor up to 250 H.P,H.T motor up to 4000 H.P), protection relays, Differential protection, over current and Earth fault, over and under Voltage relays. Control
& Relay panels.
· Electrical switchgear VCB,ACB,OCB and SF6 Breaker and isolators. Power transformers, Distribution transformers, current transformers, potential transformers.
· Battery chargers converter panel, inverter panel, Battery banks, Neutral grounding resisters of transformers, Supervision of EHV, MV& LV Industrial and utility Electrical installations up to 400/220 Have experience on the project involving substations, indoor switchgears, control and protection panels, HV& MV power cabling and control cabling.
· Experience in power distribution, handled erection of power distribution line, 11/415V 33/11K V, 22/415V, 400/220KV sub- stations for power distribution Experience in Project of HV, MV,
& LV ( Cabling, Cable trays & junction boxes termination cable testing, cable jointing, UP’s, motors, Actuators, lighting, Switchgear, Transformers, RMU’s)
just
Installation of general lighting system and central battery based emergency lighting system and battery band
installation and its control panel, charger panel, inverter panel, converter panel and its control wiring.
Installation of fire detection and alarm system, smoke sensors, Heat sensors, Beam sensors duct sensors, Manual call points etc.
Installation of earthing system, Structural earthing, Equipment earthing, Transformer, D.G earthing and
lighting protection earthing as per International standards. protection relays, Differential protection, over current and Earth fault, over and under Voltage relays. Control & Relay panels. Electrical switchgear VCB,ACB,OCB and SF6 Breaker and isolators. Power transformers, Distribution transformers, current transformers, potential transformers.
Battery chargers converter panel, inverter panel, Battery banks, Neutral grounding resisters of transformers, Supervision of EHV, MV& LV Industrial and utility Electrical installations up to 400/220 Have experience on the project involving substations, indoor switchgears, control and protection panels, HV& MV power cabling and control cabling.
Experience in power distribution, handled erection of power distribution line, 11/415V 33/11K V, 22/415V, 400/220KV sub- stations for power distribution Experience in Project of HV, MV, & LV ( Cabling, Cable trays & junction boxes termination cable testing, cable jointing, UP’s, motors, Actuators, lighting, Switchgear, Transformers, RMU’s)
Installation of general lighting system and central battery based emergency lighting system and battery band
installation and its control panel, charger panel, inverter panel, converter panel and its control wiring.
Installation of fire detection and alarm system, smoke just
sensors, Heat sensors, Beam sensors duct sensors, Manual call points etc.
Installation of earthing system, Structural earthing, Equipment earthing, Transformer, D.G earthing and
lighting protection earthing as per International standards.
Termination of U.G cables in all electromechanical system like AHU, FCU, EAU, chillers VAU, Thermostat control and installation of BMS system.
Installation of fire fighting system and its motors and control panel and detectors
8. SAUDI ARAMCO OIL AND GASCONTRUCTION
PROJECT (SAUDI ARABIA)
CLIENT NAME : SAUDI ARAMCO
POSITION : ELECTRICAL SUPERVISOR
PERIOD : July 2006 to Aug 2009
· Detail engineering of electrical system for process plant & substation
· Preparation of load summary
· LT & HT equipment sizing (includes transformer, generator, NGR, capacitor)
· LT & HT cable sizing calculations for various motor loads and non motor loads
· Preparation of cable schedule for HV & LV cables
· Lighting with the help of AGI32 & BAJAJ PHOTOLUX
· Lighting & small power layout for the plant, substation, control room, utilities & roads
· Lighting panel & cable schedule
· Preparation of communication layout & block diagram for (Telephone, PA system, CCTV)
· Earthing&Lightning protection for plant, substation & control room.
just
· Preparation of earthing& lightning protection layout for unit area, substation & control room
· Preparation of material requisition / purchase requisition / technical bid evaluation.
· Review of various vendor documents, technical queries to vendors, coordination with EPC team for Final PO
· Coordinating interdisciplinary engineering activities and managing interface within design and engineering
· Coordination with all concern functionaries of the project – client, PMC, vendors during all phase.
· Coordination with site team
· Preparation of Bulk material take offs (MTO)
· 33KV electrical substation execution and supervision of erection, testing
& commissioning of power transformers, distribution transformers, NGR and RTCC panel.
· Execution and supervision of erection, testing & commissioning of HV & MV SWBD/Bus duct, Battery chargers, UPS, VFD panels, ACBD/DCDB)
· Cable trays works supervision of both HT & LT cable laying, glanding& termination works
· Supervision of installation of fire alarm & plant communication system.
· Installation and related works of industrial lighting in pump houses and offsite tankages area
· Execution of installation, and its related works of MCP’S, MOV’s, ideal Datacom Network and electrical solutions.
· 33 KV electrical substations as per approved procedure & schedule supervision of erection of both HT & LT motor cable laying
just
· Supervision of No load run test of MV & HV motors after cold/hot loop checking
· Recording measurement of power, voltage, current, insulation resistance of electrical panel//cables, earth resistance, transformer OTI & WTI reading
· The responsibilities included project management from planning, contract management, man power management, execution of construction work
· Expert in construction of 400/220/132 KV switchyard, job included erection, testing, commissioning and trouble shooting of HT/LT equipments like transformers, circuit breakers, structures, conductors, cables, aluminum pipe joints reactors, lightning arrestors, isolators, current and voltage transformers etc.
· In association with testing wing carried out testing of relays, switchgears and transformers
EDUCATIONAL QUALIFICATION:
Electrical and Electronic Engineering
COMPUTER PROFICIENCY:
Excel, MS Word, Microsoft Office, Autocad, Power point, Windows PROJECT:
· Recording measurement of power, voltage, current, insulation resistance of electrical panel//cables, earth resistance, transformer OTI & WTI reading
· The responsibilities included project management from planning, contract management, man power management, execution of construction work
· Expert in construction of 400/220/132 KV switchyard, job included erection, testing, commissioning and trouble shooting of HT/LT just
equipments like transformers, circuit breakers, structures, conductors, cables, aluminum pipe joints reactors, lightning arrestors, isolators, current and voltage transformers etc.
· In association with testing wing carried out testing of relays, switchgears and transformers
· Switch gear installation and testing: specially trained and executed testing of HV and LV switchgear equipments like circuit breakers, power transformers, current transformers, voltage transformers and relays etc.,
Services: Provided services for Air blast circuit breakers, SF6 circuit breakers in all respects like erection, testing, commissioning, trouble shooting and overhauling etc.
EDUCATIONAL QUALIFICATION:
Electrical and Electronic Engineering
COMPUTER PROFICIENCY:
Excel, MS Word, Microsoft Office, Autocad, Power point, Windows PROJECT:
SEMI – SERVO STABILIZER
HOBBIES:
Listening Music, Reading Books, Sports
LANGUAGE PROFICIENCY:
English, Hindi, Tamil, Malayalam
just
PASSPORT DETAILS
PASSPORT No : U5071958
COUNTRY : INDIA
DATE OF ISSUE : 29/12/2020
DATE OF EXPIRY : 28/12/2030
PLACE OF ISSUE :MADURAI
PERSONAL DETAILS
Name : P.Venkatachalapathy
Father Name : S.Perumalsamy
Date of Birth : April 15th,
1984 Nationality : Indian
Sex : Male
Marital Status : Single
DECLARATION
I hereby declare that the above information are true up to my knowledge. Yours Truly,