Post Job Free
Sign in

Senior Project Manager Airport City Infra

Location:
Hyderabad, Telangana, India
Salary:
24 LPA
Posted:
March 03, 2026

Contact this candidate

Resume:

*. Name of Expert Neeraj Kumar Tiwari

*.

Current Designation in

the Organization

Associate Manager – Airport City Infra

3. Name of Firm M/s GMR Hyderabad International Airport Limited 4. Date of Birth 06/09/1990 Citizenship: Indian

5.

Education

Master’s Degree – M.B.A in (Project Management + Production

& Operations Management)

College – Bharati Vidyapeeth Deemed University Pune

Year of Passing – 2023

Degree – B. Tech. in Electrical & Electronics Engineering

College – United College of Engineering & Research Naini Allahabad affiliated to UPTU (Uttar Pradesh Technical university)

Year of Passing – 2012

6.

Professional

Certifications/Trainings

Certified PLC Programmer in Automation

7.

Countries of Work

Experience

India

Language Skills

(Mark Excellent/Good/Average)

Language Read Write Speak

English Excellent Excellent Excellent

Hindi Excellent Excellent Excellent

8. Employment Records (For the total relevant experience) From March-2024 To Till date

Employer GMR Hyderabad International Airport Ltd.

Position Held Associate Manager (Airport City Infra) From March-2017 To February-2024

Employer Larsen & Toubro Ltd.

Position Held Sr. Engineer & Asst. Manager

From July-2014 To March-2017

Employer Sufalam Infra Project Ltd.

Position Held Electrical Engineer

From January-2013 To June-2014

Employer SKS Ispat & Power Ltd.

Position Held Asst. Engineer (E&I)

From June-2012 To January-2013

Employer Sunil Sponge and Power Pvt. Ltd.

Position Held GET (E&I)

9. Total No. of Years of 13+ Years

Work Experience

10. Works Undertaken That Best Illustrates Capability to Handle the Tasks Assigned Employer M/s GMR Hyderabad International Airport Limited Project Name Hyderabad Airport City

Client Rajiv Gandhi International Airport, Hyderabad Year March 2024 to Till date

Location Shamshabad Airport Hyderabad, A.P.

Main project Features

Coordination with Govt. Agencies, Regulators, NAC, Municipal Corporation, HMDA, Police, Pollution Control Board. To ensure approvals are obtained on time and to maintain cordial relationships are maintained.

Development of the data centre for Airport Predictive & Operation Centre

(APOC) in terms of design, plan and implementation.

Electrical & MEP project for Aero city Hyderabad.

Seamless Transportation.

Integration of KPI/KRA with Airport Operations Centre (APOC) Project on Kloud spot Platform.

SLA Management and Billing Management.

Position Held Associate Manager (Airport City Infra) Activities performed

End-to-End Data Center Construction & Project Execution

Led end-to-end construction execution of mission-critical data center projects, ensuring adherence to approved design, cost, schedule, quality, and safety benchmarks.

Served as the on-site Electrical & Mechanical Engineering Lead for multi-year data center campus developments, acting as the primary technical authority during construction.

Ensured implementation of projects strictly as per approved project plans, global design guides, and engineering standards.

Develop an SOP which ensured the requisites of all the statutory approvals of the landside projects before the commencement of

the works.

To monitor the Landside Committee Meeting Agenda Items and ensure on the execution of the landside Projects as per the recommended approved points of the committee.

Safety Management: Ensure Safe working practices and work towards accident prevention initiatives. Coordinate with GHIAL Safety team for the implementation of the safety initiatives.

MEP Engineering Management

Oversaw the development, review, and approval of all MEP engineering deliverables including shop drawings, technical submittals, material approvals, calculations, and as-built documentation.

Approved MEP technical documents ensuring compliance with project specifications, local statutory requirements, and international best practices.

Coordinated closely with consultants and design teams to ensure engineering deliverables aligned with client expectations and contractual obligations.

Led on-site execution of Electrical, Mechanical, HVAC, BAS, ELV, and power infrastructure ensuring compliance with design intent and codes. Electrical Systems & Power Infrastructure

Led execution and oversight of HV/MV electrical systems, power distribution networks, Power substations, UPS systems, diesel generators, and synchronization schemes.

Managed Electrical Power Monitoring Systems (EPMS), control diagrams, sequences of operation, and integration with BMS & PMS.

Reviewed construction drawings, equipment submittals, specifications, and commissioning documents to ensure technical compliance and long-term operational reliability.

Mechanical Systems & Controls

Provided engineering oversight for chillers, AHUs, pumps, cooling systems, fans, and associated mechanical infrastructure supporting critical environments.

Demonstrated working knowledge of Building Automation Systems (BAS), DDC, PLCs, and control philosophies to support high-availability data center operations.

Safety Leadership & Compliance

Championed a zero-accident safety culture, leading implementation and monitoring of global safety standards and safe work practices.

Conducted regular site safety walks, audits, and toolbox talks to ensure full compliance with HSE regulations and industry best practices.

Ensured all MEP installations complied with statutory, safety, and environmental regulations, maintaining full documentation and audit readiness.

Risk Management & Project Controls

Supported the Project Director in identifying technical and execution risks, developing mitigation strategies, and implementing contingency and backup plans.

Conducted regular risk assessments, track risk registers, and proactively addressed schedule, cost, and quality risks.

Closely monitored milestone achievement, engineering bottlenecks, and construction interfaces to ensure uninterrupted progress. Site Coordination & Execution

Led cross-disciplinary coordination to resolve MEP, architectural, and civil interface challenges on site.

Chaired and participated in coordination meetings, quality review sessions, milestone reviews, and assurance meetings.

Verified construction readiness through drawing reviews, site inspections, and installation sequencing planning.

Ensured timely availability of materials and equipment by working closely with procurement and logistics teams.

Team & Stakeholder Management

Led, mentored, and managed teams of MEP engineers, BIM modelers, and subcontractors, driving high-performance outcomes.

Set performance objectives, monitored engineering outputs, and ensured delivery of accurate, timely, and compliant deliverables. Employer M/s Larsen & Toubro Limited (India)

Project Name Nagpur, Prayagraj & Jhansi Smart City Project Client

Nagpur Municipal Corporation and Police Department

Prayagraj Nagar Nigam and Police Department

Jhansi Nagar Nigam and Police Department

Year March 2017 to February 2024

Location

Nagpur, Maharashtra

Prayagraj, Uttar Pradesh

Jhansi, Uttar Pradesh

Main project Features

Implementation of Command Control Centre and Data Centre.

Integrated Building Management System.

HVAC & Fire Fighting System

Smart & Safe City Project

SITC of various ICT services such as Integrated Building Management System containing, MEP, Electrical, BMS, Access Control System, PA System, IP based Surveillance System, Networking, Smart Parking, Smart Strip, Smart Lights, ATCS, ITMS and Citizen services.

SLA Management and Billing Management

Security Management

Performance Optimization

Position Held Senior Engineer & Asst. Manager

Activities performed

Project Planning & Execution

Led end-to-end execution of Tier-III compliant Data Centres for Smart City projects in Nagpur, Prayagraj, and Jhansi, ensuring adherence to SLA and uptime requirements.

Developed detailed project schedules, resource allocation plans, and risk mitigation strategies for electrical and mechanical systems. Electrical Systems Management

Oversaw design, installation, and commissioning of HT/LT panels, UPS systems, DG sets, transformers, and power distribution units.

Ensured compliance with IEC, IS, and NFPA standards for electrical safety and redundancy.

Mechanical Systems Oversight

Managed HVAC systems, precision cooling, fire suppression (VESDA, FM200), and water leak detection systems for mission-critical environments.

Implemented energy-efficient solutions to optimize PUE (Power Usage Effectiveness).

Vendor & Contractor Coordination

Handled technical evaluation, BOQ preparation, and vendor negotiations for electrical and mechanical packages.

Monitored contractor performance and ensured timely delivery within budget constraints.

Quality & Compliance

Conducted FAT/SAT, QA/QC checks, and ensured compliance with Tier-III certification requirements.

Maintained documentation for audits and statutory approvals. Stakeholder Management

Collaborated with Smart City authorities, consultants, and internal teams for seamless integration of IT and MEP systems.

Provided regular progress reports and ensured alignment with project milestones.

Risk & Safety Management

Implemented stringent safety protocols for high-voltage and mechanical works.

Conducted hazard analysis and ensured zero-incident execution. Budget & Cost Control

Managed project budgets exceeding 100 Cr across three Smart City Data Centres.

Achieved cost optimization through value engineering and vendor consolidation. Key Achievements

Delivered three Tier-III Smart City Data Centres within stipulated timelines and budget.

Improved operational efficiency by reducing PUE to industry benchmarks.

Successfully integrated redundant power and cooling systems ensuring 99.98% uptime.

Employer M/s Sufalam Infra Project Ltd

Project Name Vrindavan Township (Large Township in 111 Acre) Client Radha Madhav Developers

Year July 2014 to March 2017

Location Nagpur, Maharashtra

Main project Features

Well Planned Road networks with Proper illuminations and plantation.

Independent 33/11 KV Substation and cluster wise 11KV/44o V Distribution feeder along with backup supply feeder.

Independent Water Treatment plant with 4 LLPD capacity.

Independent Sewage Treatment plant with 4 LLPD capacity.

Green building Projects.

High-rise Buildings.

Swimming pool.

Playground and gaming zone.

Clubhouse amenities.

Fire Fighting System & security surveillance system. Position Held Electrical Engineer

Activities performed

Report & closely work with customer and assist him with the inter- departmental organization of various aspects of the projects.

Track project and provide regular reports on project status to project team and key stakeholders.

Responsible for drawing verification and execution of single line diagrams, HV and LV switchgears, Cable sizing, Lighting, Earthling/grounding.

Conversant with Electrical layouts like raceways, escalator & lift, lighting, Generator, transformer and switchyard.

Maintain a safe work environment, devising safety procedures and following all safety regulations.

Overseeing construction/installation and testing activities and identify any deviations from quality standards.

Mentoring & monitoring the performance of the workforce to ensure efficiency in Project delivery.

Responsible for MEP monitoring in construction Project.

Closely monitoring the installation of 4 LLPD capacity Water Treatment Plant and Sewage Treatment Plant.

Laying of 5 Km length raw water line from water source (River) to WTP.

Maintenance of RMC Plant.

Maintenance of Fly as Bricks Plant.

Implementing, Operation & Maintenance of 33/11 KV Sub- Station Project at Vrindavan City.

Implementing 11 KV /440 V Bay structure, including 630 KVA Transformer, CT, PT & ABT meter.

Employer M/s SKS Ispat & Power Limited

Industry Type/Sector Production (Steel & Power)

Position Held Asst. Engineer (E&I)

Year January 2013 to June 2014

Location Raipur, Chhattisgarh

Activities performed

Efficiently handled Ferro Alloys Plant having 2x9 MVA Submerged Arc Furnace including Raw material plant.

Managed team of preventive maintenance to achieve break down free plant.

Allocate resources effectively and fully utilized assets to produce optimal results.

Develop strategies to increase productivity and production.

Analyze production metrics and data to determine areas of improvement.

Responsible for daily checking and maintenance of raw material calibration system.

Daily routine check-up and maintenance of hydraulic system for furnace.

Responsible for daily checking and maintenance of EOT Cranes (12.5 Tonne, 30 Tonne, 50 Tonne), skip, Hoist.

Responsible for daily checking and maintenance of Ferro Alloys Pollution Plant.

Responsible for daily checking and maintenance of AC motors, DC motors and Synchronous motors.

Responsible for daily checking and maintenance of AC Drives, DOL, Star- Delta, Reverse-Forward Starters.

Responsible for the routine checking of DG set and arrange the maintenance as per requirement.

Taking initiative of energy saving and maintain the record of

power consumption equipment wise.

Expert’s contact information:

e-mail: neerajen2029@@gmail.com

phone:+91-907*******

Certification:

I, the undersigned, certify that to the best of my knowledge and belief that a. This CV correctly describes my qualifications and my experience b. I understand that any willful misstatement described herein may lead to my disqualification or dismissal, if engaged.

Neeraj Kumar Tiwari

Name of Expert

Signature

08/01/2026

Date



Contact this candidate