Michael A. Poskey **** Pecan Drive
Beaumont, Texas 77706 e-mail- ******@*****.***.
PROFESSIONAL EXPERIENCE
Indemand Industrial Site Engineer (Linde Clean Hydrogen Project)
Services
Nederland, Texas Support construction team mechanical and electrical scope of work.
Feb. 2025-Present
Golden Pass LNG Sabine Pass, Texas
Oct. 2019-Jan.2025 Project Manager/Project Engineer
Lead the execution of small Opex and Capex projects, overseeing the engineering, procurement, construction and commissioning activities.
Ensured strict contractor adherence to Company’s health, safety, and environmental standards throughout all phases.
Set-up of appropriate budgets from the project estimated and schedule.
Prepared and implemented the work breakdown structure (WBS).
Ensured all project cost pressures and opportunities were proactively identified, understood and communicated to management.
Negotiated contract pricing and terms & conditions directly with supplier while working with Company stakeholders, seeking lowest total system costs, appropriate mitigation of supply and legal risk.
Shell Oil Basra, Iraq Dubai, UAE Houston, Texas
Feb. 2013-June 2018 Lead Senior Project Engineer (Consultant)
Project Tigris (2 Solar MARS 100-70mmscfd Gas Handling Trains) Majnoon Oil Field, Iraq.
Define scope from phase 2 through phase 5
Support Project Manager and all Stakeholders
Develop level 4 schedule
Monitor Contractors
Respond to all technical queries (TQ).
Bechtel Houston, Texas
Nov. 2013-Feb. 2014 Commissioning Start-Up Engineer
Tatweer Petroleum Manama, Bahrain
Oct 2011-May 2013 Senior Project Engineer
Bahrain Oil Field (45,000 BPD Oil Production Field EOR Projects)
Major responsibility includes controlling schedule and budget, secure personnel and financial resources for each project, ensure
safety in design and work practices, coordinating with peer managers and other staff on technical matters and concerns and ensuring compliance with Company policies and specifications.
purchasing, contracting, service order, risk analysis, “Fit for Purpose” facilities and other areas.
CHEVRON (Consultant) Houston, Texas
June 2010-Oct 2011 Senior Facility Engineer (Consultant)
Malongo, Angola-Block 0, Taluka Field Offshore Production Facility (155,000 BPD).
Provide facility/engineering support to operation as well as implementing strategies.
Coordinating with all engineering disciplines (Reservoir, Production, and Completion) to successfully develop and execute plans.
Monitor progress of facility projects.
Guide contract engineering resources to assist with executing project and compliance issues.
Provide AFE quality cost estimate and performance of post actual project
Coordinate risk assessment.
June 2009-June 2010 Lead Mechanical Commissioning Engineer (Consultant)
Malongo, Angola- Cabinda Gas Plant (CGP) Green Field 25 MCFD Producing 10,000 B/D LPG product.
Responsible for overall project commissioning process and Product systems.
Severed as subject matter expert for the commissioning process.
Assisted in the overall planning and execution of the scope of work of contractor.
Ensure overall Mechanical Completion milestones are set and work is managed consistently with these milestones.
June 2007-June 2009 Senior Project Engineer (Consultant) -$1.0B
Malongo, Angola-FARM Offshore Project-Eliminated routine flaring.
Work involved piping, structural, instrumentation and electrical modifications to 14 existing offshore gathering stations.
TGPP-Taluka Gas Processing Platform 340 mmscfd-Received low-pressure gas streams that are recovered from FARM modifications. The recovered gas was compressed, sweetened, dehydrated, and recovered natural gas liquids (NGLs).
Lead the offshore team to execute all SIMOPS and Shut-in activities.
Worked with contractors and managed Job Card development, review and approval.
Lead effort for level 3, 4 & 5 scheduling efforts during all shut-in and SIMOPS work.
Managed project risk register, approved input and review of project cost forecast and schedule.
Participated, reviewed and commented on project staffing efforts, defined roles and responsibilities for the construction team.
Reviewed and commented on the project execution plan, documentation, review of Best Practices and Lessons Learned and engineering documents.
VECO
Anchorage, Alaska
September 2006-May 2007 Project Manager/ Engineer
Prudhoe Bay, Alaska
Advise Discipline Engineers and Superintendents on technical issues.
Maintain Project records and files through the implementation of project specification.
Monitor project cost and schedule and advise Project Manager of potential problems.
Maintain interface and working relationship with clients.
Ensure, through periodic inspection and audits, that all Project Plans and Procedures are being adhered to.
Serve as the Project Manager when out on rotation.
August 2004-Sept. 2006 Project Site Engineer
Cheyvo, Sakhalin Russia-ExxonMobil Green Field Production Facility (240,000 BPD)-$20.0B
Prepared all estimates for all construction work packages.
Reviewed all work schedules that were prepared by Project Controls.
Liaison between Quality Control and Field Construction Supervision.
Directed the day-to-day operation of all construction in the O.P.F. to include all civil work, pile driving, and piping.
ABB Lummus Global Inc.
Houston, Texas
Oct 2001-August 2004 Project Team: Team Engineer
Conduct P& ID review along with ISO review for constructability.
Identify all systems for construction planning.
Review man hours and manpower to meet construction planning for each system.
July 2000-Oct 2001 Commissioning/Start Up Engineer
Port Arthur, Texas- BASF-FINA Ethylene Production-$1.8B
Liaison between clients on process system turnover.
Coordinate Initial Operation personnel and BASF personnel walk-throw and PSSR (process startup and safety review).
Carried out all testing, flushing, walkdown of all lines prior to
commissioning and start-up of system.
July 1999-May 2000 Commissioning/Start Up Engineer
Yanbu, Saudi Arabia –Project Yanpet Ethylene Expansion Project-$1.3B
Supervised the construction of all towers, vessels, and static equipment before mechanical turnover to the client.
Assisted construction with P&ID and isometric walk down before mechanical turnover to the client.
Carried out all testing, flushing, blow down, and reinstatement of all lines.
Assisted in all pre-commissioning activities for startup.
Kirkland Commissioning Inc. Houston, Texas
May 1998-March 1999 Commissioning/Start-up Engineer
Tiffernine, Algeria-Project: Repsol (20,000 a day oil Production Facility)
Inspection of all mechanical piping and static equipment prior to start-up of each system.
Assisted in all systems pre-commissioning, startup, and running of the facility.
M. W. Kellogg Company Houston, Texas
April 1996-Aprill 1998 Area Construction Engineer
Hassi Messound, Algeria –Project: Arco Oil Enhancement Recovery
First person on site; directed all topographic and geological surveys site.
Designed, procured, and directed all work pertaining to the infrastructure.
Secured all bids, wrote Scope of Work for subcontractors, and made technical reviews of equipment.
Supervised all civil and underground piping work in the I.S.B.L. and
O.S.B.L. area and all Quality Assurance related work.
August 1994-April 1996 Chief Construction Engineer
Oran, Algeria Project: Sonatrach LNG Renovation of GL2- $1.2B
Over saw document control.
Directed all work of vendor service men on site.
Provided direction to all field construction supervision
Reviewed and signed off all field revised drawings.
Reviewed all extra material required outside of work.
Stubbs Overbeck Beaumont, Texas
April 1992 –August 1994 Site Construction Engineer
Project: Huntsman Petrochemical Company
Provided support for construction and startup of PO/MTBE unit Ballas
J. T. Hitt Construction Company Groves, Texas
September 1991-April 1992 Onsite Field Engineer
Project: Huntsman Petrochemical Company
Support to all field construction personnel.
U. S. Marine Corps-1985 thru 1991 SPECIAL SKILLS
Basic communications in Arabic and French language. Proficient in various computer software.
EDUCATION
Bachelor of Science, Industrial Engineering (BS) 1985 Lamar University, Beaumont, Texas