To: HRD Manager
Dear Sir/Madam
I have got information about career opportunity in your company. I am interested and challenged to join and have a career in your company. My name is Gede Bima Nugraha, I am alumnus from Department of Industrial Engineering, Sepuluh November Institute for GPA 3.02 (scale 4)
Nowadays, I’ve some experiance working in electronic part manufacturer, PT Omron Manufacturing of Indonesia as Production Relay Supervisor and automotive part manufacturer, for the first PT Astra Juoku Indonesia as Industrial Engineering Supervisor and the last PT Valeo Pyeonghwa Asean Transmission as Quality Control Supervisor. I’ve got a lot of experience and knowledge about total production control, how to manage people, TPM, TQM and 5S implementation etc. I have experience to manage subordinate more than 100 people in production area including operator and control staff. I have strong knowledge and understanding to implement of IE (industrial engineering) technic as a tools to reduce the lost and to increase the effectiveness at job side. With my qualification I state above, I believe I will be able to contribute effectively to your company. I would like to express my gratitude for your attention and hopefully could follow your recruitment test quickly.
(Gede Bima Nugraha)
CURRICULUM VITAE
Personal Data
Gede Bima Nugraha S.T
Jln Patih Jelantik No 11
Kab Karangasem – BALI 80811
HP : +628-****-**-***
E-mail: ***************@*****.***
Gender : Male
Place & Date of Birth : Surabaya, April 19th, 1988 Religion : Hindu
Nationality : Indonesia
Marital Status : Single
Career History and Experience
2013 – 2017: Production Relay Supervisor (PT.Omron Manufacturing of Indonesia), in charge for production arrangement and ensuring the productivity & quality target achievement.
2014 – 2015: Leader Group TPM of RSB Team - Relay Sing Bejo -
(PT.Omron Manufacturing of Indonesia), Responsible to scheduling, executions, monitoring & optimizing TPM activity Step 0 & Step 1.
2015 – 2016: Mentor TPM Relay (PT. Omron Manufacturing of Indonesia), Responsible to teaching, directions, motivate for TPM Knowledge to Subordinate
2017 – 2020: Industrial Engineering Supervisor (PT. Astra Juoku Indonesia), in charge for production arrangement and improvement for new project or where are establised
2021 – 2022 : Production Supervisor (PT. Valeo Pyeonghwa Asean Transmission), in charge Manage People, arrange schedule for production, arrange maintenance routine schedule for machine
2022 – now : Quality Control Supervisor (PT. Valeo Pyeonghwa Asean Transmission), in charge for Quality Assurance built the system for new project or new model and Quality Control for routine activity
The Latest Best Achievement
2013 : Increasing Efficiency GU5 Production Line from 85% until 92%, The main activity are :
TPM (Total Preventive Maintenance) Implementation to improved the machinery performance. By TPM activity, we could maximizing our current asset to reach the maximum performance & zero investment. 2015 : Decreasing Productivity Time at G7L STD, G7L B Type, GU5, SOCKET, G8PT Lines, The main activity are :
IE (Industrial Engineering) Technic implementation at Production area to increaase the capacity & Reduce The operator Number with zero Investment. Main activity are :
a. Machine speed up
b. Process sequence & Layout improvement
c. Operator Motion Improvement
d. Balance Lost Improvement
By those activity we could increase the capacity with Zero investment and also reduce the operator number
2016 : Established Line G9TA Welding, The main activity are : a. Increasing Capacity 200 K to 400K pcs per month b. Reduce Cycle Time for model G9TA Melcoida from 5 to 3 seconds c. Operator Operator from 24 to 18 Operators
d. Reduce rejection disposal from 10% to 7%
2017 : Established D14D Poroducts, The main activity are : a. Delivery and initial massproduction smoothly
b. Increasing Capacity 4K to 8K pcs per month
2018 : Balancing Loading Capacity, The main activity are : a. Move some model to another line which similar process and low loading capacity
b. Increasing or modified some jig and machine process c. Relayout line
2018 : Building Expansion for K07A model, The main activity are : a. Additional new production shop floor include Mechanical Engineering equipment, such as Electrical Power, Air Supply, Water, and Piping b. Installing machine production for Plastic Injection Machine, Painting Machine, Oven Machine and Assembly Machine
c. Installing Air Compressor Machine, Water Chiller Machine, HVAC equipment for painting, and Trafo machine
2019 : Established K70A Poroducts, The main activity are : a. Delivery and initial massproduction smoothly
b. Increasing Capacity 2K to 2,2K pcs per month
2021 : Established Hyundai KS & SU2ID Poroducts, The main activity are : a. Preparation trail for tooling, scheduling, manpower, material b. Preparation for audit until we can produce for the mass production steps 2022 : Established Suzuki Y4L New Change Material Improvement, The main activity are :
a. Preparation trail for tooling, scheduling, manpower, material b. Preparation for audit until we can produce for the mass production steps
Daily Job Desk
1. Control the target of Productivity and Quality performance 2. Increasing knowledge subordinate skill
3. Get the idea improvement to reduce losses process at assembly process
Training Attend
2013 : Leadership – PT. Omron Manufacturing of Indonesia. 2014 : TPM Basic (Total Preventive Maintenance) – PT. Omron Manufacturing of Indonesia
2014 : BUSINESS MANAGERS PROGRAM – PT. Omron Manufacturing of Indonesia 2014 : Mengembangkan Karakter yang Positif dan Kuat 2018 : Training TPS Batch XIV – PT Astra Daihatsu Motor 2018 : AOP Basic Development Program – Astra Otoparts Head Office 2018 : TQM Basic : QC Effectiveness – Astra Otoparts Head Office
Experience and Self Description
1. Manufacturing Control
Almost 2 years I have experience in total manufacturing control. I have familiarity to manage many people in production section. Currently my subordinate is more than 150 people in production. I am able to control all production parameter such as productivity level, quality level, machinery maintenance, and training production staff to secure the production target that has been set. Achieving the company target is my priority thru production target realization. Ensuring the SOP implementation at production area is one of tools to secure the production target. 2. TPM (Total Preventive Maintenance)
Strong understanding to implement Total Preventive Maintenance (TPM) in daily operation to reduce lost that caused from machinery problem. TPM is tools to do analyzing, improving and maintaining of machine performance. I have experiences to implement TPM Step 0, 1, 2, 3. This step is concerning to ensuring safety for human & product, restoration of machine condition, machine lubrication system and manufacturing cost reduction. 3. IE (Industrial Engineering ) Skill
Have strong & good understanding to implement IE (Industrial Engineering) in daily operation. IE is tools to reduce lost and added value improvement that related with motion operator, job mapping, sequence process improvement and useless process mapping. Main methods of IE implementation are ECRS concept (Eliminate, Combined & separation, Replacement & substitution, Simplify). With ECRS concept will have kaizen with low cost investment. Tools that familiar uses on IE are: a. Direct Time Study (DTS)
b. Balance Lost (BL)
c. Work Sampling (WS)
d. Process Analysis
e. Ready Work Factor (RWF)
The tools of IE will be helping us to find the inefficient process and potential lost cost to be Improve.
4. QC Seventh Tools Implementations
I have familiarity to implement QC Seventh Tools on daily operation to find the real caused of problem and take the full prove countermeasure. QC Seventh Tools is method to collect data, summarized, analyzing and defined the real caused of the problem.
Computer & Language Skill
Computer & software : - Minitab 14
- MS.Office (Power Point, Word, Excel)
Language capability : - English
Education Background
SD Cenderawasih III, Tangerang 1994 – 2000
SMP Negeri 110 Jakarta 2000 – 2003
SMU Negeri 90 Jakarta 2003 – 2006
Sepuluh Nopember of Surabaya Institute ( Industrial Engineering ) 2006 – 2012 The information is true and correct to the best of my knowledge, and that the above personal data may be used as record of past experience and education. I have no objection to have your investigating concerning this personal data. I would like to joint at your company because it is a great challenge and suitable with my experiences background and education. I will glad to meet you for interview.