Post Job Free
Sign in

Skilled Electrical Foreman and Supervisor

Location:
Porac, Pampanga, Philippines
Posted:
January 28, 2026

Contact this candidate

Resume:

Alexander Lim Narvasa

**********@*****.***

090******** +639*********

Present Address:

Tolentino Apartment #1 Universal st. manibaug paralaya,

porac 2008, Pampanga, Philippines

Basic Information

Age Birth Date Gender Civil Status

55 Jul 05, 1970 Male Married

Height (cm) Weight (kg) Nationality Religion

185.47 100 Filipino Christianity - Catholic

Work Experience

I have been working for 23.73 years

Sep 2023 - Nov 2024 ELECTRICIAN

(1 Year, 2 Months) PHC

Construction / Building / Engineering

Dededo, Guam US Territory

As electrician working and responsible for lighting works, conduit works

, box setting, block out preparation,, grounding system, fabrication of

boxes for outlet and data, support preparation and installation, piping lay

out for concrete, gen set preparation, temp. lighting, cable tray and ladder

installation, wiring and termination pls. NOTE all electrical works has

been done under the supervision of NAVFAC, and following under NEC

(National Electrical Codes) rules and regulation.

Apr 2023 - Aug 2023 Electrical Foreman

(4 Months, 4 Weeks) R.C. RAMOS Construction Corporation

Construction / Building / Engineering

194 Quezon Rd. Brgy San Roque Mexico Pampanga Philippines

High Rise Building Project - In charge / Working for electrical works of

the proposed 8 storey hospital building located Mcarthur hiway Villasis

Pangasinan NAME METRO PANGASINAN HOSPITAL and MEDICAL

CENTER.

RESPONSIBLE for electrical works / handling total of 8 electrician

manpower for different type/scope of works as follow pipe laying for

concrete works, box setting preparation and installation, grounding / cald

welding works, lighting and power installation including temp. power

connection thru power generator, panel installation, cable tray / ladder

installation, cable pulling, termination works, perimeter lighting and

materials in charge.

Dec 2018 - Oct 2019 Electrical Foreman / Supervisor

(10 Months, 4 Weeks) Andritz Hydro Power Plant

Energy (Electrical Power & Petroleum)

Xayaburi, Laos

Working in charge/responsible for all electrical works from conduit lay out

, cable pulling, cable ladder installation, panel erection, termination

(power cable, control cable, fire dumper instrument, smoke detector,

exhaust fan / motor, auxillary transformer, including for PLC installation

) grounding, glanding, lighting installation, battery charging, motor sole

run / testing, GIS structural assembly.

Maintenance Dept. responsible working in any electrical related

complaints also some activity together with commmissioning team of

Andritz, Documentation / Monitoring site activity especially turbine unit

#1 to #8, all related electrical panel in POWER HOUSE ADB, UEDB,

EXCITATION PANEL,LIGHTING and SMALL POWER, LOW

VOLTAGE SWITCH GEAR,AUXILLIARY TRANSFORMER,

CONTROL PANEL, BATTERY CHARGERS, HVAC CONTROLLED

PANEL, VAC SYSTEM,22 KV PANEL, 6.6 KV PANEL, Pump

station 1 and 2 documentation both for drainage and de watering system

,vac system, lighting and small power,low voltage switch gear,

Emergency Diesel Generator area, Spillway and Navigation lack control

building, LBAP area, battery room in (Office floor, 115KV control bldg,

navigation lock, spillway, ps1 and ps2), street lighting surrounding

navigation control building,spillway, power house and 115 KV control

bldg, ps1 and ps2 . acquization of permit system is also required in some

high isolated location

coordinate with client for the approval of the punch list works together

with Andritz QA/QC, do maintenance works

Mar 2015 - May 2018 MEP (ELECTRICAL) FOREMAN / SAFETY OFFICER

(3 Years, 2 Months) LEIGHTON CONSTRUCTING QATAR WLL (HLG)

Construction / Building / Engineering

Al Jassim Bldg. DOHA, QATAR

NEW ORBITAL HIGHWAY 3 and MANATECH - 3

Infrustracture Project:

Supervising / working all electrical duct bank work particularly in all

crossing pipes High Voltage pipes, street lighting, SSD, QAF, EN6,

Oreedoo, Medium and Low Voltage, cable pulling, Termination/

glanding, Panel erection, meggering and site generator works.

responsible for MEP works for all project junction offices installation of

lighting and power system as per site office required, assisting hvac

personnel for the installation of aircon unit as per office and arranging

water piping system as office required. handle maintenance works for MEP

works

In charge in utilities department / earthworks /construction site utilities

piping lay out, cable pulling, street lighting, trial pit, earthing works,

generator section, other MEP works, manpower in charge, materials

preparation,safety in working area. Earthworks in charge cutting edge,

dumping,compacting, bench marking, equipment monitoring, crushing

machine daily production,quantity surveyor, traffic management,

signages and safety works.

other duty and responsibility SITE SAFETY OFFICER conducting toolbox

meeting, managing RISK ACCESSMENT AS PER WORK LOCATION,

checking moving equipment on site, barricading open space, checking

scaffolding status putting tagging card ok to use or not, facilitate /

providing / inspect water availabilities in site, checking every manpower

regarding on there PPE, if they following procedure about excavation

works, confine space and permit to work procedure.

Mar 2014 - Sep 2014 Foreman / Supervisor

(6 Months, 4 Weeks) Al Babtain Constructing Company

Energy (Electrical Power & Petroleum)

Al Malaz Riyadh KSA

In charge / working in electrical department for the newly awarded sub

station project at ras al khair jubail ksa, settling generator,cable pulling of

120 mm2 power cable, providing temporary supply for the forta cabin of

rc and sceco offices,perimeter lighting, earthing works including cald

welding of 240, 120,50 bare copper on site and each forta cabin

Jan 2013 - Jan 2014 Foreman/supervisor

(1 Year, 4 Weeks) Saudi Service For Electro Mechanical Works Ltd.

Energy (Electrical Power & Petroleum)

Riyadh, KSA

1. Salboukh Water Project – National Water Corporation or N.W.C.-

Riyadh Over all in charge/working in electrical works in cable pulling,

cable tagging, lube checking, r.o. sole run, grounding, panel termination,

cable termination, cctv installation,perimeter lighting, materials

preparation, generator section, electrical complaint and other electrical

related works. (project-finished) 2. 380kva/110kva sub-station- TAIF,

(CENTRAL 2) MAKKAH In charge/working in installation of gis

materials and steel structural for 380kva substation and electrical works as

follow cable pulling,lube checking, cable tagging, earthing /grounding,

panel installation,ac/dc lighting,cable termination, conduit works,

lighting and power installation,manpower supervision,materials

preparation, safety on working area. (project-finished) 3. 380kva / 132kva

sub-station – bisha, (Jeddah) In charge/working in ELECTRICAL as

follow cable ladder installation, earthing / grounding of all building of the

sub-station (inside and outside), control building preparation (construction)

, cable pulling, fire alarm, ac/dc lighting, panel installation, GIS erection

, termination, materials preparation, complaint and other electrical related

works.

Feb 2012 - Nov 2012 Electrical Foreman

(9 Months, 4 Weeks) Sam Young Corporation

Oil / Gas

Algeria Africa

As electrical foreman I am in-charge in scheduling / assigning manpower,

tools preparation, safety on working place, supervision and Assisting

Q.A./Q.C. for inspection of electrical installation, also in-charge in cable

pulling, cable dressing, cable tray installation, motor sole run, termination,

Lube checking, cable tagging, panel installation, maggering and many

more related in electrical works.

Apr 2010 - May 2011 Electrical Low/medium Voltage Foreman

(1 Year, 1 Month) Saudi Services Contructing Ltd-SSCL (Operation & Maintenance)

Construction / Building / Engineering

Alrawdaw Jeddah K.s.a.

As a Electrical foreman I 'am responsible to the day to day activities of the

hajj terminal airport regarding on preventive and actual maintenance of all

electrical room and transformer room (low voltage and medium voltage) in

plaza and terminal area KAIA-Hajj Terminal jeddah,k.s.a. responsible also

in night duty as over all in charge in maintenance electrical division

Apr 2009 - Apr 2010 Electrical Low Voltage-foreman

(1 Year, 4 Weeks) Saudi Binladin Group (Operation & Maintenance)

Repair & Maintenance Services

Alrawdah Jeddah Saudi Arabia

As Electrical low voltage foreman I am in charge in the day to day

basis,for the daily inspection routine such as checking/inspection of

electrical facilities,(electrical room,pump room,transformer room,ECB

room,panel distribution for medium and low voltage,generator schedule

test)putting record on logbook for PPM predicted and preventive

maintenance,designate all my electrical personel for their day to day

assignment,schedule and on call complaint.facilitate wiring

installation,such as wiring

Reinstallation,replacement,extention,troubleshooting, PLC

MAINTENANCE and installing fixture and make sure all is normally

working 24/7, and other electrical apparatus even installation of ventilation

/ airconditioning unit. Im working here as ELECTRICAL LOW

VOLTAGE-FOREMAN list of my previous project: 1.King Abdullasis

private villa in Riyadh K.S.A. 2.Central Headquarter of Binladin group in

Jeddah K.S.A. 3.Prince Salman Palace in Jeddah K.S.A. 4.King Abdullasis

Palace in Jeddah K.S.A. 5.King Faisal Hospital in Jeddah K.S.A.

Nov 1995 - Dec 2008 Contractor / ELECTRICIAN

(13 Years, 1 Month) MERALCO

Energy (Electrical Power & Petroleum)

KaMaNaVa Meralco Branches

As electrical contractor / electrician I'm the one in charge starting on the

processing of pertinent documents related on the project, preparing and

presentation of proposed electrical plan,blue printing,processing of all

necessary permits, actual layout and checking/ materials preparation, local

government approval, execution.

project including residential, commercial and industrial works from

service entrance installation going to main distribution panel, complete

installation piping installation, lighting and power installation, cable

pulling, termination, fixture installation, testing / energization / turn over

to owner.

Educational Attainment

Jun 1987 - Oct 1988 International Electronic And Technical Institute

Bachelor's / College Degree

electrical

Jun 1983 - Apr 1987 Malabon Municipal High School

High School Diploma

Licenses / Certifications

Apr 12, 2024 Safety Excellence Award BEQ 5 PLEX MILITARY

HOUSING PROJECT

H2B BEQ5PLEX

Mar 08, 2024 SAFETY LADDER SAFETY CERTIFICATE

H2B BEQ5PLEX

Mar 03, 2024 SAFETY FUNDAMENTAL of FALL PROTECTION

CERTIFICATE - OSHA

H2B BEQ5PLEX

Feb 25, 2024 SAFETY CONFINED SPACE CERTIFICATE - OSHA

H2B BEQ5PLEX

Feb 24, 2024 SAFETY EVERYDAY ERGONOMICS CERTIFICATE -

OSHA

H2B BEQ5PLEX

Jan 27, 2024 SAFETY JOB HAZARD ANALYSIS (JHA)

CERTIFICATE - OSHA

H2B BEQ5PLEX

Jan 27, 2024 SAFETY PERSONAL PROTECTION EQUIPMENT (PPE)

CERTIFICATE - OSHA

H2B BEQ5PLEX

Jan 22, 2024 SAFETY FALL PROTECTION for CONSTRUCTION

CERTIFICATION - OSHA

H2B BEQ5PLEX

Jan 22, 2024 SAFETY RECORDKEEPING and REPORTING

CERTIFICATE -OSHA

H2B BEQ5PLEX

Jan 21, 2024 SAFETY HEAT ILLNESS PREVENTION

CERTIFICATE - OSHA

H2B BEQ5PLEX

Jan 21, 2024 SAFETY LOCK OUT TAG OUT CERTIFICATE - OSHA

H2B BEQ5PLEX

Jan 21, 2024 SAFETY SILICA SAFETY CERTIFICATE - OSHA

H2B BEQ5PLEX

Sep 30, 2023 SAFETY 16 HRS TRAINING

H2B BEQ5PLEX

Mar 19, 2019 BASIC RIGGING AND SLINGING CERTIFICATE -

VIBRANT CONSULTANCY W.L.L.

VC02720160404

Oct 10, 2015 OSHA 30 FOR CONSTRUCTION CERTIFICATE -

VIBRANT CONSULTANCY W.L.L. (QATAR)

VC300SH2015147

Jun 18, 2015 MANAGING SAFELY I.O.S.H. CERTIFICATE - STAR

SKILLS & CONSULTING LTD.

CERT. NUMBER 264322

Government Documents

Passport ID Number: P8432835A

Place of Issue: DFA-Angeles

Date of Expiration: Aug 19, 2028

NBI Clearance ID Number: N612GAER07-AP2940692

Date of Expiration: Nov 29, 2025

Trainings / Seminars

Oct 25, 2019 - Oct 25, 2019 CCTV

ANDRITZ HYDRO-China

XAYABURI, LAOS

Oct 21, 2019 - Oct 22, 2019 Hydralic Governor

ANDRITZ HYDRO

XAYABURI, LAOS

Oct 18, 2019 - Oct 19, 2019 Kone Crane 380 tons

Kone Crane

XAYABURI, LAOS

Oct 15, 2019 - Oct 18, 2019 Electronic Governor

ANDRITZ HYDRO

XAYABURI, LAOS

Sep 27, 2019 - Sep 28, 2019 Diesel Generator

ANDRITZ HYDRO-China

XAYABURI, LAOS

Sep 05, 2019 - Sep 06, 2019 Security System, Real Time Clock, VHF and radio system,

Loud Speaker System

ANDRITZ HYDRO

XAYABURI, LAOS

Aug 30, 2019 - Aug 30, 2019 EXCITATION SYSTEM

ANDRITZ HYDRO

XAYABURI, LAOS

Aug 28, 2019 - Aug 28, 2019 Protection System

ANDRITZ HYDRO

XAYABURI, LAOS

Skills Foreman / Supervisor Gen. Foreman / Supervisor Electrical low and

medium voltage-foreman Free Lance Electrical Contractor Electrical

Foreman / Supervisor Maintenance Foreman Electrician, Safety

Officer

Languages Filipino English ARABIC

Character References

Rommel Morales Sr. IT Personnel

Ayala Land International Sales Inc

+639*********

**********@*****.***

Francis Oliver Castro Maintenance Head

Andritz Hydro

+865**********

*******************@*****.***



Contact this candidate