SUMMARY OF QUALIFICATIONS
WORK HISTORY
BOUREKAB ALLA EDDINE
Algeria, Skikda .
Algeria Contact No: +213********* / +213*********
Email Address: ****.********@*****.***
CAREER OBJECTIVE
Obtain a challenging leadership position applying creative problem solving and lean management skills with a growing company to achieve optimum utilization of its resources and maximum profits.
Total of 7 Years’ experience working in an Oil and Gas field as Material Controller.
Enhanced & expert in handling Piping & Electrical& Instrument& Steel structure& Mechanical Equipment materials.
Flexible and can easily adapt the environment.
Posses the ability to solve problems as developed for the team.
Responsible in all my undertakings.
Computer Literate - proficient in Microsoft Office i.e (Word, Excel, web browsing, etc.)
Languages: Arabic, French, English " read, written, spoken " 2024-Mai--19 – to this day SINOPEC INTERNATIONAL PETROLEUM Algeria National Petroleum Company LNG Project ITEMS INGENIEUR SONATRACH Materials and Cost & Progress
NEW LNG TANK PROJECT SKIKDA
Duties and Responsibilities :
transporting rebars from the plant to the worksite, a total of nearly 3,000 tonnes .
check various materials with suppliers and transport them to the site.
Control of material delivery to the site.
unloading containers of equipment arriving from the port.
prepared and arranging all documents related to Material Control received from the respective Subcontractors such as acknowledged copy of Construction Material Issue Voucher (CMIV), verified copy of Construction Material Return Voucher (CMRV) and all copies of approved Request Material to be Scrapped . 2022-Mai-17 – 2023-Sept-25
SPA TRAVOCOVIA LOGISTIQUE MANAGER
PROJECT BURNS HOSPITAL & 200 VILLAS logistics department BOUZAROURA, SKIKDA. ALGERIA
Duties and Responsibilities :
The equipment needs to be received, unpacked, inspected, stored, and distributed.
Produce a Material Receipt Report (RM) when brand-new items arrive.
To detect any damage or bad material received, create a Material Exception Report
(MER) while inspecting.
Make certain that materials are stored, handled, and disposed of in a proper manner.
Ensure that all materials are properly stored and preserved.
Completing a quarterly inventory is necessary to ensure that the actual material stock matches the inventory..
Ensure that the safety data sheet (MSDS) for all materials is up-to-date and complete.
Provide assistance to the quality control inspector by inspecting newly arrived and received materials for final approval.
2018-Oct-26 – To 2020-April-25
JGC CORPORATION
ENTREPOSE MATERIAL CONTROLLER
SONATRACH Material Control Section
HASSI MESSAOUD
UPSIDE NORTH PROJECT,ALGERIA
Duties and Responsibilities :
Handling and controls of Electrical& Instrument &Mechanical Equipment &Preservation, Commissioning and Two Year Spare Parts and Special Tools.
Monitoring the arrival of each scheduled shipment as per shipping advice.
Distributing the Cargoes/Material Arrival Notice (CMAN) and relevant Packing Lists to concern section as advance information prior to actual arrival of shipment.
Preparing the following information related to material tracking status, and distributing it to concerned section and Subcontractor:
Material Status Report (MSR)
Material Receiving Report (MRR)
Packing List (PL)
Shipping Document (SD)
Preparing Material Exception Report (MER) on damaged, shortage, or non-conformed received materials.
Maintaining and arranging all documents related to Material Control received from the respective Subcontractors such as acknowledged copy of Construction Material Issue Voucher
(CMIV), verified copy of Construction Material Return Voucher (CMRV) and all copies of approved Request Material to be Scrapped (RMS)
Conducting appropriate housekeeping at least on a weekly basis in warehouses and surrounding storage yards to maintain a safe working environment. HIGHEST EDUCATIONAL ATTAINMENT
2011-Sep-03 – to 2012-Jul-05
LNG PROJECT KBR MATERIAL CONTROLLER
SUB CONTRACT LEAD C & T Materials and Cost & Progress controls Section SONATRACH
NEW LNG TRAIN SKIKDA PROJECT. ALGERIA
Duties and Responsibilities:
Developing, controlling and maintaining new material database (database that manages material transactions from the receiving to the usages phase).
Calculating quantities of material according to their sizes and specifications and generating follow-up reports.
Receiving material (Piping, Fitting, Electric and Instrumentation) from KBR Warehouse.
Verification of material (whether it’s consistent with Engineering Drawings).
Distributing material according to the Engineering Drawings.
Controlling the delivery of the material to the site.
Alpha-supervision of material inventory at the site.
Developing, controlling and maintaining new BOQ database.
Preparing BOQ (Bill of Quantity) of material according to Engineering Drawings and RFIs.
Following construction erected quantities according to the construction reports and updating the BOQ database.
Verifying actual erected quantities at the site.
Updating the actual quantities in the BOQ database and reporting them to project management.
Reporting erected quantities in weekly bases to KBR through KBR’s quantity management system (QTRAX).
2008-Oct-12 – to 2010-Jan-12
SONATRACH TRC / RTE IT section
SKIKDA REGION PETROLEUM TRANSPORTATION
SKIKDA, ALGERIA
Duties and Responsibilities:
Maintenance of computer hardware.
Maintenance of network (Cisco,wiring configuration)
Configuration of email addresses (Outlook Server).
IT Material Procurement Management (following the company procedure).
Material Inventory Management (Audit and Controlling). 2006 -2010 Mechanical engineer.
2009 - 2011 Senior management IT technician ( Technical college diploma ). 2005 -2006 Final year in electrical engineering ( Collegiate 2 ). 2007 Driving license of category B (light vehicle).