Cord, AR *****
Cell 870-***-****
Email:*******@**.***
Will Shilts
Employment
Currently have 32 years of experience in fossil, gas, combined cycle power plants, chemical processes, steel mills, general industrial services, & etc... I am proficient in Estimating, Scheduling, Cost Controls, & the Executions of Projects, Outages, & Maintenance of Mechanical services in an alliance & project framework. I have extensive experience in successfully executing work in Hard Dollar and/or time & material contract arrangements. I am well versed in scheduling in Microsoft Projects, Cost Tracking in SAP, Microsoft Excel, Word, & Work Suites. I have most recently been estimating, scheduling, Controls, & executing projects & daily maintenance for Day & Zimmermann inside of the Entergy Fossil Chain & numerous other power & Industry Avenues. I have been Solely responsible for Outages & Yearly Maintenance inside of the Entergy central & south Arkansas region for the past 9 years working under an unlimited Bid ceiling (Typically about approx.$15M yearly) while staying within the 2% to 5% variance at Project Completion & all execution of projects required in a Safe, Quality, & timely manner.
1993 – 2007 Fluor, Day & Zimmermann, MCS, CCC Group, TIC, Irondale, Systems, Rust, Prospect, Schick, McGowan Construction, & Several Others Contractors...
2007-2017 Regional Superintendent, Site Superintendent, Estimator, Cost Controls, Scheduler/Project Manager at the Entergy-WBSES, HSEF, HINDS, UNION POWER & LCSES for Day and Zimmermann
2017- Feb. 2022 Entergy Fleet - Operations Manager, Regional Superintendent, Site Superintendent, Estimator, Cost Controls, Scheduler/Project Manager at the Entergy Central & South Region Fossil & Combined Cycle Sites in Arkansas, Mississippi, & Texas - WBSES, HSEF, HINDS, SABINE, LEWIS CREEK, LAKE KATHERINE, CHOCTAW & UNION POWER for MCS
2022-Feb.2024 Estimator multiple projects in the power industry for Day & Zimmermann
2024-Oct.2025 MCS Boiler Foreman & Maint. Tubewelder & Boilermaker at ISES power plant in Arkansas
Oct. 2025-Nov.2025 – Boiler Foreman at LCRA in La Grange, Texas for Day & Simmermann
Below is a compilation of a few of the Entergy Projects that I have Planned, Scheduled, Estimated, & Executed Safely, with Top Quality, & within Budget & Schedule.
Operations Manager & Regional Superintendent
Performed Operations manager & Regional Superintendent duties with my team which included managing all maintenance & outage estimating, scheduling, cost tracking, planning, & execution of all projects & maintenance at WBSES, HSEF, & Outages & projects at LCSES & support of all other sites in the Entergy chain for Day & Zimmermann.
Independence Entergy Site-
I worked outages at ISES General Foreman, foreman, Welding Instructor, QC, Tube welding/Heavy wall pipe welding, Pipefitting, Boilermaker, Rigger, & Iron Worker - Starting in 1993 & in 2001 when I was hired by Fluor’s maintenance crew for ISES. I then became the Boiler Proper/Projects Foreman for 2002. In 2003 I was promoted to the Boiler/Projects General Foreman. A few of the Main work scopes that myself & my team pioneered while at ISES Entergy Site where the replacement of the Rear Low Temperature, Front LTSH Panels, RH DMW’s Super Heat panel Maint, HRH Jumper Tube Replacement, RH Repairs, & WW Repairs, Super Heat Division panels and Super Heat Platen panels Repairs. On the maintenance side our daily and Replace all Cold end baskets on Air Pre Heaters.
- I was also appointed the job of instituting, formatting, & instructed the very first Entergy/Fluor Welding School Program at the ISES Entergy Site during this duration.
White Bluff Entergy Site-
In 1996 I held a position with Fluor on Maint. As a Tube Welder, Heavy Wall Pipe Welder, Rigger, & Pipefitter at the WBSES. Later I became the WBSES Fluor - Site Superintendent in 2007. The following are just a sample of some Projects that I have designed, estimated, scheduled, cost tracked, provided manpower, consumables, materials, & executed safely, on schedule, managed, & within budget as WBSES Site Superintendent - Replace the Hot and intermediate baskets on the Air Pre Heaters, Replacement of all Front & Rear Low Temperature Super Heat panels, FSH DMW Projects, Installation of all new Diamond Soot blowers & Repair Main Steam lug, All Rigging Plans & repairs to Main Steam & HRH hanger systems, DA repairs, HRH Header nipple projects, RH DMW projects, RH Repairs, Drag Conveyor Rebuilds, & all Conveyor Maint. On site. Bottom Ash Outage Projects & Energy Conv. Projects including Heater Confined Space repairs & all Condenser Repairs (Installation of new Dog Bone X-joints) & all general scope per outage activities.
Lake Catherine, Couch, Lynch, Remmel Dam and Carpenter Dam Entergy Sites -
Misc. Outages and maintenance work on the gas plants in the region – Myself, Cody Martin, & Site superintendent designed, engineering lay-out, scheduling, tracking, manpower, consumables, & materials for the SH Header Replacement in 2013 & the SH & RH DMW Replacement Projects now currently being worked. Multiple Outages Estimated, Scheduled, Tracked, Executed & Planned with Fan, Burner, Water wall, & etc. Projects completed.
Moses Plant Entergy Site -
Demo & reinstallation of steam piping & misc. repairs. Including the submittal of new blue prints for piping as designed per myself & review per Entergy engineering & added to their master plant drawing. . Multiple Outages Worked & Planned.
Ritchie Plant Entergy Site –
General boiler maintenance & installation of Heavy Wall Steam Valve replacement. Foreman & HW Welder- Multiple Outages Worked & Planned.
Lynch Plant Entegy Site –
Multiple Projects & Repairs including emergency outages. . Multiple Outages Worked & Planned.
Sabine Entergy Site –
Heavy Wall repairs to main Steam Lines. (2-1/4 Chrome Piping with MWT of 4”). Multiple Outages Worked & Planned. Operations Manager over Maintenace & All Outage Projects.
Gerald Andrus Entergy Site -
RH Header Replacement (Made all Main lead to header welds (30” X 6” MWT-2-1/4 Chrome) & WW downcomer HW welds, Demo of Existing Header, Coordinated Rigger Removal & installation of existing header. Demo & new header installation)
Jumper Tube Installation Project
RH Pendant Replacements Project
Choctaw Entergy Site -
Operations Manager over Site Maintenance & Site Outage. Responsible for Cost Tracking, Accruals, Estimates, Scheduling, Materials, & Project Executions. Manager over Site Outage activities & Drum Enclosure Projects
Sabine Entegy Site -
Operations Manager over Site Maintenance & Site Outage. Responsible for Cost Tracking, Accruals, Estimates, Scheduling, Materials, & Project Executions.
Union Entergy Site -
Operations Manager over Site Maintenance & Site Outage. Responsible for Cost Tracking, Accruals, Estimates, Scheduling, Materials, & Project Executions.
All above stated work in the Entergy Chain is a partial list of Projects & Tasks executed for Entergy & other Industrial & Power Plants. If further information is required, please just notify me.
Work History Summary:
-Boiler Foreman – LCRA Power Station (La Grange, TX)
Supervise Boiler Outage & Work Scopes for repairs upon Inspections.
FSH-Loop change out, Economizer Tubing replacements, Waterwall Replacements, & Attachment Repairs.
Oct. 2025 Thru Dec. 2025 for Day & Zimmermann
-Boiler Foreman & Maint. Tubewelder & Boilermaker (ISES Power Plant – Arkansas)
Supervise Boiler Outages & Work Scopes to be performed during the Outages. Perform typical Maint. Repairs during non-outage fun times & perform Emergency Repairs as needed.
Feb. 2024 Thru Oct. 2025 for MCS
-Estimator for Day & Zimmermann (Multiple Power & Industrial Facilities)
Estimated T&M & Hard Dollar Projects across a range of different Scopes & facilities.
2022 Thru 2023 Day & Zimmermann
- Operations Manager (Entergy Fleet - Arkansas, Mississippi, & Texas Sites)
Estimated time and material & Hard dollar work scopes on Air Heater, Boiler Work, All Capital Projects & Special Projects, Duct Work, Bottom ash and Misc. Piping Jobs. Developed schedule in Microsoft Projects, Ordered materials, tools and consumables for work scope. Over saw maintenance crew during non-outage, worked with plant to schedule and perform maintenance related issues while plants are on line. Oversight for all Entergy Projects & Outages. Plant relations & Planning.
2017 Thru March-2022 MCS Arkansas,Texas, & Mississippi
- Regional Superintendent (WBSES, HSEF, HINDS, & UNION POWER - Entergy Sites)
Estimated time and material & Hard dollar work scopes on Air Heater, Boiler Work, All Capital Projects & Special Projects, Duct Work, Bottom ash and Misc. Piping Jobs. Developed schedule in Microsoft Projects, Ordered materials, tools and consumables for work scope. Over seen maintenance crew during non-outage, worked with plant to schedule and perform maintenance related issues while plants are on line. Just to name a few key Projects --- WBSES-RH Front Pendant Panel Replacement projects, LCSES- SH Header Replacement, Gerald Andrus - RH Header Replacement & RH Jumper Tube Repayment, WBSES – HRH Header Tube Stub (Jumper Tube) Replacement, ISES & WBSES – LTSH Front & Rear Panel Replacements, WBSES & ISES – RH DMW & RH Maint. Projects, WBSES-FSH DMW Replacements, APH Hot, Intermediate, & Cold Basket Replacement, Bearing PM’s, APH Seal & Duct upgrades & Projects. WBSES – Lower Countant Waterwall Replacement, WBSES – Upper Countant Waterwall Replacement, WBSES HRH & Main Steam Piping Support Hanger Replacement Projects, HSEF – Combined Cycle Units Maint. & 9% Chrome HRH fabrication & Repairs, -HINDS – HRH Piping & Support Hanger Repairs, Expansion joint Replacements, Boiler Penetration Replacements, and Structural Mods. etc...
2017 MCS Central & South
Regional Superintendent (WBSES, HSEF, HINDS, UNION POWER & LCSES Entergy Sites)
Estimated time and material & Hard dollar work scopes on Air Heater, Boiler Work, All Capital Projects & Special Projects, Duct Work, Bottom ash and Misc. Piping Jobs. Developed schedule in Microsoft Projects, Ordered materials, tools and consumables for work scope. Over seen maintenance crew during non-outage, worked with plant to schedule and perform maintenance related issues while plants are on line. Just to name a few key Projects --- WBSES-RH Front Pendant Panel Replacement projects, LCSES- SH Header Replacement, Gerald Andrus - RH Header Replacement & RH Jumper Tube Repayment, WBSES – HRH Header Tube Stub (Jumper Tube) Replacement, ISES & WBSES – LTSH Front & Rear Panel Replacements, WBSES & ISES – RH DMW & RH Maint. Projects, WBSES-FSH DMW Replacements, APH Hot, Intermediate, & Cold Basket Replacement, Bearing PM’s, APH Seal & Duct upgrades & Projects. WBSES – Lower Countant Waterwall Replacement, WBSES – Upper Countant Waterwall Replacement, WBSES HRH & Main Steam Piping Support Hanger Replacement Projects, HSEF – Combined Cycle Units Maint. & 9% Chrome HRH fabrication & Repairs, -HINDS – HRH Piping & Support Hanger Repairs, Expansion joint Replacements, Boiler Penetration Replacements, and Structural Mods. etc...
2007 - 2017 Day & Zimmermann Central & South AR
Site Superintendent (WBSES) -
Estimated time and material work scopes on Air Heater, Boiler Work, Duct Work, Precipitators, Bottom ash and Misc. Piping Jobs. Developed schedule in Projects, Ordered materials, tools and consumables for work scope. Over seen maintenance crew during non-outage, worked with plant to schedule and perform maintenance related issues while plants are on line. Key Projects that I Estimated, Scheduled, Devised Rigging & Execution Plans, Provided all tooling, materials, consumables, & Executed Safely is the WBSES – Economizer Complete Element Change-Out & APH Inlet Duct Work Demo & Install... while doing the typical Major Outage work
2007-2013 Day & Zimmermann Redfield, AR
Site Superintendent (WBSES) -
Estimated time and material work scopes on Air Heater, Boiler Work, Duct Work, Precipitators, Bottom ash and Misc. Piping Jobs. Developed schedule in Projects, Ordered materials, tools and consumables for work scope. Over seen maintenance crew during non-outage, worked with plant to schedule and perform maintenance related issues while plants are on line. Key Projects that I Estimated, Scheduled, Devised Rigging & Execution Plans, Provided all tooling, materials, consumables, & Executed Safely is the WBSES – Economizer Complete Element Change-Out & APH Inlet Duct Work Demo & Install... while doing the typical Major Outage work
2006-2007 Fluor Redfield, AR
General Foreman -
Duties included working with client one on one basis to repair outage inspection reports in the boiler and the piping and valve repairs. Worked multiple Boiler Crews to meet Safety expectation, schedule, & Quality for all outage related scope & projects.
2003-2006 Fluor Newark, AR
Welding Instructor, General Foreman, & NDE Visual, MT, & PT Welding Inspector
Built all curriculums & instructing methods for the instruction of welding students for their use at all Entergy Sites. Certified All students using SMAW & GTAW welding processes. Inspected all emergency outage weld repairs to the ISES Units. Instructed maintenance crew on repair plans & processes.
2003-2007 Fluor Newark, AR
Foreman
Instructed Boiler Crews in job scope for outages & insured safe & quality work to be performed. Assisted in Boiler Inspections & Repair Plans.
2001- 2002 Fluor Newark, AR
Foreman/Pipefitter/Pipe Welder/Tank Builder
Instructed Crews on the erection & fabrication of Lime Stone Kiln. Fit & welded Kiln Sections into position. Fit-up Required tank bands & welded. Installed Tanks & all piping associated with Kiln operations.
2000 CCC Group Cushman, AR
Tube Welder/Boilermaker
Replacement of RH jumper tubes to RH Header.at Entergy Gerald Andrus Site.
1999 Fluor Greenville, MS
Pipe Welder/ Pipefitter
Frito-Lay Site- Field Fabricated and installed piping from drawings and field routing to machinery & installation of vessels & fire protection.
1998 Fluor Jonesborough, AR
Pipefitter/Pipe Welder
Fit-up & Welded using multiple processes all high pressure & heavy wall piping & mechanical joint piping for hydraulics, steam, water, & etc. During the build of the Trico Jumbo Steel Mill.
1997 TIC Decatur, AL
Pipefitter/Pipe Welder/Rigger
Fit-up, Welding, & installation of piping using multiple processes in conjunction with Raytheon engineering at the Arkansas Eastman Chemical Plant.
1996 Rust/Day & Zimmermann Batesville, AR
Tube Welder/Heavy Wall Pipe Welde
Piping & General Maint. At the WBSES
1997 Fluor Redfield, AR
Tube Welder/Boiler Make
Installation of Economizer DMW’s & WW Repairs.
1997 MCS Sioux City. IA
Tube Welder/Heavy Wall Pipe Welder
RH Header Installation at the Gerald Andrus Entergy Site
1996 Fluor Greenville, MS
Heavy Wall Pipe Welder/ Tube Welder/ Boilermaker
Make all required heavy wall Super Heat downcomer fit-up & welds. SH Division Panel Dutchmen & Alignment Repairs, RH Dutchmen, shields, & Repairs. Back pass Repairs, & etc.
1994 Fluor Newark, AR
Pipe Welder/Pipefitter
Fabrication & mods. to 5NO1 chemical process building – Retrofit & fabricate all associated piping & vessels for new processes.
1994 Fluor Batesville, AR
Pipe Welder/Pipefitter
Fabrication of Piping (SS, PTL, Fiber Cast, Hastaloy, Inconel, Carbon, and Chrome) routes per Raytheon Engineering as Required for Arkansas Eastman Chemical Company. Also the youngest welder to date to certified in multiply processes (SMAW, GTAW, Mig, & Pulse Arc.)with Eastman Chemical (1993)
1993 Fluor Batesville, AR
Laborer/Iron Worker/Structural Welder/ Boiler Maker
Major Outage-ISES – Complete Water Wall, Bottom Ash Change out & Unit Structure Alignment
1993 Fluor Newark, AR
I have worked for & on numerous more sites & Industrial Companies & multiple projects across the country with several other companies during the last 23 years & if further job experience is required I can elaborate on my complete work history. As the above is just the ones that I felt were pertinent for this application. Also during all the projects & tasks that are above I also worked almost every outage Spring, Fall, RCD, & etc. in the Entergy chain while working the above stated projects around the outage seasons.
Education
1993 Sulphur Rock High School Sulphur Rock, AR
Diploma Obtained
Additional professional activities
Completed Managing Projects course
Fall prevention & Protection Supervisor training
Ethics Training
CPR Trained
Heart Saver First Aid
Fresh Air Welding-Certified
Coal Fire Prevention Trained
Confined Space Certified
FIT Tested
Trenching Competent Person Training
OSHA 10-Hour
OSHA 30-Hour
Power Safe
TWIC
Welding Instructor
Certified QC Visual & NDE - Per Vertigas Insurance (used by Arkansas State Boiler Inspections & Entergy Arkansas State Inspections)
Additional Certifications –
Regional Superintendent
Site Superintendent
Estimator
Project Scheduling & Microsoft Projects
Cost Tracking - SAP
General Foreman,
Boiler Maker,
Pipefitter,
Rigger,
Iron Worker,
Small Equipment Operator – Lull up to 60 ton Crane
Structural Welder,
Pipe Welder,
Tube Welder,
Combination Welder, &
Heavy Wall Welder
Poly Pipe Certified
PTL Certified
Fluent with the Microsoft Office Suites – Word, Excel, Projects, & Etc.
Welding Certifications are for Multiple Processes & Materials--(SS, Carbon, Chrome, 9% Chrome, Inconel, Hastaloy, Aluminum, & various other alloys) in all processes – SMAW, GTAW, MIG, Pulse Arc & etc.up to unlimited MWT.
I have also worked for & been certified with numerous other industrial companies with the fields ranging from Arkansas Eastman Chemical (Piping & Tanks), Trico Jumbo Mill (Piping & High Pressure Piping), to Nucor Yamato Steel Mill (Maint. – Piping & Hydraulics). Just to name a few of these companies I have performed for previous to my current employment with Day & Zimmermann - Fluor, TIC, MCS, CCC, Irondale, & several others.
References
Eugene Knighten:
Arkansas Entergy Hot Springs Electric - Plant Manager - (22 yrs.)
Mike Fallon:
Arkansas Entergy Lake Catherine Outage superintendent- (10yrs)
501-***-**** Arkansas
David Murray:
Arkansas Entergy El Dorado-Plant Manager- (24yrs)
Steven Reynolds:
Arkansas Entergy WBSES Project/Engineer - (12yrs)
Stacy Boncheff:
Arkansas Entergy White Bluff Outage Superintendent- (11yrs)
Cowan Gray
Arkansas Entergy White Bluff Production Superintendent- (14yrs)
Charlie Skaggs
Arkansas Entergy - ISES - Steam Process Superintendent (20yrs)