Summary of Qualifications

Over thirty years experience in fabricating and assembling oil and gas processing equipment. Experience includes over twelve years managing fabrication facilities, ten years as a Foreman/Lead Hand on numerous domestic and international projects involving shop and/or field construction plus three years as a Project Advisor/Coordinator. Dedicated, conscientious manager with the technical, safety, communication, leadership, and problem solving skills needed to oversee the construction of high-quality equipment on schedule and on budget. Employment History

Thermo Design Engineering 2017 to Present

Started as a Foreman (2017 to 2018) responsible for assembling packages and modules, then advanced to Superintendent (2018 to 2022) and Production Manager (2022 to 2024). The Production Manager role had the same responsibilities as Superintendent plus client communication, as required. Currently back in Superintendent role

(November 2024 to Present), due to restructuring.

Superintendent

• Oversee all shop operations at seven shops involved in the fabrication of components, such as piping and vessels as well as machining and some assembly

• Manage production schedules, resources, and equipment

• Coordinate handling of all components between fabrication, subcontractors, and assembly

• Analyze data and prepare reports on production metrics for management

• Improve production processes to increase efficiency, e.g., quadrupled production in pipe shop and developed system to better track all components

• Lead, develop and oversee production team, including hiring, training, and performance monitoring and feedback

• Ensure work is completed using high safety and quality standards, with all components meeting job specifications and internal requirements

• Maintain clear and concise communication with management, project management, engineering, drafting and design, purchasing, quality control, operations, subcontractors, and inspectors Notable Project Experience at Thermo Design Engineering

CSV Albright Gas Plant, Sulphur Recovery Unit

Wolf Recovery Unit

Domestic Project Contractor 2015 to 2017

• Lead Hand/Pipefitter - KBR Wabi (Celanese RTO Installation and Suncor Fort Hills Oil Sands Project)

• Foreman - JV Driver (Suncor Fort Hills Oil Sands Project)

• Pipefitter - PCL Energy (Fort Hills Secondary Extraction Project) Project Coordinator/Advisor - Pyramid Process Fabricators 2012 to 2015

• Advised production team on how to fabricate and assemble oil and gas processing equipment

• Managed project communication with clients and subcontractors

• Coordinated with engineering, drafting, procurement, scheduling, quality control and production departments to successfully complete projects

• Reviewed drawings, bill of materials, instrument lists and specifications to ensure accuracy Bryan Juchli

Edmonton, Alberta

780-***-****

*******@*******.***

1

Construction Supervisor – 5Blue Process Equipment Ltd. 2010 to 2011

• Supervised assembly personnel in the fabrication of oil and gas processing equipment

• Aided with production planning and the preparation of schedules

• Participated in design reviews and provided input and feedback on designs

• Ensured product quality standards of assembly work

• Coordinated and inspected work completed by sub-contractors Overseas Project Contractor 2008 to 2010

Mechanical Foreman - Sherritt (Ambatovy Project in Tamatave, Madagascar)

• Supervised fabrication and installation (Power plant facility 3 train fired boiler - 45MW each)

Site Liaison Representative - Enerflex (PDO Lekhwair Amine Trains Project, Oman)

• Advised PDO (Petroleum Development of Oman) on installation & assembly

• Resolved any on-site concerns and maintained communication between EFX and PDO

Construction Supervisor - Tarpon Energy (Marecsa Eco 3 FPSO Project, Mexico)

• Coordinated construction scheduling and communication between different divisions, and acted as liaison to project management concerning subcontracting, progress, and delays

• Inspected work in progress to ensure quality

• Managed the tracking and handling of components including skids, vessels, and spooling

• Directed and/or assisted assembly crews with how to lay out and assemble piping systems Presson-Enerflex 1994 to 2008

Started as a Laborer, advanced to Pipefitter, Safety Representative, Lead Hand, Field Construction and Service Representative, and Assembly Supervisor. Received extensive experience on every type of package fabricated such as meter skids, heaters, separators, water injection packages, satellite skids, dehy packages, amine plants, and SAGD modules.

Assembly Supervisor

• Planned/scheduled workloads, resources, and equipment needed to maintain on time delivery

• Coordinated handling of all components, which included skids, vessels, spooling etc, between fabrication, subcontractors, and assembly

• Supervised, directed and/or assisted assembly crews in whatever capacity needed

• Managed production documentation and reviewed project documents with lead hands

• Ensured all activities completed safely, and had extensive involvement with safety committee

• Supervised the completion of work and ensured that finished products met all job specifications and internal requirements

• Coordinated apprenticeship training program

• Maintained effective communication with management, project engineers, drafting and design, purchasing, quality control, operations, subcontractors, inspectors, and clients Notable Project Experience at Presson-Enerflex

WASCO El Wastani Phase III Project for Damietta, Egypt (160 mmscfd gas facility)

Connacher Oil & Gas Great Divide Evaporator Project Certificates

• Journeyman Steamfitter-Pipefitter

Additional Skills / Courses

• Proficient with MS Office • Red Cross – First Aid

• MHSA – Safety Basics • MHSA – Leadership for Safety Excellence Employment History cont.

2



Contact this candidate