MUDASAR AHMAD CHIEF SURVEYOR /SURVEY ENGINEER
Cell #; 009**-********* KSA,009**-******** QATAR
ID: *****************@*****.*** (Current location SAUDIA) Saudi Council Membership ID 1000064 & approved from (Neom) Objective:
Join a career-promising organization that offers a responsible and challenging job and a congenial working environment along with many opportunities to work with highly educated professionals to ensure rapid professional growth. I want to do some exceptional work in my professional Qualifications: career.
Bachelor’s degree in civil engineering
Diploma in civil (3 years)
Computer Skills:
AutoCAD, Civil 3D, Excel, Word
Software Lis CAD, Leica Geo Office,
Data downloading & processing data of Total
Station & G.P.S
Professional Skills:
Ability to communicate effectively with consultant/ subcontractor and authority representative and
other project team members.
Familiar with Topographic & all types of Survey work
Well knowledge all survey work and survey
Instruments.
Strong verbal and written communication skills.
Build successful working relationships with internal departments.
Language: English, Hindi, Arabic, Urdu
Nationality: Pakistani
Date of Birth:1982
Marital Status: Married
Profile: -
I have more than 18 Years of Experience in
surveying field. My journey in surveying starts from surveyor to senior surveyor & chief surveyor.
Presently I am working with UCC Riyadh KSA. I
have Experience Buildings, High-rise tower, roads, pipelines, bridges, infrastructure, oil & gas, dams
& land scape. I can manage all the steps of the
survey.
Country Experience: (KSA, Qatar, U.A.E, Oman, & Pakistan) Experience Summary:
Company: Urbacon UCC KSA
Designation: Chief surveyor
Project: High density office + Oberoi hotel (all types of work like (infra. roads & building)
Consultant: AECOM +V3 Dec.23 to till date
Company: Alaali international Qatar
Designation: Chief surveyor
Project: Doha expo (all types of work like (infra. roads
& building)
Consultant: AECOM May.23 to Dec.23
Company: Lemirage Fit out Qatar
Designation: Chief Surveyor
Project: Abu hamour shopping village (all types of work like (building, infra & roads)
Consultant: ITALCONSULT Oct.20 to May 23
Company: Al jaber Qatar
Designation: Chief Surveyor
Project: New Orbital Highway (42 KM)
B-ring road 7km all type of work
Consultant: AECOM Feb.17 to Oct. 20
Company: UCC/KCT Qatar
Designation: Senior Surveyor
Project: Mall of Qatar + Khalifa stadium (all types of work like (building, infra & roads)
Consultant: K Aug.16 to Feb 17
Company: SPK U.A.E
Designation: Senior Surveyor
Project: AL Falah Abu Dhabi 730 villas (all types of work like (building, infra & roads)
Consultant: KHATIBALAMI Jan.10 to Aug. 11
Company: City survey U.A.E
Designation: Senior Surveyor
Project: Dubai mall Sep.05 to Dec.09
Buraj Khalifa
Jabil ali Airport
Oil & gas
(all types of work like (building, infra & roads)
Company: Engineer Survey consultant Pakistan
Designation: land surveyor Oct.02 to April 05
Project: main GT road 40 km Gujrat to head marala sialkot Position: -chief surveyor Dec. 2023 till present
Company: -Ur bacon Trading and Contracting - KSA
Project: - High density expansion -office +Oberoi hotel Prepare the data for site work and download data from total station and G.P.S. Layout and setting out vertical and horizontal alignment of concrete column, footing, slabs, doors, elevators, windows, stairs, other concrete structures, mechanical layout and electrical layout. To establish and maintain the control points. Lay out (setting out) of project. And writing technical reports. Planning and overseeing building work. Control top level of slab and marking of block works. Management system. Position: -chief surveyor
Company: Alali international-Qatar May.23 to Dec.23 Project: Doha expo (all types of work like (infra. roads & building) Working as chief Surveyor. It’s Qatar EXPO 2023 along with Services including infrastructure. Prepare the data for site work and data download from total station and G.P.S. Lay-out and setting out of vertical and horizontal alignment of concrete column, & wooden flooring, footing, slabs, doors, elevators, windows, stairs, other concrete structure, mechanical layout, and electrical layout. To establish and maintain the control points. Lay out (setting out) Position: -chief surveyor
Company: Lemirage Fit out- Qatar Oct.20 to May 23
Project: Abu hamour shopping village (all types of work like (building, infra & roads) Working as chief Surveyor. It’s Qatar's largest Shopping village along with Services. Prepare The data for site work and data download from total station and G.P.S. Layout and setting out vertical and horizontal alignment of concrete column, footing, slabs, doors, elevators, windows, stairs, other concrete structures, mechanical layout and electrical layout. To establish and maintain the control points. Lay out
(setting out) of project. And writing technical reports. Planning and overseeing building work. Control top level of slab and marking of block works. Take the as built of slab and submit it to consultants. Position: -chief surveyor
Company: Al jabber -Qatar Feb.17 to Oct. 20
Project: New Orbital Highway (42 KM)
B-ring road 7km all type of work
*-A 10 lane of total length 42-kilometer, Highway project, including Truck Route with 5 junctions, under ASHQAL (Municipality of Qatar). As a senior surveyor my responsibilities. Prepare the data for site work and data download from total station and G.P.S Responsible for all control points with static method.
*-Provided technical support to any other surveyors involved with each project. Ensured that all data from
*-surveying expeditions was safely stored.
*-Maintained an updated database of project. Dealing with consultants.
*-Dealing with Design Department.
*-Providing training for new Equipment to the surveyor. Quality control for survey work as well as accuracy. Closely following surveyor’s daily progress report Position: Senior surveyor
Company: Ur bacon Trading and Contracting -Qatar Aug.16 to Feb 17 Project: Mall of Qatar
Khalifa stadium
Working as Survey surveyor -survey Coordinator at Mall of Qatar. It’s Qatar's largest shopping mall along with Services including infrastructure
•I’ve worked in this project As Sr. Surveyor from june-2012 up to Sep. 2013. In this project I’ve worked on Infrastructure (Roads, 4500 Parking’s, Utility Services, 1 Service Building, 6 Substations, Land Scaping, Service Tunneling and Satellite Irrigation System), 1 Football
•Stadium, Multipurpose facility, Hotel, 4 Foot Ball Training Fields, 2 Changing Rooms n 1 Fitness Center Building more
Position: -senior surveyor
Company: SPK-U.A. E Jan.10 to Aug. 11
Project: AL Falah Abu Dhabi 730 villas (all types of work like (building, infra & roads) Prepare the data for site work and data download from total station and G.P.S Excavation of Earthwork. Check and finalize construction drawings. Check the vertically of walls. Inspection with consultants. Advising clients about building. To establish and maintain the control points. Lay out (setting out) of project. And writing technical reports. Planning and overseeing building work. Control top level of slab and marking of block works. Take the as built of slab and submit it to consultants. Position: -senior surveyor
Company: City survey-U.A. E Sep.05 to Dec.09
Project: Dubai mall
Buraj Khalifa
Jabil ali Airport
Oil & gas
• A cadastral surveyor is responsible for accurately defining property boundaries and understanding the laws of land ownership. This may include the identification of residential or rural boundaries, re-establishing boundaries that have been previously surveyed or creating new boundaries as part of the land subdivision process. A cadastral surveyor has the skill and knowledge to interpret and advise on the location of boundaries and if there are any rights or restrictions relating to the property. The information and measurements taken by the cadastral surveyor are recorded on a survey plan which
•Excavation of Earthwork.
•Layout (setting out) of Runway Level mark of Embankment, Capping and ABC.
•Setting out for asphalt and control level on runway, Taxi area.
•Setting out Apron, Taxi way, Turn Pad area and Control Levelling.
•Setting out for secondary Duct Bank in Runway, Taxi, Apron, and Turn Pad Area.
•Setting out For AGL On Runway, Taxi A,B,C, And Both Turn Pad
•Establishment of Horizontal and Vertical control points for fixed reference using Total
•Control top level of concrete. Establishment of Horizontal and Vertical control points for fixed reference using Total Station and level. Inspection of Control points and Joint surveys with sub-contractors. Piles Cut Level, Load Test of Slab with (DNA03 LIECA). Precise. levelling & as Built of slab. Setting out of Leis line marking. Supervising Excavation and Concrete Piling Work. Lay-out of Grid lines and Axis for columns and footings. Lay-out and setting out vertical and horizontal alignment of columns and footings, slabs, doors. Stairs
Position: land surveyor
Company: Engineer Survey consultant-Pakistan Oct.02 to April 05 Project: main GT road 40 km Gujrat to head marala
•Excavation of Earthwork.
•Layout (setting out) and Level mark of Embankment, and ABC..
•Setting out for bridge pillar retaining wall and abutment
•Setting out for asphalt and control level on main carriage way.
•Setting out Retaining Wall, and Control Leveling.
•Setting out of all approach Road and Accesses Road and Control Level.
•Setting out Drain and Riprap and Control Level. Topographic Surve