JP Boctor Resume
JEAN PIERRE BOCTOR
Texas – UNITED States of
America (Mobile): +1 (346)
(Email): **.******@*****.***
OBJECTIVES:
• Client satisfaction.
• Maintaining the quality within the budget.
• Execute the project within the planned time schedule and mitigate the delays (if any).
• Develop the team’s experiences and upgrade the team’s knowledge level.
• Upgrade my knowledge to support the project
progress. Professional Summary
• Project and Engineering Manager with 24+ years of international experience delivering large-scale construction, infrastructure, and mission-critical projects. Specializes in data center–grade electrical systems, MEP coordination, and secure facility deployment. Proven ability to lead complex design-build efforts, manage interdisciplinary teams, and deliver technically sound, standard-compliant outcomes in high-pressure environments.
Licenses & certifications:
• Project Management Professional (PMP)®
• Construction Quality Management. U.S Army Corp of Engineers.
• PMI Citizen Developer™ Business Architect Skills.
• PMI Citizen Developer™ Practitioner Skills.
• Talking to AI: Prompt Engineering for Project Managers
• OSHA 30 hours Outreach Training Program – Construction.
• Data Center Design and Risk Analysis
PROFESSIONAL EXPERIENCE:(25+ Years)
1- Construction Project Manager Vali Coper International LLC July 2024 – Present Key Projects:
• SCLTI Hospital VA Medical Center Dallas.
Responsibilities
Directed coordination among architects, engineers, and stakeholders to align construction activities with design intent and project objectives.
Managed subcontractors across trades, optimizing workflows and ensuring efficient execution.
Oversaw daily site operations, resolving issues proactively to maintain momentum and minimize disruptions.
Enforced compliance with safety standards, building codes, and legal regulations throughout all phases.
Tracked progress and financials, delivering clear updates to clients and leadership.
Communicated technical and contractual matters effectively across teams to ensure alignment.
Developed and maintained budgets, schedules, and resource plans to support strategic execution.
Supervised equipment, tools, and workforce with detailed reporting and performance tracking.
Conducted risk assessments and implemented mitigation strategies to protect timelines and quality.
Collaborated with design teams to validate construction requirements and resolve design challenges.
Secured permits and approvals through direct coordination with local authorities. JP Boctor Resume
2 P a g e
2- Program Manager L&T Technology Services Limited, Redmond, WA, USA February 2020
– June 2024
Key Projects:
• Microsoft East Campus Modernization (Feb 2020–Feb 2024)
• P&G Utilities Optimization – Greensboro, Phoenix, Mexico City Plants (Mar–May 2024)
• SC Johnson Waxdale Plant – Utility Energy Management (June 2024)
• ExxonMobil Beaumont, TX – RFID Asset Tracking & IT/OT Integration (Mar–May 2024) Responsibilities:
Spearheaded the integration of Enterprise Data Center infrastructure into the MS East Campus Project, enabling scalable cloud and edge computing to support MyHub, V2G EV charging, and ELV systems.
Led end-to-end planning, design, and delivery of integrated ELV systems (BMS, FAS, CCTV, Access Control, EV Charging, etc.).
Ensured subsystem interoperability through interface coordination and integration protocols.
Validated design packages, optimized system integration, and managed full project lifecycle from concept to commissioning.
Delivered secure environments (SCIF/SAPF) and integrated MyHub across platforms for enhanced user experience.
Directed cross-functional teams and subcontractors to meet technical, cost, and quality targets. 3- Sr. Engineering Manager HDP (Healthcare Designers and Project Managers), Abu Dhabi October 2017 – January 2020 Project: Dubai Health Authority Clinics – $52 Million
(Including Abu Hail, Al Qusais, and Umm Suqeim New Medical Centers)
Led installation and commissioning of electrical systems in healthcare projects, ensuring compliance and readiness.
Supervised site teams, enforced quality standards, and coordinated design execution with contractors and consultants.
Reviewed submittals, managed RFIs, and resolved field issues to maintain project momentum.
Delivered complete electrical design packages, including lighting, power, low-current systems, and single-line diagrams.
Collaborated with cross-disciplinary teams and local authorities to ensure seamless integration and regulatory approvals.
4- MEP Manager Galaxy Advanced, Abu Dhabi September 2016 – October 2017 Project: Repton Senior School, Reem Island – Teaching & Sports Blocks Responsibilities:
Directed electrical installation and commissioning for academic and recreational facilities.
Supervised subcontractors, reviewed submittals, and ensured compliance with design, codes, and quality standards.
Led electrical design and implementation, including lighting, power, and low-current systems.
Coordinated with multidisciplinary teams and local authorities to meet project goals and regulatory approvals.
Managed RFIs, QA/QC processes, and supported project delivery within budget and schedule. JP Boctor Resume
3 P a g e
5- SR. PROJECT ELECTRICAL ENGINEER SEPTEMBER 2015 – SEPTEMBER 2016 DAR AL-HANDASAH (SHAIR AND PARTNERS), ABU DHABI
PROJECT: ADNOC – NEW MEDICAL CENTER – COMPLETED $106.00 MILLION PROJECT DETAILS:
1- NEW MEDICAL CENTER.
2- HSE Building.
3- ADNOC COMPOUND NEW SUBSTATION.
6- SR. PROJECT ELECTRICAL ENGINEER JUNE 2010 – SEPTEMBER 2015 DRAKE & SCULL INTERNATIONAL, ABU
DHABI PROJECTS:
A. PRESIDENTIAL PALACE – WINGS PACKAGE ABU DHABI, UAE 1,500,000+ FT $2.19B SR. PROJECT ELECTRICAL ENGINEER
Led full MEP coordination across secure VVIP command and control facilities
Deployed MV/LV electrical systems, ELV infrastructure, and uptime-focused redundancy
Installed raised floor grounding, fire detection above ceiling and under floor, special suppression systems
Led Enterprise Data Center deployment for the Presidential Palace Project, ensuring VVIP- grade data security, encrypted communications, and compliance with SCIF/SAPF standards. B. DANAT AL EMARAT HOSPITAL ABU DHABI, UAE 600,000 FT $100M SR. PROJECT ELECTRICAL ENGINEER
Engineered Enterprise Data Center architecture for the Danat El Emarat Hospital, supporting EMR systems, surgical telemetry, and critical healthcare data with high-availability MV/LV and suppression systems.
Delivered uninterrupted critical utility supply for sensitive data and surgical zones
Integrated raised floor platforms, EMF-sensitive layouts, underfloor leak detection, and server- grade fire suppression
Coordinated full ELV suite and resilient MV/LV power architecture C. ABU DHABI COURT HOUSE COMPLEX ABU DHABI, UAE 450,000 FT $85M SR. PROJECT ELECTRICAL ENGINEER
Oversaw secure AV and IT infrastructure for judiciary environments
Managed concealed detection systems, redundant suppression, and structured fiber cabling
Delivered mission-critical ELV and LV systems for digital archiving and records protection
Directed the implementation of a Court House Complex Data Center, establishing secure connectivity with nationwide judicial data centers to enable a robust, resilient legal information network.
7- SR. PROJECT ELECTRICAL ENGINEER JUNE 2007 – MAY 2010 AL AHMADIAH AKTOR, DUBAI
PROJECT: IBN BATTUTA GATE COMPLEX PROJECT
DETAILS:
1- Office building – 177 offices. 2- Ibn Battuta Gate. JP Boctor Resume
4 P a g e
3- Movenpick Hotel 397 Guest Rooms
4- Residential Building 156 Hotel Apartments
$274 Million Project ($109.00 Million for MEP) Job Description:
Designed and implemented Enterprise Data Center solutions for the Ibn Battuta Complex, delivering centralized IT services for hospitality, residential, and commercial tenants with future-ready scalability.
Supervise and inspect electrical installations, modifications, and commissioning at construction sites.
Monitor and document work progress; ensure design implementation aligns with plans and specs.
Provide technical support and coordinate with other disciplines and local authorities.
Review material requisitions, submittals, and RFIs; ensure contract and quality standards are met.
Lead electrical design (low current, lighting, power, load schedules, SLDs) and oversee construction compliance.
Assist Project Manager with timely, budget-conscious project delivery.
Investigate electrical issues and ensure controlled site conditions.
Act as senior site representative for electrical QA/QC 8- SR. PROJECT ELECTRICAL ENGINEER JUN 2005 – MAY 2007 MAK ENGINEERING CONSULTANT
Responsibilities:
Design for electrical power systems, developing shop drawings for construction, Co-ordination between electrical and mechanical works, Developing Bill of Quantities (BOQ) and Site supervision for electrical and telecommunication services including:
Coordinate electrical and mechanical works.
Supervise site installation of electrical and telecom systems, including:
MV/LV networks, power distribution, grounding, transformers, generators
Indoor/outdoor lighting, fire alarm, telephone, PA, data, CCTV, BMS, and antenna systems
9- SR. PROJECT ELECTRICAL ENGINEER AUG 2000 – MAY 2006 MAGDY RAFLA ELECTROMECHANICAL CONSULTS
ROJECTS INVOLVED IN EGYPT:
Plenty of projects
Details are available on
request.
EDUCATIO:
Bachelor of Science in Electrical Engineering (faculty of engineering – Ain Shams University) class of May 2000