STEVE IVES SUMMARY OF DUTIES, RESPONSIBILITIES AND ACHIEVEMENTS AS CONSTRUCTION /PROJECT MANAGER/ CLIENT REPRESENTATIVE.
Open Communication all parties
Primary focal point of communication between Client
Input into Planning and Project Schedules
Input into revision/development of Procedures and Drawings to Approved
Monitoring HSE&Q
Input into & development of Hazard Identification & Risk Assessment
Clarification of Work Scopes with Client & Sub Contractors
Verification of Sub Contractors procedures
Identification & Confirmation & Approval of Equipment/Plant
Development of Deck & Loading Planning
Development of Execution Plan Coordination with other Management & Department
Offshore/Office
Communication with Certifying Authorities & Marine Warranty Surveyors
Verification of contractual requirement being met & adhered to
Application of Milestone payment submittance through approved system
Monitoring for requirement or request to approve Change to Procedures & Variation orders
Working closely with Project teams and other departments
Monitoring Fabrication & Attendance at FATS
Focal point for Daily, Weekly, Project meetings
Monitoring of progress & field/site reports
Input into Close Out & Learnings
ADDITIONALLY
Previously involved with preparation of Tender documents
Responsible for the design and manufacture of Dive Systems and Chambers to IMCA Standards and Lloyds Certification
ACHIEVEMENTS
Safe, timely completion of Projects
Completion of 1st Deepwater Steel Catinery Riser to floating facility worldwide using
Prototype J-Lay system
TAUCHEN
PROJECT CONSTRUCTION MANAGER MOTRIL ANDALUCIA
Remedial works to existing harbour and jetty extension including preparation, excavation, foundation work.
MERMAID SUBSEA 2016 / 17 ABU DHABI
CLIENT OFFSHORE REPRESENTATIVE KINGDOM SAUDI ARABIA
Mobilisation and loading, spooling of power cables to 2 CSV’s and 3 lay vessels. Monitoring and progress reporting as representative to client of all offshore activities in line with complete scope of works covering lay of interconnecting power cables to structures, initiation and handovers including pull in through bell mouth and j tube guides. Monitoring bridge activities including lay [catenary, bend radius etc], positioning and survey to maintain lay routes within acceptable parameters. Monitoring of all other activities including deck and other work parties to ensure Safety standards achieved & maintained. Focal point for Daily Site meetings with vessel, sub contractors and communication with shore side.
Monitoring shallow water lay and beach pull activities. Monitoring of all Burial works also including Rock dumping to ensure that specification met within the required tolerance.
2 DSV's, Saturation Diving construction for Client Saipen. Work included various Constructions, Spoolpiece Installation
MERMAID SUBSEA 2015 /16 ABU DHABI
PROJECT MANAGER
2 DSV's, Saturation Diving construction for Client Saipen. Work included various Constructions, Spoolpiece Installation
TAUCHEN 2014 CARTAGENA
CONSULTANT
Modification Dive Vessel and build of associated Dive Systems.
HSSE 2014
PROJECT MANAGER
Diving and Cable Installation support operation o Gwynt y Mor Offshore Wind carried out from 2 x DP 2 DSV's
In field Handovery, recovery and pull in of interconnecting cable arrays including tower / rigging preparation.
ANTARES OFFSHORE 2013 INDONESIA
PROJECT CONSTRUCTION MANAGER
Throughout three consecutive projects with COPI, Star Energy and Pertamina. Work included dynamic riser and flexible pipeline. Spool piece installation, sectional rigid riser installation to complete water injection between platform and FSO.
Recovery of function umbilical, re-splice of additional 50 meters. Relay and connection to Well.
Relay of in field cables.
Gas Pipeline bypass from 14inch, 20inch into 24inch pipeline including all preparation . Concrete removal, inspection. 9 HOT-TAP clamps to create bypass T Pieces and STOPPLES. Hot tapping operation and energising Stopples.
Subsequent spool piece tie-ins to newly laid pipelines. Manifold and pigging skid installation. Pre-commissioning and removal of Stopples
All preparation of all procedures per work hazid.
DNO UAE 2012/TALISMAN
SENIOR SUBSEA CONSTRUCTION CONSULTANT / CLIENT REPRESENTATIVE
Remediation and rectification by means of 4km bypass of blockage via hot taps on 18.4km pipeline
Work-scope including 300 plus personnel from lay-barges, DSVs Survey support Vessels
Relay of 2 infield power cables.
SALVAMENTO MARITIME 2010/2012
PROJECT MANAGER
All aspects of new build 200mtr Diving System. Including L.A.R.S. and supporting structures for Spanish Government Agency.
OFFSHORE SUBSEA SERVICES 2009 VIETNAM
PROJECT MANAGER / CLIENT REPRESENTATIVE
Diving and R.O.V. Programme, including control system fault finding and repair, I.M.R.
and survey. Mobilisation, lay, handover and pull in of in field cables to structures and sub complex
ALLSEAS 2008/2009 VIZAG BAY OF BENGAL INDIA
DIVING CONSTRUCTION MANAGER
Gas Field development on behalf of Reliance. Diving, W.R.O.V., Reel Lay Survey, pre-commissioning activities, lay of umbilicals, jumpers.In field cable lay.
PT.O.S.I. 2008 JAKARTA INDONESIA
Project Manager PHASE 2 AS BELOW
P.T. OSI 2008 JAKARTA INDONESIA
Project Manager
Management of I.R.M. project for BP West Jave. Installation and replacement of Spool pieces. Pipeline Repairs, Cable Lay, Maintenance, Sub-sea and surface hoses replacement on SPM’s Riser replacement, Span rectification, Inspection programme. Trenching and Burial works.
P.T. OSI 2007 JAKARTA INDONESIA
Project Manager
Pipeline repairs, Spool piece replacement. Cable and umbilical lay.
BP TRINIDAD 2007 PORT OF SPAIN TRINIDAD
Construction project
Removal of SBM and subsea hoses with refurbish completion of subsea pipeline. Fabrication of spool pieces. Replacement of SBM, within Main Export Schedules
Spoolpiece installation, Risers and clamps installation
BP WEST JAVA LTD 2007 NORTH WEST JAVA
Client Rep
Construction. Pipelaying, spoolpieces, Riser Clamps and Riser installation. Cable lay
BP WEST JAVA LTD 2007 NORTH WEST JAVA
Client Rep
Construction Pipelaying spoolpieces, Cable lay, Riser clamps and Riser Installation
PT OFFSHORE SERVICES INDONESIA 2006 JAKARTA/NATUNA SEA
Project manager
Planning and development of project procedures with associated engineering. Preparation of all documentation, vessel, equipment and rigging identification. Control of Mobilisation and offshore completion of:
Disconnection (topside and sub-sea), laydown of risers and control umbilical to wellheads. Disconnection of F.S.O. moorings and towing.
SAKHALIN ENERGY INVESTMENT CO.LTD 2006 SAKHALIN RUSSIAN FED.
CLIENT OPERATIONS REPRESENTATIVE
Contruction programme Installation of 3 x 30”, 4 x 16”, 1 x 4.5” spoolpieces
SHELL NIGERIA EXPLORATION & PRODUCTION CO 2006 WEST AFRICA
OFFSHORE CLIENT OPERATIONS REPRESENTATIVE
Assembly and installation of phase 1 “Treline” 30” riser and Gimbal to F.P.S.O.
SHELL UK 2006 NORTH SEA UK SECTOR
Well operations. Recovery of tree, maintainance and re-installment of tree. Replacement of cables
SHELL UK 2006 NORTH SEA UK SECTOR
Maintainance on manifold and water injection valves and pipework, preparations for removal and replacement of riser/pipeline section
PAGE 2
SHELL UK 2006 UK
Project support H.I.R.A. Meetings. Various works
SHELL UK 2006 NORTH SEA DUTCH SECTOR
CLIENT REPRESENTATIVE
Pipeline stabilization. Concrete M attress and grout bag installation
SHELL UK 2005 NORTH SEA UK/DUTCH SEC
Installation of spoolpieces. Testing
SAKHALIN ENERGY INVESTMENT CO.LTD 2005 SAKHALING RUSSIAN FED.
CLIENT REPRESENTATIVE Diving Operations Advisor
E.P.C.I. Contract for tanker loading unit Construction operations conducted from Lift Barge. Jack-Up/S.E.P. casing and drilling using recirculating drilling tool. Installation of sub-sea template, pile guides. Driving and grouting of piles. Installation of sub-sea structure 1060 tons for T.L.U.
SHELL EXPLORATION & PRODUCTION CO 2005 NORTH SEA DUTCH SECTOR
Offshore Operations Representative