Civil Engineer
PERSONAL DETAILS Name :
Fathers Name :
Date of Birth :
Present Address :
Permanent
Address
:
Nationality
Religion
Marital Status
Height & Weight
Passport No.
Contact Phone
Profile:
I have 29.00 Years working experience as a Chief Surveyor / Quantity Surveyor, Marine Surveyor, Civil Engineering works & Auto CAD engineering works with management skill. I have fully completed several kinds of construction projects, which Include Airport Construction, Sea Port construction, Breakwater, Outfall (WET) Pipeline placing & Dredging works, Stadium, Shipyard, Bridges / Culverts and Riverbank Protection construction Projects. Design works: Designing and Revise drawing and make final working drawing as per site condition for the project. Civil design works for Airport / Factory and Others. Making all kinds of survey report, which include Project Quantity calculation report, As-built survey report, In- survey / out survey report, Topographic survey report, proposal survey report, As-built Survey report & etc. I
Possess great ability and skills to solve problems and making quick decision on site in case of any construction problem arise such as levels, alignment and design issues. Install + Repairing & Calibrations of all kinds of total station / levels instrument and RTK GPS system on Excavator, Survey vessels, Base station, crawler Crane, Barge & Backpack survey system. I can operate independently any kind of Total station, RTK GPS, system on Excavator, Crane, Survey boat
(Multibeam sonar system/Dual beam or Single beam Echo sounder system) & Barge RTK GPS system. Input project design profile into the Excavator, Crane, Survey vessel & Barge computer system for alignment & levels on accordance to the project design drawings.
I also possess skills and Ability to carry out independently Hydro-graphic, Topographic, all kinds of Setting out, pile drive & all kind of survey report. I am able to do civil design works for Factory / Airport road and storm water drainage system independently.
I can operate independently several kinds of Hydrographic / Land survey & Engineering software, Such as PDS2000 data Acquisition (Multibeam & Singlebeam) & Processing, Hydropro (data Acquisition & Processing). Terramodel 10.6, SDR mapping & Road design, AutoCAD Civil 3D, AutoCAD, Structure design software StaadPro & etc. I can install and operate very well all kind of Hydrographic & Land survey equipment such as all kind of RTK system, Total station & Level instrument.
I have 29.0 years of Computer working experience in various programs software, such as different kind of Engineering & Surveying software’s, Networks, as well as in computer hardware & etc. Md. Ferozer Rahman
Md. Hasan Ali
16
th
July 1975
Md. Ferozer Rahman Dar Es
Salaam – Tanzania
*********@*****.***
Md. Ferozer Rahman
Tonona Villa
House 61, Road 3, Block B, Word 54,
Vill - Nishad Nagor, Dhour – Thana : Turag, Dhaka - 1230, Country: Bangladesh, Asia.
Bangladeshi (by birth)
Islam (Sunni)
Married
1.74 meters / 76 KGs (Non Smoker)
BT 05280327
Mob + /Home+880**********
CURRICULUM VITAE
Md. Ferozer Rahman
Mob: WhatsApp +880**********)
E-mail: *********@*****.***
1 of 9
1994
1999
1991
Language Literacy
Class
Total Experiences: 29 Years:
Skills: * Chief survey or Survey Manager
• Senior Estimator or Quantity Surveyor
• Senior surveyor / Survey Engineer or Survey designer & etc.
• Auto CAD Engineer
• Site Engineer
• Construction Manager Driving small vehicles like as Pickup / Car & etc. Extra Curriculum Activities:
Computer Software & Hardware:
* Software: * Auto CAD * STAAD.Pro Structure Design software,
* Road design Software: 1) AutoCAD Civil 3D
2) SDRMapping and Road Design
● Hydrographic and Land survey for data Acquisition and Processing Software: PDS-2000 (Crane + Excavator & Survey vessels) ● Hydro-Pro ● Hydro-6 & Hydrobat (Multibeam sonar system) * Terramodel- 10.6 Liscad
* Others software
* Microsoft Excel, Word, Access, PowerPoint,
Publisher, ● Adobe Premiere ● Adobe Photo-Shop ● Maxtoll Toll system ● 3ds Max ● Internet browsing, E- mail & etc.
Computer Hardware & Network: ● Trouble shooting ● Computer Assembly
● Networking ● Software Installation ● Repair
Survey Instrument Used: RTK GPS system, use in performing Hydrographic survey
& Land Survey. Reference (Base) station setting for the Project, RTK land survey (Backpack) Several kind of Echo sounders such as Odam, Navisound, & Reson Hydrobar, (Multibeam sonar system), W/ Data recorder SDR33 / Psion & Trimble TSC2, 3 & 5 for Setting out & collection of the Topographic survey data. Different kinds of Automatic Level Instruments. Please Note that I can operate / Repair all kind of survey equipment Total station, GPS, DGPS, and RTK System & level instrument Bogra (NTRAMS)
:English & Bengali: Reading, Writing, Listening & Speaking Fluently Jessore Board,
Jessore
Second
Name of Examination Year Board/ University
BTEB, Dhaka.
Bogra (NTRAMS)
Jessore Board,
Jessore
Educational Qualification
Diploma in-civil Engineering
Diploma in Computer
Science
Secondary School
Certificate
2 of 9
Experience Details:
i. Organization :
Project :
Duration :
Position :
Responsibilities :
ii. Organization :
Project :
Duration :
Position : Chief Surveyor (Survey Manager)
Responsibilities :
iii. Organization :
Project :
Duration :
Position : Chief Surveyor (Survey Manager)
Responsibilities :
From November 2019 to December 2021
I am head of the Survey departments and design and drawing for all the project civil works like storm water drainage system, designing Road and Retaining wall for the project.
Making all kinds of survey reports such as daily, weekly, Monthly progress report, Volume calculation report for Checking and finalizing subcontractor payment bill and make final billing sheet for the project for subcontractor for the Project and all these are submitted to the engineer and Consultant for review, approval of Subcontractor billing purpose
McDonald Steel Building Products Limited. Shanta Western Tower (Level 11) 186, Bir Uttam Mir Shawkat Ali Sarak, Tejgaon Industrial Area Dhaka-1208 Dhaka Airport – Terminal 3 – Export and Import cargo Complex and (DMRT) Dhaka metro rail Project
Monthly progress report, Volume calculation report for the Project and all these are submitted to the engineer and Consultant for review, approval of Subcontractor billing purpose.
* Calculation of all kinds of subcontractor works volume, and theses report submit to the Consultant and QS section for billing purpose.
* Checking all station steel structure design drawing and make final anchor bolt and structure position and leveling setting out sheet and those sheets submit to the consultant for approval after that report send to the site surveyors for setting out position, align and leveling with +-1mm tolerance. * As- built Truss and anchor bolt align report and those reports submit to the consultant for approval
All kinds of survey data processing & make design drawings, quantity calculations, Cross section, Contour plan, Volume calculation, Setting-out, Settlement
Monitoring chart and etc. Using survey Instrument: - 1.Trimble RTK DGPS system for Topographic
survey and setting out 1” accuracy Leica and
I am works for the Project as a Senior Marine Surveyor of the Survey departments and responsible for the project of marine survey works like as stabilization survey control point on the trusses and static survey method calculation survey coordinate to the control points by the Trimble RTK GPS system for the project.
Making all kinds of survey reports such as daily, weekly, Monthly progress report, As-built survey report for Pile, Trusses and Steel frame with indicated tolerance and the report submit to the consultant for approval and continue works purpose. Checking and finalizing subcontractor payment bill and making final billing sheet for the project and all these report are submitted to the engineer and Consultant for review and approval of Subcontractor billing purpose.
AFRISIAN GINNING LTD, TANZANIA, - 34 Saza Rd, Chang'ombe P.O. Box 19964, Dar Es Salaam, Tanzania.
Infrastructure improvement in Factory
15 December 2021 to April 2024.
BBN Limited Tanga-Tanzania
East African Grude Oil Pipeline Eacop project
14 April 2024 to December 2024
Senior marine Surveyor
3 of 9
iv. Organization :
Project :
Duration :
Position : Chief Surveyor (Survey Manager)
Responsibilities :
v. Organization :
Project :
Duration :
Position : Chief Surveyor / Survey Manager
Responsibilities :
I am head of the Survey departments and control all the site Surveyor and Survey works and site design works in the project. I am Responsible for: -
* Attending daily & weekly meeting.
* Making all kinds of survey reports such as daily, weekly, monthly progress report, Volume calculation report and all these reports are submitted to the engineer and consultant for review, approval of Subcontractor billing purpose.
* Calculation of all kinds of subcontractor Earthworks and Layers works
(Subbase, Base course,
CTBC, Asphalt ETC), volume and theses report submit to the Consultant and QS section for billing purposes.
* Control and review all sub-contractor volume certificate report, such as earthworks, Layers works volume, after that make final report and Submit to the engineering manager and consultant for payment purpose.
* Revised external works design drawing as per site condition and make final working drawing and the drawing submit to the consultant for approval.
* Make design Survey setting out, Co-ordinate & Levels setting out sheets and the setting out sheet provide to the field survey and Consultant surveyor for site works purpose and approval.
* All kinds of survey data processing & make design drawings, quantity calculations, Cross section, Contour plan, Volume calculation, Setting-out, Settlement Monitoring chart and etc.
Using survey Instrument: -
i) RTK DGPS system for Topographic survey and setting out ii) Leica and Sokkia levels instrument, total station & Laser System, use to align and levels works for the project
BAM international bv
Monrovia container terminal project
From 1st December 2011 to October 2013
I was head of the Survey section and controlled all kinds of of survey works and site Design works in the project, I was responsible for: - * Attending daily, weekly and monthly meeting. * Make project design profile and the design profile data input into the Excavator, Crawler Cranes, Barge & survey vessel computer for dredging and precast
concrete slab and pile alignment purpose. * Daily & weekly Hydrographic joint survey with client for check final level & alignment. * Survey data processing
(combine Hydrographic data + Land survey data) after make design template, Layout plan, cross section, Longitudinal section, volume calculation report, Contour plan etc. and make final progress report baseon the joint survey data.
* Make weekly / Monthly progress & Asbuilt survey report & those report Submit to the client for approval / Information or review. * Settlement Bam international (Tanzania – Dar Es Salaam Branch: office Uttam Mir Shawkat Ali Sarak, Tejgaon Industrial Area Dhaka-1208 Julius Nyerere International Airport Terminal 3 Project From 12 November 2013 to Nov. 2019.
Settlement
Monitoring chart and etc. Using survey Instrument: - 1.Trimble RTK DGPS system for Topographic
survey and setting out 1” accuracy Leica and
Sokkia Total station and levels instrument &
Laser System, use for aligning and levels works
for the project
4 of 9
vi. Organization :
Project :
Duration :
Position : Chief Surveyor / Survey Manager (Marine and Land) Responsibilities :
CP12 Higgs PH-& Hill 1A (Construction Qatar – Lusail of Branch Sout ern office) & Central outfall (WET) Lusail city, Qatar. (Marine works)
From Jan 2011 to November 2011
I am responsibilities of the project, Survey section controller, Attended daily & weekly meeting. Make design
Profile & design profile data input to the Excavator, Crawler Cranes, Barge & survey vessel computer. Daily & weekly doing Hydrographic (Data acquisition Duel
beam & Multibeam system) joint survey with client for check & final level & alignment. Survey data processing (combine Hydrographic data + Land survey data) after make design template, Layout plan, cross section, Longitudinal section, volume calculation, Contour plan & etc. Settlement monitoring survey daily & weekly.
General supervision of the hardware and software for the project’s RTK GPS systems on the Crawler Cranes, Survey Vessels, Excavator & Barge. Responsibilities for this project included the correct alignment of the works in accordance with the design drawings. Regular checks & Calibration of survey instruments (Land+Hydrographic) & RTK DGPS system of 1 No. Crawler Cranes & long boom excavator, survey vessels & Chiseling Barge RTK system check & calibration daily & weekly basis. Theses calibration data make check list template after submits to the consultant for approval. Repairing all kind of RTK GPS system problem like as cable broken, sensor damaged or not working properly of project Excavator, Survey vessels, Base station & crawler Crane RTK GPS system.
Supervising of Excavation levels, Dredging levels, Rock armor backfilling, drain pipe placing, levels, alignment & etc.
Using survey Instrument:
Hydrographic survey:
• Survey vessel Reson Hydrobat multibeam Soner system: Software PDS2000 for data Acquisition & Processing. ii) Survey vessel Trimble Hydropro Duelbeam system: Software Hydropro for data Acquisition & Processing & Terramodel 10.6. iii) Excavator RTK GPS system control program: CGS900 Grade control system (Design profile software: Trimble Sitevision office) iv) Barge & Crane RTK GPS control software: Hydropro Land survey
(combine Hydrographic data + Land survey data) after make design template, Layout plan, cross section, Longitudinal section, volume calculation report, Contour plan etc. and make final progress report baseon the joint survey data.
* Make weekly / Monthly progress & Asbuilt survey report & those report Submit to the client for approval / Information or review. * Settlement monitoring survey daily, weekly and Monthly. * Control pile alignment & cutoff levels during the tubular & Sheet pile drive. * General supervision of the hardware and software for the project’s RTK DGPS systems on the Crawler Cranes, Survey Vessels, Excavator & Barge. * Responsibilities for this project included the correct alignment of the works in accordance with the design drawings. Regular checks & Calibration of survey instruments
(Land+Hydrographic) such as RTK DGPS system on Crawler Cranes, Long boom excavator, survey vessels RTK system & Land survey equipment. Theses calibration data make check list template after submits to the consultant for approval. * Repairing all kind of RTK GPS system problem like as cable broken, sensor damaged or not working properly of project Excavator, Survey vessels, Base station, crawler Crane & Barge RTK GPS system. * Supervising of Dredging levels, beddings levels, Rock armor placing levels, Pipe placing levels & alignment etc. Using survey Instrument: Hydrographic survey: i) Survey vessel Reson Hydrobat multibeam Sonner system.
Using survey Instrument: Hydrographic survey:
• Survey vessel Reson Hydrobat multibeam Soner system: 5 of 9
vii. Organization :
Project :
Duration :
Position : Chief Surveyor / Survey Manager
Responsibilities :
viii. Organization :
Project :
Duration :
Position : Site Engineer
Responsibilities :
ix. Organization :
Project :
Duration :
Position : Chief surveyor (Marine + Land)
Responsibilities :
In this project I am responsible for over all construction of Moat & substations works.
Performing the activities as below:
* To prepare work program & submit to the management
* To attend to the daily meeting
* Quantity calculation for the project.
* Reinforcement, Shuttering and concreting works.
* To write daily report
* To co-ordinate with the consultant, subcontractors, Foremen and senior officers.
To organize all the material request by the foremen * To control over all manpower.
INTERBETON BV (Branch office Limbe – Cameroon - Africa) :
: Limbe Shipyard project
From 06 June 2005 to 25 May 2007
I had worked as a Chief surveyor (Marine & Land) of Interbeton BV Cameroon Branch (a subsidiary of Royal Bam Group Netherlands) for the design and construction of the Limbe shipyard and Breakwater project in Mokundange – Limbe – Camaroon - Africa.
I am responsibilities of performing Bathymetric (Hydrographic) survey, Topographic survey, All survey data processing, combining Hydrographic & Bam international (Tanzania – Dar Es Salaam Branch : office Rehabilitation of Julius Nyerere International Airport – Tanzania. From Jan 2009 to January 2011
I am responsibilities of the project, Survey section controller. Attended daily & weekly meeting. Design & drafting works all the project works. Make design, Layout plan, Section & etc after that theses document submit to the consultant for approval. Make site working drawing structural & civil for surveyor & site engineer. Provide all survey setting co-ordinate & etc for the field surveyor. All kind of survey data processing & make design drawings, quantity calculations, Cross section, Contour plan, Volume calculation, Setting-out, Settlement Monitoring chart & etc.
GRINAKER-LTA / INTERBETON IBHAYI Joint Venture (Breach office: 70,North End, Eastern Cape, Port Elizabeth – South Africa) Nelson Mandela Bay Multi Purpose Stadium.
From 12th June 2007 to 26th September 2008
for data Acquisition & Processing. ii) Survey vessel Trimble Hydropro Duelbeam system: Software Hydropro for data Acquisition & Processing & Terramodel 10.6. iii) Excavator RTK GPS system control program: CGS900 Grade control system (Design profile software: Trimble Sitevision office) iv) Barge & Crane RTK GPS control software: Hydropro Land survey equipment:
* Sokkia total station and Sokkia levels instrument
* RTK GPS system
6 of 9
X. Organization :
Project :
Duration :
Position : Chief Survey (Hydrographic + Land)
Responsibilities :
xi. Organization :
Project :
Duration :
Position : Auto CAD Engineer
Responsibilities : I had worked as an Auto CAD Engineer of Edmund Nuttall (UK) limited (A Group Company of HBG)
Bangladesh – UK Friendship Bridge Project at Ashugonj site office, B-Baria – Bangladesh - Asia. I am working in this organization in various Programs, Such as temporary facilities work, Office & Camp, layout Plan, Section, Elevation, Reinforcement details etc Designed and Drafting. Co-ordinate with Consultant & Sub contractors. Main bridge work: Permanent & Temporary works such as
Layout Plan, Section, Elevation, Reinforcement details, Formwork, Survey data processing (Pier, Segment, Pile Cap, Deck Slab, River training works, Road work, Gas Pipe line works etc. Drafting and Design. Survey works: Bridge, Permanent and Temporary works, survey setting out plans, provides all setting out data (co- ordinate) to field & hydrographic surveyors. Survey data processing and as-built drawing making such as (Pile, River
Training works, Road & etc all survey related works) Hydrographic & Topographic data input to Computer after design, Setting out, Earth work, Volume Calculation and Cross section and other miscellaneous Survey plans
& etc. Make As built report (drawing) for all the project Works. (Survey/ Structure / Architecture / MEP and Others)
SIGMA-RCL JV. CO. LTD:
: Bhairab Bridge Project (Maintenance & Toll Operation From September 2003 to 04 June, 2005
I had worked as a Chief Surveyor of SIGMA-RCL JV at Bhairab Bridge Project Ashugonj, B-Baria - Bangladesh. in various Programs, Such as Hydrographic
& Topographic survey, Settlement Monitoring survey, Reference station setting for the Project (DGPS system), and all of survey data Processing make Cross Section, Longitudinal section, contour plan, Volume calculation, Layout plan and etc.
Co-ordinate with Consultant & Sub contractors. Using Software: For Navigation: Hydro-Pro (Trimble)
For Processing: Hydro-6, Hydro-Pro, SDR Mapping & Road design, Hydro nav edit & Terramodel-10.13 (Trimble)
EDMUND NUTTALL (UK) LIMITED
Branch office Bhairab – Bangladesh– Asia
From 27th June 2000 to 15 September 2003.
I had worked as a Chief surveyor (Marine & Land) of Interbeton BV Cameroon Branch (a subsidiary of Royal Bam Group Netherlands) for the design and construction of the Limbe shipyard and Breakwater project in Mokundange – Limbe – Camaroon - Africa.
I am responsibilities of performing Bathymetric (Hydrographic) survey, Topographic survey, All survey data processing, combining Hydrographic & topographic survey data into production of bathymetric charts and drawings, quantity calculations, Cross section, Contour plan, Volume calculation, Setting- out, Settlement
Monitoring survey, Reference station setting for the Project (RTK system) and the general supervision of the hardware and software for the project’s RTK GPS
systems on the Crawler Cranes, Survey boat and Excavator. Responsibilities for this project included the
correct alignment of the works in accordance with the design drawings, regular checks & Calibration of survey instruments (Land+Hydrographic) & RTK DGPS system of 2 No’s Crawler Cranes & long boom excavator. Calculation of daily/weekly/monthly progress of the works 7 of 9
xii. Organization :
Project :
Duration :
Position : : Survey Engineer / Quantity Surveyor
Responsibilities :
xiii Organization :
Project :
Duration :
Position : Survey Engineering / Chief Surveyor
Responsibilities :
from 02 Oct. 1996 to 20 April 2000
I had worked as a Survey section Controller of Hyundai Engineering & Construction co. (South Korea) Ltd.
Hyundai-Jan de Nul Joint Venture on the construction of the River Bank Protection Project (Bramaputra right Bank priority works) at Sirajgonj, Bangladesh. I am working in this organization in various Program i.e. Construction Design such as site plan, Permanent and Temporary works drawing, including Revetment design, Country boat & Ferry terminal design, Culvert design, Cross section, Geotextile layout, CC Block layout, Road works, Architectural, Structural design drawing review, Proposal drawing, Digitized maps diagram, organization chart & plotting etc. Provide support for drawing used and produced by our survey Department, Such as Barometric & Topographic chart, Survey setting out plans Provides all setting out data to the field surveyors, Hydrographic survey (regularly) and Topographic survey. Hydrographic & Topographic data input to Computer after make design, Setting out, Earthwork, Volume Calculation and cross section and other Miscellaneous Survey plans.
As built works (drawing) for that project.
Co-ordinate with Consultant & Sub contractors for all sub control volume certification review and make final volume report for the project and submit the to Engineer and consultant.
using Software: Hydro6 Navigation & Processing, SDR Mapping and road design, Auto CAD, CorelDRAW, Microsoft Excel, Word, Published, Power- point, Project, 3D Home Dos & Windows.
Working also Computer Hardware and software such as Installation, Repair, Setup, Trouble shooting, Computer Assembly and etc. Practically know how to use of DGPS (Differential Global Positioning System) Used in performing Hydro Surveys, Reference station setting for the Project, Use of Total Station Sokkia Set 2C & 3C W/ Data recorder SDR33 for collection of Topographic survey data and Different Kind of Automatic Level Instruments.
From 21 April 2000 to 26th June 2000
I had worked as a Survey Engineer of Haripur 365 M/W CCPP Project at Kuripara, Bander, Narayangonj. I am working in this organization in various Programs, Such as Hydrographic and topographic survey. All survey data processing like input to Computer after design, Setting out, Earth work, Volume Calculation and cross section and Other Miscellaneous Survey plans etc.
Co-ordinate with Consultant & Sub contractors.
Used Software: For Navigation: Hydro6 & Hydropro
For Processing: SDR Mapping, Auto CAD, CorelDRAW, Ms Excel, Word, Published, PowerPoint, Project,
Surfer1.6, 3D Home Dos & Windows.
HYUNDAI ENGINEERING & CONSTRUCTION CO. LTD
River Bank Protection Project
Topographic data input to Computer after design, Setting out, Earth work, Volume Calculation and Cross section and other miscellaneous Survey plans
& etc. Make As built report (drawing) for all the project Works. (Survey/ Structure / Architecture / MEP and Others)
HYUNDAI ENGINEERING & CONSTRUCTION CO. LTD.
Haripur 365 M/W CCPP Project
8 of 9
xiv Organization :
Duration :
Position : Auto CAD Engineer
Responsibilities :
Date : 11/05/2024
DEVELOPMENT DESIGN CONSULTANTS LTD (DDC)
From Dec. 1994 to Sep. 1996
I had worked as an Auto CAD Engineer. I had worked in this Organization in various programs i.e. Design and Drafting of Architectural, Structural Drawing, GIS/Mapping, Proposal Drawing, Digitized of Drawing, Maps, Single Line Diagram, Power Station, Substation Plan, SCADA Drawing, Design of Bridge and etc. Using software: Auto CAD 12 Dos & windows, CorelDRAW, Microsoft Excel, Word, PowerPoint, Publisher, Dos & Windows
& etc.
(Md. Ferozer Rahman)
Date: 10 April 2025
Instruments.
9 of 9