Post Job Free
Sign in

Warehouse Worker General Manager

Location:
Springville, UT
Posted:
September 22, 2025

Contact this candidate

Resume:

MICHAEL K MOONEY

UT

Cell: ***-***-***-*

******************@*****.***

EXPERIENCE

Warehouse Worker

Lifetime Products, Clearfield, UT

*/****—5/2008

Lead Shipper

Orgaized and assigned daily assignments to co-workers, Operated forklifts, slip-sheets Clamp lifts, to pull orders and ship, Cordinate orders for trucks with incomming and out going loads. Quality control, maintaing an high standard for quality of products, and an accurate daily count of inventory counts, maintaing for a secure devices used for shipping products by braceing, and installing braceing on all out going loads, maintaing for equipment to be properly inspected daily. To properly cordinate with co-workers and Supervisor, for incomming and out going products, and for performing inventory of counts made for all warehouses. Siding Installer

A.V. S. Siding Const., Ogden, UT

3/2007—4/2011

Siding, Installer/ Cutter

Prepped new houses for siding, sealed outer walls with Tvex, seaed all windows, set up equipment, such as pump jacks and scaffolding, measured and cut siding for install, checked for all product to be level and secure. Installed board, Lap, staggered shake.smooth, and wood grained textures. Making sure all product is installed propperly, inspecting for proper sealing of installation and specs, and coordinating with General Manager of job site for proper installation. Building Construction.

Moonstone Construction, Ogden, UT

3/2011—5/2013

Rough- Framer

Performed general framing duties for residential homesand commercial buildings. Following blueprints and building plans, measuring and cutting wood and prepping materials to be used for structure Building Structure as plans required by owner / General manager on jobsite, following up on all specs. from plans & other contractors on jobsite.

Road Conuction

Harper Construction. Co., Salt Lake City, UT

5/2013—3/2015

Grade Setter, pipe lawyer, Equip.Operat.

Following Blue-Prints specs. for Road Reconstruction, Using Central Hub, Stakes for Elevations Running Trac Hoes, Back hoes Compacting with vibrating & Compacting Eqip. Roller Type Compactors, Performed Pipe for Inspection, Exing - Out Ground to be placed in, Setting -up Grade Lazer in Pipe, Running New Services From Main water line-to Water Meter, Back filling& compacting top soil. Maintaing Equip. Greasing,Cleaning & Inspection/ on all Eqip. Preparing for road Construction, Inventoring All Material & Equip. on job site for job. Maintaining Performance/ with all Managment Involved with construction, performing all required Duties Involved on Job-Site

Cement Tilt-up Walls

Eckman Construction, Salt Lake City, UT

5/2015—8/2017

Form,Builder/Cement Finisher

Prepped and cut materials needed for tilt-up walls, maintaing Specs. form Blueprints, using various types of hand tools Saws Cemernt tools Fork-lifts Man-lifts, Installing all rebar & block-outs needed for utilites and forms for walls, pouring Cement/Finishing, stripping all materials,prepairing for wall to be lifted a by Crane& placed with into posistion with existing walls. Performing all tasks for preperation to build Tilt-up Walls, and using Crane to stand walls in place



Contact this candidate