Post Job Free
Sign in

Sr/ Planning/ Scheduling Engineer

Location:
Lipa, Batangas, Philippines
Posted:
September 21, 2025

Contact this candidate

Resume:

ERNESTO G. MANALO JR.

Blk * Lot ** RoseApple St. Tamarind Grove, Plantacion Meridienne, Brgy. Cumba Lipa City Batangas 4217, Philippines

H/P: +63-976******* and +63-917*******

email: **********@******.*** / **********@*****.***

CAREER SUMMARY:

With highly organized, results-oriented, dedicated and competent team player with many years of experience as a Planning/Scheduler Engineer in Project planning/scheduling using Primavera P6 Professional 25.4 and MS Project Planner. Performed and handled various complex onshore and offshore, construction monitoring/ supervision, work scoping and project execution on Oil and Gas projects.

DUTIES AND RESPONSIBILITIES:

Project Involvement on FEED/ DD, FID and EPC Execution works

Working together with Planning Manager for the preparation of project planning and scheduling for the project.

Communicate with other discipline managers, supervisors and colleagues throughout the project.

Preparation of schedule in line with the project scope of work and execution plan for Construction of project within Projects Design and Specifications.

•Develops, Implements and updates the Baseline Schedule and detailed working schedules including forecast.

•Establishes progress measurement and tracking procedure/ method as a basis on production control.

•Establishes a complete Planning Package as per requirement i.e. Overall Project S-Curves, Key Quantities Histograms, Direct and Indirect Manpower Histograms, Schedule Basis Memorandum, Equipment Histogram, and P6 schedule forecasting/ back up (labour & quantity) respectively.

•Monitor overall and detailed project schedule on a periodic and timely manner. Monitors and updates project schedule (planned vs. actual) giving emphasis in the preparation of look-ahead schedule for construction works including forecast.

•Prepare schedule variance analysis report based on actual work progress vs. critical activities and key milestones driving the overall control of the project.

•Prepares three months look-ahead schedules based on approved current schedule considering actual site condition and information.

Attends project weekly and monthly progress coordination meeting and prepares weekly and monthly progress reports.

Monitors man-hours parameter vs. actual hours and prepares Quantity Tracking report.

Responsible for the preparation of prompt and accurate progress reports and resources using Primavera P6 Professional R25.1 and/ or Microsoft project Planner.

PROFESSIONAL EMPLOYMENT:

Company : Tecnicas Reunidas

Address : Blue Office, AKD Comertial complex S/47 Ras Laffan Industrial City

Project : NFXP NFS/NFE Expansion Project EPC3/4 - QE LNG

Date : July 2022 - May 2025

Position : Planning / Scheduling Engineer

Company : China Eleventh Chemical Construction LLC

Address : PO Box 332, Postal Code 325, Sultanate of Oman

Project : DUQM Refinery EPC1 A3 Project

Date : December 2019 - September 2021

Position : Planning and Production Control Manager

Company : DHI Dong Hyup (M) Sdn. Bhd.

Address : Petron Refinery, Jalan Panati Batu 1, Port Dickson

71000 Negeri Sembilan, Malaysia

Project : Petron Malaysia ULSADO Project

Date : May 2019 - December 2019

Position : Planning and Cost Engineer

Company : Unimetsu Consultancy & Engineering Sdn. Bhd.

Address : #9-B (2nd Floor) Jalan USJ 10/1C, 47620 U.E.P. Subang Jaya

Selangor Darul Ehsan, Malaysia

Seconded to : Boustead Heavy Industries Sdn. Bhd./

Boustead Penang Shipyard Sdn Bhd.

12th Floor Menara Boustead, #69 Jalan Raja Chulan,

50200 Kuala Lumpur, Malaysia

Date : May 2017 - May 2019

1. Project : (Tender) North Malay Basin Development Phase 2 Facilities EPCC+I

Fabrication of 2 Topside and 2 Jacket/Piles

Client : HESS Exploration and Production Malaysia B.V.

Position : Snr Planning Engineer

2. Project : (Tender) Provision of Engineering, Procurement and Construction

SK408E Gorek Development and F6 BIM Project

SK408W Larak Development

SK408 Bakong Development Project

Fabrication of Topside, Module and Jacket/Piles

Client : Sapura Exploration and Production Inc./ Sarawak Shell Berhad.

Position : Snr Planning Engineer

3. Project : (Tender) PETRONAS Frame Agreement for the Provision of

Engineering, Procurement and Construction (EPC) of

Fixed Offshore Structures

Client : PETRONAS Carigali Sdn Bhd.

Position : Snr Planning Engineer

4. Project : (Tender) Limabayong Deepwater Development Project

Fabrication of Subsea Manifolds, Jumper & Spools and Structures

Client : OSS and SS7/ PETRONAS Carigali Sdn Bhd

Position : Snr Planning Engineer

5. Project : (Tender) Bayan Gas Development Project Phase 2

Fabrication of Mobile Offshore Application Barge MOAB Topside

Client : MISC Berhad/ OVERDICK

Position : Snr Planning Engineer

Company : Petronas Carigali Sdn. Bhd.

Address : Level 59 Tower 2, Petronas Twin Towers

Kuala Lumpur 50088 Malaysia

Project : Angsi Field Projects, Peninsular Malaysia

(Angsi B Gas, Angsi TCOT, and

AFUP GTG/Phase2 WIM)

Project : Besar A Platform (FEED/ DD, FID, EPC Execution)

Involvement in FEED Stage including Detail Design, FID until

EPC Execution and Implementation

Position : Executive 2 (Planning/Scheduling)

Project Controller/Snr Planning Engineer

Date : December 2011 - December 2014

Company : KAEFER Integrated Services Pty. Ltd.

Address : 8 Bradford Street, Kewdale WA6105, Australia

Client : KNS – KONIAMBO NICKEL SAS

Technip – Hatch Joint Venture

Project : Scaffolding Services for Koniambo Project

Kone, New Caledonia

Position : Snr Planning Engineer / QS

Date : October 2010 - May 2011

Company : AZDAMAN ENGINEERING SDN. BHD.

Address : No. 5A & 5B, Jalan SS 24/8, Taman Megah, Petaling Jaya, Selangor

Darul Ehsan, 47301 Malaysia

Seconded to : KNM BORSIG Services Sdn Bhd

: 15, Jalan Dagang SB4/1, Taman Sungai Besi Indah,

43300 Seri Kembangan, Selangor Darul Ehsan,

Malaysia

Client : ASEAN Bintulu Fertilizers Sdn Bhd

Project : Rejuvenation and Shutdown of ABF Plant

Position : Planning Engineer

Date : June 2010 - September 2010

Company : HERTEL SINGAPORE PTE. LTD

Address : 305 Alexandra Road, #05-18, Vantage Automotive Centre

Singapore 159942

Client : CB&I Lummus – Toyo JV.

Project : Insulation Works on ECC-SHELL HOUDINI PROJECT

Pulau Ular, Singapore

Position : Planning Engineer

Date : November 2008 - March 2010

Company : AZDAMAN ENGINEERING SDN. BHD.

Address : No. 5A & 5B, Jalan SS 24/8, Taman Megah, Petaling Jaya, Selangor

Darul Ehsan, 47301 Malaysia

Seconded to : OILFAB SDN BHD

: #2-2, Jalan SS 6/6 Petaling Jaya, Selangor 47301 Malaysia

Client : CPOC (Carigali PTTEPI Operating Company Sdn Bhd)

Project : JDA BLOCK B-17 Field Development Project (EPCC)

Engineering, Procurement, Construction and

Commissioning of 4 Wellhead Platforms

Position : Planning Engineer

Date : July 2007 - July 2008

Company : SARKU ENGINEERING SERVICES SDN. BHD.

Address(Malaysia) : 2nd Floor, Lot 806, Block 4, Bgn. Slipway MCLD, Piasau Industrial

Estate P.O. Box 1319, 98008 Miri, Sarawak, Malaysia

Site Address(India) : 1st Floor, SAGAR UDAY Plot No. F-3, Behind CIDCO Bhavan

CBD Belapur, Navi Mumbai – 400614 India

Project : Revamping of 26 Well Platforms for ONGC

Oil and Natural Gas Corporation

Position : Snr Planning Engineer

Date : January 2006 - April 2007

Company : PMC Ultra Mega Consultant Sdn. Bhd.

Address : #41, Jalan Rosmerah 3/1, Taman Johor Jaya,

81100 Johor Bahru, Johor, Malaysia

Seconded to : MMHE(Malaysia Marine and Heavy Engineering Sdn. Bhd.)

PLO 3, Jalan Pekeliling, P.O Box 77, Pasir Gudang, Johor, Malaysia

Date : October 2005 - January 2006

1. Project : (Tender) Angel Project – Fabrication of Topsides and Jacket/Piles

Client : Woodside Energy Ltd.

Position : Planning Engineer

2. Project : (Tender) Fabrication of Riser Holdback Anchor and Tether Clamp

Kikeh Subsea Pipelines/Risers EPCIC Project

Client : Technip Marine Malaysia Sdn. Bhd.

Position : Planning Engineer

3. Project : (Tender) Fabrication of Kikeh DTU/TAD Driven Piles

Kikeh Subsea Pipelines/Risers EPCIC Project

Client : Technip Marine Malaysia Sdn. Bhd.

Position : Planning Engineer

4. Project : (Tender) Fabrication of SCDR-A Jacket and Topsides

Client : Sarawak Shell Berhad

Position : Planning Engineer

5. Project : (Tender) Fabrication of Bunga Orkid Jacket and Bridge

Client : Talisman Malaysia Limited

Position : Planning Engineer

6. Project : (Tender) Fabrication of Semi-Submersible Platform - GUMUSUT

Client : Shell Texas

Position : Planning Engineer

Company : Petra Resources SDN. BHD.

Address : 19th Floor, Block B (Unit 6-7), Megan Phileo Avenue,

Jalan Yap Kwan Seng, 50450 Kuala Lumpur, Malaysia

Date : December 2004 - August 2005

1. Project : BSTAB 1&2 Rejuvenation Project

Sarawak Shell Berhad

Position : Planning Engineer

2. Project : GuE Host Tie-in at GuD and PaA Project

ExxonMobil Exploration and Production Malaysia Incorporation

Position : Scheduler / Cost Estimator

Company : Brunel Technical Services Pte. Ltd.

Seconded to : Kellogg Brown and Root – Halliburton

Address : Singapore

Project : Belanak Field Development Project - FPSO

Costumer : Conoco Phillips Indonesia Pte Ltd

Position : Electrical Commissioning Technician

Date : November 2003 - September 2004

Duties & Responsibilities :

1.Carry out pre-commissioning and testing of different electrical systems such as medium voltage and low voltage distribution systems including Essential/Emergency lighting, switchboards and transformers, and Un-interrupted Power Supply system.

2.Carry out isolations and de-isolations of motors and power supplies during the pre-commissioning stage.

3.Carry out the application of Mechanical Completion Check Sheets as prerequisites for the commissioning stage.

4.Carry out the troubleshooting and rectification works on the encountered electrical problems and its interface.

5.Carry out walk about inspections/checks and prepare punch list.

6.As-built drawings that doesn’t conform to the tested electrical system.

Company : Petra Resources SDN. BHD.

Address : 19th Floor, Block B (Unit 6-7), Megan Phileo Avenue,

Jalan Yap Kwan Seng, 50450 Kuala Lumpur,

Malaysia

Project : PaA to GuD FWS Pipe Line Host Tie-in Project

EMEPMI (Exxon Mobil Exploration Production Malaysia Inc.)

Position : Scheduler / Cost Estimator cum Field Planning Engineer

Date : December 2002 - April 2003

Company : Dayang Enterprise SDN. BHD.

Address : 2nd Floor, Block A, KSB Administration Building,

Kemaman Supply Base, 24007 Kemaman,

Terengganu Darul Iman

Seconded to : EMEPMI (Exxon Mobil Exploration Production Malaysia Inc.)

Address : Kompleks ESSO, 24207 Kemasek, Terengganu D.I.

1. Project : TCOT May 2002 Planned Shutdown - DOSH Internal Inspection

ExxonMobil Exploration and Production Malaysia Incorporation

Position : Planner /Scheduler Engineer

Date : January 2002 - May 2002

2. Project : Provision of Integrated Topside Maintenance Services

TCOT - ExxonMobil Exploration and Production Malaysia

Incorporation

Position : Planner /Scheduler Engineer

Date : September 2001 - December 2001

3. Project : TCOT August 2001 Planned Shutdown

ExxonMobil Exploration and Production Malaysia Incorporation

Position : Planner /Scheduler Engineer

Date : May 2001 - September 2001

Company : EEI CORPORATION

Address : Brgy. Sta. Maria, Bauan, Batangas

1. Project : San Roque Multipurpose Project – Miscellaneous Gates

Costumer : Ishikawajima-Harima Heavy Industries

Position : Planning Engineer / Fabrication Engineer

Date : July 2000 - May 2001

2. Project : Okinawa Kin Electric Power Plant - Modular Assembly Unit 1

Costumer : Mitsubishi Heavy Industries

Position : Planning Engineer / Fabrication Engineer

Date : September 1999 - July 2000

3. Project : Pampanga Delta Development Project – Steel Gates

Costumer : National Irrigation Administration / Kurimoto Ltd.

Position : Planning Engineer / Fabrication Engineer

Date : September 1998 - September 1999

Company : EEI CORPORATION

Address : Brgy. Sta. Maria, Bauan, Batangas

Project : Petron Refinery Expansion Project Group “B”

Costumer : Daelim Philippines Incorporation ( DPI )

Position : Planning Engineer

Date : December 1997 - September 1998

Company : EEI CORPORATION

Address : 188 E. Rodriguez Jr. Ave. Brgy. Bagumbayan

Quezon City

Project : HCC – 50 MW Diesel Power Plant Project

Location : Bo. Matictic, Norzagaray, Bulacan

Costumer : Trans – Asia Corporation Inc.

Position : Cadet Engineer / Quantity Tracker

Date : May 1997 - November 1997

EDUCATION :

College : BACHELOR OF SCIENCE IN INDUSTRIAL ENGINEERING

University of Batangas

Hilltop, Batangas City, Philippines

SPECIAL TRAINING / SEMINARS ATTENDED:

1.Offshore Safety Sea Survival and Helicopter Underwater Escape Training, Including EBS(Emergency Breathing System), Basic Fire Fighting, and First Aid CPR/EAR/AED

(SEQU Offshore Safety Sdn Bhd)

July 10 - 12, 2007 Expiry Date: 12July2010

2.Hydrogen Sulphide Competency Course

(Borneo Safety Training Services)

June 28, 2005 Expiry Date: 27June2008

3.Offshore Safety Sea Survival and Helicopter Underwater Escape Training

(Consist Safety Training Centre Sdn. Bhd.)

January 2 - 3, 2003 Expiry Date: 01Jan2006

4.Onshore Safety Training Course

TSTC (Terengganu Safety Training Center)

5.TCOT Planned Shutdown Safety Seminar

Onshore Safety Induction Seminar

Kompleks ESSO, Auditorium

6.Total Quality Management ( TQM ) Seminar

a)Introduction to ISO 9000

b)Basic Blue Print Reading and Estimating

c)Planning and Scheduling

7.PRIMAVERA - Planning and Scheduling

a)Basic on how to use Primavera Software in scheduling

b)Workshop on how to use the newly version P6 R24.1.0.48782

SPECIAL SKILLS:

1.0 Computer literate

1.1 Windows 11 Operating System

1.2 Apple Macintosh (MacOS)

1.3 Microsoft Office Professional Plus 2019

Microsoft Office 365 Pro Plus

1.4 Oracle - Primavera P6 Professional 25.4

1.5 Microsoft Project Planner 2010

1.6 Autodesk Navisworks Freedom

REFERENCES:

Available upon request

PERSONAL DATA:

Home Address : Blk 9 Lot 23 RoseApple St. Tamarind Grove,

Plantacion Meridienne, Brgy. Cumba Lipa City,

Batangas 4217, Philippines

Email address: **********@*****.***

**********@******.***

Age : 50 years old

Date of Birth : October 19, 1974

Place of Birth : Batangas City, Philippines

Citizenship : Filipino

Civil Status : Married

ERNESTO G. MANALO JR.



Contact this candidate