William H. Jinks
Address:
RR#*, Box **, Site * Phone Numbers:
BUSBY, AB Cell: 780-***-****
OCT 2014 – 2024
Company: CNRL (FT Services)
Position: T/A Planner (Piping / Mechanical)
Responsibilities:
Develop work packages with safety as the paramount concern.
Work in conjunction with engineering to develop workable, efficient scopes of work.
Work with SCM to ensure material is procured in a timely fashion and ordered as per spec and engineering requirements
Development of TCN’s, attend execution meetings as required.
Excellent communication skills which allows the integration of execution SCM, and engineering element owners.
Prepare individual work scope labor/man-hour estimate packages.
Prepare "what if" scenarios as directed by the Turnaround Manager. Actual Turnaround:.
Identified replacement and spare-part requirements for equipment .
Maintained a continual update of the planning schedule to accommodate and to reflect additional work, or scope changes.
APRIL 2013 – OCT 2014
Company: Suncor Oilsands (Transfield Asset Management Services) Position: T/A Planner (Piping)
Responsibilities:
Developed work packages with safety as the paramount concern.
Work in conjunction with engineering to develop workable, efficient scopes of work.
Work with SCM to ensure material is procured in a timely fashion and ordered as per spec and engineering requirements Development of TCN’s, attend execution meetings as required.
Excellent communication skills which allowed the integration of execution SCM, and engineering element owners.
Prepared individual work scope labor/man-hour estimate packages.
Maintained a continual update of the planning schedule to accommodate and to reflect additional work, or scope changes
Developed TCN tracking process to ensure all found work is executed and cataloged correctly for historical purposes.
2010-2013
Company: Suncor Energy (Jacobs Industrial Services) Position: T/A Planner (Piping)
Responsibilities:
Developed work packages with safety as the paramount concern.
Work in conjunction with engineering to develop workable, efficient scopes of work.
Work with SCM to ensure material is procured in a timely fashion and ordered as per spec and engineering requirements
This included the development of TCN’s, attend execution meetings as required,
Excellent communication skills which allowed the integration of execution SCM, and engineering element owners.
Prepared individual work scope labor/man-hour estimate packages.
Prepared "what if" scenarios as directed by the Turnaround Manager. Actual Turnaround
Identified replacement and spare-part requirements for equipment, and prepares the requisitioning documentation.
Maintained a continual update of the planning schedule to accommodate and to reflect additional work, or scope changes.
2008-2010
Company: Kinder Morgan Tank Farm (Aecon)
Position: General Formaan (Piping)
Responsibilities
. Installation of piping for valve control vault
Maintained a continual update of the planning schedule to accommodate and to reflect additional work, or scope changes
This included the development of TCN’s, attend execution meetings as required,
Excellent communication skills which allowed the integration of execution SCM, and engineering element owners
2007-2008
Company: Aecon- Nexen Longlake
Position: General Foreman
Responsibilities:
Hydro-testing of various piping systems throughout plant site
Post hydro punch items and commissioning
Ensure all personnel performed work in a safe and efficient manner and followed all companies policies and procedures to ensure a safe working environment. 2005-2006
Company: Jacobs- Suncor Oilsands
Position:General Foreman
Responsibilities:
Organization and implementation of piping rework, in and around Plant 52 Coker s Area during the 2005 TA/C305 rebuild event.
Ensure all personnel performed work in a safe and efficient manner and followed all companies policies and procedures to ensure a safe working environment.
Hydro-testing of various piping systems throughout plant site
Post hydro punch items and commissioning
Ensure all personnel performed work in a safe and efficient manner and followed all companies policies and procedures to ensure a safe working environment. Education:
Victoia Composite High (Grade 12)
Nait Campus –Journeyman Pipefitter
Member of Local 488 since 1980
Skilled in SAP applications
Excel
Word
. Skilled in MAXIMO applications
Personal Information:
Strong organizational skills
Strong leadership skills
Able to prioritize tasks
Excellent liaison and communication skills
References:
Available upon request