June 2011: First aide PRC Training, Fire safety Attendance Certificate ( PETROFAC )
August 2011: Flange Management, permit to work ( PETROFAC-EPC)
August 2011: Risk assessment ( PETROFAC-EPC)
August 2008: HSE training course at GB Groupement Berkine “ association SONATRACH & ANADARKO” ( PPE, JOB SAFETY ANALYSE, BEHAVIOURAL SAFETY, REPORT OOPS).
October 2002 : piping and pipeline perfectionement at IAP « Algerian Petroleum Institute »
June 2003 : doing the market research at LTD KENEA INDUSTRY & SERVICES .
Piping Estimator,
.4. SKILLS
January 2002 : TOEFL -TEST English Total SCORE : 457 TWE: 3
June 1998 :one year’s study at foreign language institute ( English at Constantine University).
July 1996 : Constantine University, Mechanical Institute
Degree: Mechanical Engineer Option : Energetic
September 1991 : Mathematical Baccalaureate
5. LOGICIEL
MS PROJECT. Planning bar for detail of job and duration for each item.
MOUSSAYER.. logiciel for estimation project [ price cost, man hour…].
AUTO CAD 2009. logiciel for industrial drawing, good for mechanical engineer, isometric
5.1 . INFORMATIQUE
WORD, EXCEL, C++, WINDOWS, STUDIO MAX 3D ……
6. JOB
MECHANICAL ENGINEER, PIPING SUPERVISOR –PIPELINE SUPERVISOR
•Review of PTW/TBT prior starting activities and ensure continuous monitoring
• Interpretation of DWG, Isometric and PID, standard and specification
•Follow up of welding activities, checking of WPS, Welding Map and others and ensure continuous monitoring
•Review ITP’s and ITR’s
•Review procedures and method of statements WMS
•Reporting on daily/Weekly basis
•QC control specifications during construction and monitoring ( Welding MAP)
•Follow up of piping, pipe support prefabrication, erection at site and respect construction norms
•Follow up of quality standard, and HSE standard
•In charge of safety (HSE) until completion of the work, monitoring and ensuring good HSE practices ( including housekeeping), and following procedure including safety observation schemes
•Management Flanges Tightening ( Dynamometric Key, Torque Machine, Tensioning Machine)
•Completion mechanical, punch list and walk down
•Hydrostatic Test
•Air Blowing Test
•Flushing Test
•Leak Test
•Re-instatement
•Preservation
•Follow up Valves Repair and Testing ( Seat Testing, Shell Testing)
•Follow up Safety Valves Calibration
•Hookup (Offsites Facilities)
•Shutdown and Maintenance
7. EXEPERIENCE PROFESSIONNELLE 14 YEARS
February 2022 to January 2023.
Job: piping &pipeline supervisor
Firm: GTFT
PROJET: erection new spools for 2 turbines, & some modiffecation at gathering systems.
August 2019- August 2020
Job: piping & pipeline supervisor
Firm: SONATRACH
Project: Tinhert field devlopement project
September 2017- Janauray 2018
Job: Hydrostatic Supervisor- CPF
Firm: Groupement Touat Gas
Project: Touat gas Developement
November 2016 . june 2017
JOB Process Commissioning Supervisor (off Site)
Firme ; Groupement Reggane
Project : Reggane Development Project
Job : Rig up,line up, markupPID, Inerting systme,flowline, trunkline, export line, manifolds, hydraulic line WHCP, HP leak test with nitrogen, purgin and soon. Pressuring and start up, More than 500 Km differnet diameter (8,12,16,24,30) inch
November2015 to Mai 2016
JOB field engineer construction
FIRME SONATRACH, BP
PROJECT . Train 03.
February 2014 –April 2015
JOB Piping & Pipeline Supervisor
FIRME CEPSA ; SONATRACH
PROJECT . BMS Project.
Jun 2013
JOB Process Commissioning Supervisor ( Gas Plant)
FIRME JGC_ CORPORATION
PROJECT . GASSI TOUIL PROJECT.GAS PLANT
TACHE commissioning, inerting, drying out, gas in overall recycle plant, feed gas regeneration compressor, …..
November 2010 to December 2012
JOB Piping Supervisor
FIRME PETROFAC-EPC
PROJECT . EMLERK,CPF.
TACHE ( Isometric, spooling, site modification, daily report for « visual inspection, welding, traceability,Punch list, pre-commissioning, hydrotest……)
OCTOBER 2009-MAY 2010
JOB QA/QC Piping & Pipeline
FIRME OGEC “Ouiss Group Engineering & Contracting”
PROJECT . GAZODUC GK3, Ø48"Export 300Km.
TACHE ( Isometric, spooling, welding, daily report for « visual inspection, welding, traceability, piping book, pipeline book, coating, NDT request RT & PT, Punch list, backfilling, Tie In, Crossing Road, Crossing Wadi hydrotest, …)
August-2008-Jan2009
JOB Piping Supervisor, pipeline supervisor
FIRME ENGTP « National Firm for Great Work of Petroleum Construction »
PROJECT . HBNS/GB Sub Surface Well Head Connection ( oil well production, water injection well, Gas injection well, water dilution well, Manifold and Junction, new trunk line …..)( stringing, bending, welding, open tranche, coating, lowering,backfilling, hydrotest,…) for account SONATRACH-ANADARKO.
TACHE ( Isometric, spooling, welding, site modification, punch list, pre-commissioning, commissioning) for account SONATRACH-ANADARKO.
September 2007- july 2008
JOB Piping Supervisor
FIRME ENGTP « National Firm for Great Work of Petroleum Construction »
PROJECT . RKF Upgrade extension of central processing facility, with addition for tow compressor .
Protection the plant [Balloons,Vessels, Tank, Compressors, Pumps, burners, heat exchanger, turbine, .] with FFS ; Fire fighting system and water spray system, with air detection system .
TACHE piping erection, installation of statics equipment ( colone,, heat exchanger, vessles, … ( Isometric, spooling, welding, site modification, punch list, pre-commissioning, commissioning) for account SONATRACH-CEPSA
January 2007
JOB Piping Supervisor
FIRME ENGTP « National Firm for Great Work of Petroleum Construction »
PROJECT . Fire Fighting System & Water Spray System for Tank Storage « electrical cable detection » with PONTICELI for fourth PUMPS STATION,SP1 ;SP2 ;SP3,SP4. customer SONATRACH.
TACHE ( Isometric, spooling, welding, site modification, punch list, pre-commissioning,) for account SONATRACH-
January 2006
JOB Chief of Site
FIRME KIS « Sarl Kenza Industrie et Services »
PROJECT . Construction Work welding and assembly Fire Water network
Hand blasting and paint work for three sphere Customer NAFTAL
TACHE Weekly Situation and flowing of each job description. Coordination work, organization and responsible in area ' personnel and material management, salary and leaves
Mars 2005
JOB Pipeline Supervisor HYDROSTATEST
FIRME KIS « Sarl Kenza Industrie et Services »
PROJECT . DOG1 -OLEODUC -Ǿ 20
TACHE mobilisation for humain and materiel
Hydrosttest supervisor (Cleaning, gauging, filling, dewatering, pressuration
January 2004
JOB Pipeline Supervisor
FIRME KIS « Sarl Kenza Industrie et Services »
PROJECT . HBNS/GB Sub Surface Well Head Connection ( oil well production, water injection well, Gas injection well, water dilution well, Manifold and Junction, new trunk line …..)( stringing, bending, welding, open tranche, coating, lowering,backfilling, hydrotest,…)
TACHE (Isometric, spooling, welding, site modification, punch list, pre-commissioning, commissioning) for account SONATRACH-ANADARKO
January 2001-2003
JOB : piping supervisor
FIRME. ENGTP « National Firm for Great Work of Petroleum Construction»
PROJECT . ISG –IN SALAH GAS - CPF -central procession facility
TACHE Responsible for one Train, piping erection, installation of statics equipment ( colone, heater, heat exchanger,vessles,, …), ( Isometric, spooling, welding,site modification, punch list, pre-commissionning, commissionning) for account SONATRACH-BP.
September 1999 October 2000
JOB : piping supervisor
FIRME. ENGTP « National Firm for Great Work of Petroleum Construction»
PROJECT . BOOSTING STATION -Hassi EL rmel
TACHE piping erection, installation of statics equipment ( colone, heater, heat exchanger,vessles, ballon, …), ( Isometric, spooling, welding,site modification, punch list, pre-commissionning, commissionning) for account SONATRACH-BP.
September 1998 jun 1999
FONCTION Teaching
TECHNICO-SCHOOL IBNE BADIS
TACHE « Metal construction, technical drawing
8. LANGUAGE SPOKEN
Arabe, English, French
9. DATA INFORMATION
Military service: clear
Driving license: light
Observation
1) Availability period/ IMMEDIATELY
Total Experience: More Than 13 Years
Current Location: ALGERIA
Visa/passport Status : Still Availed Until .October 2029
Current Designation: ALGERIA
Professional References: Mechanical Supervisor, Piping Supervisor, Pipeline Supervisor
Sr. No. Name Designation Company Experience Contact Number Location
1. PETROFAC / 021891553 - tour ABC, 02 étage, El Mouhamadia
2. OGEC “Ouiss Group Engineering & Contracting ; fax 213-***-**-**-**/64
3. ENGTP « National Firm for Great Work of Petroleum Construction, Fax 213*********
4. KIS « Sarl Kenza Industrie et Services, Fax 213-*********
5. ENGTP « National Firm for Great Work of Petroleum Construction, Fax 213*********