Post Job Free
Sign in

Operations & Supply Chain Leader in Manufacturing

Location:
Rockville, IN, 47872
Salary:
60000
Posted:
November 21, 2025

Contact this candidate

Resume:

George E. Ames Jr.

***** * *** *

Rockville, IN *7872

765-***-****

Cell: 765-***-****

********@*******.***

SKILLS SUMMARY

Extensive planning and scheduling experience in multiple environments.

Developed two successful cycle count programs.

Lead position in MRP installation at two separate companies.

Lead role in JIT project which realized a 70 % reduction in WIP.

Practical engineering experience (Industrial, Project).

Supervisory positions including Materials Manager, and Stockroom Supervisor.

EDUCATION/TRAINING

Ball State University Muncie, IN

Bachelor of Science, Political Science August, 1976

Vincennes University Vincennes, IN

General studies

Fraternity president…remained active

on alumni board for ten years.

Maynard time study and cost reduction program. CTS supervision. SPC courses at both Keene and McGill. Xcellence Problem Solving, Oliver Wight MRP and Reed Group MRP II training. APICS member. Microsoft Office Suite 2010

EMPLOYMENT EXPERIENCE

Steris Corporation December, 2022 to

December, 2023

Senior Inventory Analyst

Ran cycle count program. Investigated discrepancies, conducted detailed review of location accuracy. Participated in activities relevant to a start up operation.

Ascena Retail Group January, 2019 to

September, 2019

Unit Processor

Primary job was replenishing customer shipments into Ascena stock. Also processed returns, and filled in for the packing department.

Jadcore Terre Haute, IN August, 2014 to

December, 2018

Group leader – baleing

Supervised 14 employees. Ensured good production levels and adherence to safety rules. Set several monthly records, with a 34% overall increase from 2017.

Order picker

Pull and stage orders for shipment. Load and unload trucks. Perform cycle counts.

Walmart Crawfordsville, IN August, 2012–August 2014

Receiving associate

Checked product into inventory from outside vendors, UPS, Fedex, ect., using electronic scanners. Also occasionally worked on the floor stocking.

Horner APG Indianapolis, IN June, 1999 – January, 2011

Electronics (PLC’s)

Materials Planner

Reviewed MPS and MRP plans using Epicor software. Adjusted schedules to ensure production to forecast. Created appropriate safety stocks for low usage items. Participated in forecast review, and oversaw cycle count program. Worked with marketing to schedule product obsolescence.

Extensive database clean up over first year…primarily bom’s

Initiated cycle count program, which eliminated year end inventory

Managed contract manufacturers, both domestic and off shore.

Berg Electronics Franklin, IN August, 1997 – May, 1999

RF connectors

Production Planner

Planned finished good and piece part levels for two largest product families, using exception based MRP system (MFG PRO). Acknowledged all sales orders prior to release.

Tasked with troubleshooting information flow issues between three plants.

(three different software platforms)

SAI, Inc. Indianapolis, IN March, 1996 – August, 1997

Furniture manufacturer/installation June 1992 – November, 1993

Production/Material Planner

Scheduled work into shop after reviewing customer orders, utilizing both Symix and Lotus. Generated various reports including month end production summary, and forecast. Purchased all steel components. Backed up production manager.

Dormeyer Industries Rockville, IN Nov, 1993 – March, 1996

Solenoid manufacturer

Materials Manager

Member of MRPII and ISO-9000 Core Teams, which coordinated installation efforts. Leader for Inventory Accuracy and Master Scheduling teams. Supervised all stockroom personnel. Responsible for all aspects of inventory control. Participated in software selection for new system.

Subaru-Isuzu Automotive Lafayette, IN Oct, 1990 – February, 1992

Through Manpower

Diesetter

Placed and rigged dies on transfer presses in stamping department. Temporary direct labor position.

McGill Manufacturing Monticello, IN Oct, 1983 – August, 1990

Bearing Manufacturer

Planner

Promoted to planner after three years. Developed the production plan for one-half of our product lines. Quoting, maintaining bills of materials, and frequent interaction with sales. Extensive involvement with JIT program, which realized a 70 % reduction in WIP.

Scheduler

Responsible for prioritizing the workload for various departments in an MRP environment (IPICS…IBM 360). Maintaining shop floor control system, expediting, and information exchanges necessary to ensure product flow. Handled bulk of inside purchasing.

Had to build bridge back to production departments. Did so primarily by giving the supervisors some autonomy over their schedules. Significantly reduced machine backlogs.

Keene Products Monon, IN March, 1979 – Oct, 1983

Metalworking facility

Project engineer

Complete development of product lines, including quoting, tooling, and manufacturing processes. Coordination between customers, other plants, and vendors.

Stockroom supervisor

Developed procedures and disciplines for running an MRP system. Assumed duties of a disordered department…within six months achieved 95 % inventory accuracy, which improved to 98 %. Nine people reported to me, including cycle counters.

Industrial engineer

Cost reduction was the core of this position. Developed method to pack product directly off paint line.



Contact this candidate