EXPERIENCE
MJM Property Developers Pvt. Ltd., Deputy Manager
(Projects)
Projects:
(A) MJM Residency (Residential building; B+G+8)
(B) Boundary wall development (500-acre land; 24,500 rft & 8-acre land; 2,400 rft)
(C) Residential Villa (500 Sq. yds G+1 at Beach Front; Pre-Fab Structure with interior finishes) Duration: Sep 2022 up to Present
The Court Group of Companies, Project Engineer
Projects:
(A) The Court Heights (Sales Office and Model Apartments)
(B) The Court Skyscraper (Sales Office and Model Apartment)
(C) The Court Twin Towers (2B+G+19)
Duration: Mar 2021 up to Sep 2022
HMA Building & Maintenance Pvt. Ltd., Project Engineer Projects:
(A) Commercial Building in DHA Phase VIII Karachi. (B+G+5)
(B) Commercial Building in DHA Phase VI Karachi. (B+G+4) Duration: Dec 2017 up to Feb 2021
ENGITITAN (Pvt.) Ltd., Asst. Site Engineer.
Project:
Akber Arcade, Islamabad. (B+G+6)
Duration: May 2015 up to Nov 2017
HASSCON SERVICES, Trainee Engineer.
Project:
Reverse Osmosis Unit Sub – Station FFBL, Karachi (Feb 2015 up to May 2015) CORE
COMPETENCIES
1. Project scheduling and workforce deployment planning and management.
Created realistic project schedules aligned with scope and milestones
Allocated manpower and equipment effectively based on workload
Anticipated resource constraints and takes proactive action
Coordinated daily and weekly planning meetings with the supervisors downwards and Project Manager and Head Office upwards.
2. Quantity take-offs
Skilled in studying drawings, BOQs and general specifications.
Prepared material quantity take – offs and controlled wastages.
Monitored material consumption against calculated quantities.
Collaborated in Procurement process to avoid bottlenecks and delays. 3. Site Execution and Coordination
Ensured daily work execution is aligned with planned schedule and meeting quality standards.
Addressed clear instructions and technical guidance to field staff and third party contractor.
Implemented best possible solutions to challenges faced on – site during execution.
Mentored Site staff on efficient working and harmonized smooth work – flow.
Resolved conflicts arose during works between client and contractor. 4. Quality control and HSE Compliances
Conducted regular inspections to maintain quality of material and workmanship by keeping all stakeholders in loop.
Implemented and guided HSE protocols to all teams working and visitors and ensuring their compliance.
Implemented practices of HSE while working on special tasks to mitigate risks during work and preventive measures to be taken at time of emergency. 5. Progress Monitoring and Reporting
Monitored work progress against work schedule and identified critical activities using Critical Path Method.
Drafted daily and monthly progress reports and assess progress and conditions falling under force majeure.
Communicated in clear ways with all stakeholders (e.g. clients, contractors, suppliers, in- house team members etc.)
Maintained historical data, Snaps of work and relevant documents as a reference for future.
GENERAL
RESPONSIBILITIES
Daily site investigation, supervision, task scheduling, reporting and drawings review.
Project planning (on weekly and monthly basis) and cash flow management (as per stage of work).
Contracts management of sub-contractors.
Affiliation with consultant on quality control and assurance for construction material and works.
Material and cost estimation as per BOQ and quantity take offs.
Command over various construction materials and procedures particularly Architectural columns (Designed for building elevation; Modern architectural design), Post-tensioning cables (used in all slab and beams), Cast in-place concrete piles (for better foundation performance under weak load bearing capacity of soil) and Arches and Niches (Designed for building elevation; post-modern architectural design).
Crew management for different trades of work (for structural works).
Foundation & Columns layout, levels verification, shoring/shuttering fixing, steel erection and concrete pouring (Structural works).
Supervision of masonry, plaster, flooring, paint, electrical, plumbing, ACP cladding, carpentry and glass cladding (Finishing works).
Preparing Bar Bending Schedules, formwork measurements, running bills of contractors and work timelines.
Execution as per drawing (of specialized structures including internal water bodies, swimming pool and roof garden).
Conducted all structural, finishing & specialized works under strict Safety Regulations.
Preparation of daily and monthly progress reports. INTERNSHIP
PARAGON Constructors (Pvt.) Ltd.
Internee, IBA AMAN Tower, Saddar Campus, Karachi Dec 2013 SOFTWARE
WIDE (Well
Interference and
Drawdown
Evaluation)
ETABS (2013)
(Intermediate)
SAP 2000 17
(Intermediate)
MS – Office 2013
SAFE 2015
AutoCAD 2010 MS Project 2013 Revit Architecture
EDUCATION
Masters’ in Engineering Management (MEM; Construction Management) – NED University of Engineering & Technology, Karachi (In- progress) 2025-Present Bachelors in Civil Engineering (B.E) - NED University of Engineering and Technology, Karachi CGPA: 3.309/4.0 (Completed) 2010-2014
FINAL YEAR PROJECT:
“Groundwater Modeling and its Application”
Studied Groundwater Hydrology in detail with emphasis on pumping optimization techniques and behavior of confined aquifer against varying discharge at different stress periods. Optimization was carried out to estimate optimal pumping without compromising on aquifer properties.
RECOGNITION AND
ACHEIVEMENTS
Registered as Professional Engineer with Pakistan Engineering Concil
Attended training session on “Level 3 Leadership (Care and Growth Model)” conducted by Waterlink Group of companies under Mr. Shahbaz Aftab (Human Excellence Consultant at Schuitema)
Attended training session on “The Power of Stillness” conducted by Waterlink Group of companies under supervision of Mr. Najeeb Ali (GM Sales & Operations)
Attended a workshop on “Behavior of Different Material in an in – Fill panel with relation to Seismic effects” by Dr. Humberto Varum.
Attended 1st International Workshop on “Sustainable Quality Improvement in Pakistani Construction Industry” with collaboration of Florida International University and Auburn University
Mini project on Design of Two – story Bungalow in 3rd year of my university. LANGUAGES
Fluent in English, Urdu (major) and Arabic, Spanish, Swahili (minor). INTEREST AND HOBBIES
Swimming Public speaking Reading
Travelling Internet surfing
REFERENCE
Available on request.