A responsible field position in the construction industry that will offer an opportunity to support a safe environment while improving efficiency, harmonious work environment and profitability. An opportunity where I will be able to impact safety, productivity and practice my goal of treating every job as if the results affected my pocket. This will be achieved by practicing MBWA (management by walking around), attending toolbox meetings, coordinating site meetings, monitoring schedule, costs and EWO management. Maintaining dialogue with subcontractors, management, and the customer. This position should provide me with an opportunity to further develop my technical, managerial, and professional skills.
Education and Languages
BSME University of Washington 1980
Master Electricians License 2002
Well versed in conversational Spanish
A summary of experiences includes:
Gas Turbine and Combined Cycle Installation and Start-up
Power Plant Relocation
Power Plant Conversions Modifications & Upgrades (CM&U’s)
oControl System Upgrades
oFuel Conversions
oPower and Efficiency Enhancements
Commercial Construction
Residential Construction
Residential Subdivision Infrastructure
Technical Sales
Environmental Controls / Air Monitoring
SWPPP and Environmental Permit Monitoring/Oversight
Job History
40 Years’ experience in the construction industry, for the last 35 years all positions were in decision making roles, prior assignments were as either, Construction Manager, Site Manager, Startup manager, PM. All positions focused providing a safe conclusion to the project for both the work force, equipment, and the environment. Adherence to industry standards, schedule maintenance and cost control were daily endeavours.
.
Specific assignments and responsibilities as follows;
November 2023 to February 2024 RWE
Construction manager for installation of 200 MW Substation and High Yard in Bakersfield California for a BESS and 1300-acre solar plant.
July 2023 to September 2023 Cabot Industries
Construction manager for the Installation of oxidizer for carbon black exhaust from existing process line Ville Platte Louisiana.
March 2023 to June 2023 Wellhead Electric
Construction Manager for 70MW battery storage project in Anaheim California. Installed piles for both battery cubicles and sound wall. Installed MV, fire protection and fibre conduits. Installed new MV breakers for additional power input to existing plant.
Oct 2022 to March 2023 HDR
Construction Manager for Battery Enhancement Manufacturing Facility in Moses Lake Washington
June 2022 to Oct 2022 HDR
Construction Manager for 18 reciprocating gas fired engines in Montana.
June 2021 to Jan 2022 Tex Gen
Project Manager for the relocation of two GE frame 6 gas turbines. Completed the installation of the plant foundations. Contract negotiations, schedule development and administration.
June 2020 to Sept 2020 Dominion Energy
Construction Manager for new Solar Construction Projects. Worked in Virginia, and South Carolina on Nextracker 200 MW, ATI 200 MW, and FTCC systems 12 MW.
February 2019 - November 2019 GCMS
Director of Sales Mexico,
Responsible for securing maintenance contracts for the power industry, maintaining customer contact, writing proposals, and follow up site visits.
February 2018 – November 2018 Rengen Mexico City
Project Director for 400-million-dollar new power plant construction with site refurbishment project. New Siemens GT, HRSG, replacement of existing Steam Turbine. Refurbishment of Alstom GT 11 units, repair of cooling tower, additional boiler feedwater pump, numerous smaller improvements. Successfully negotiated all major supply, equipment and engineering contracts and off take contract. Project shelved due to lack of funding.
June 2015 – September 2017 Shanahan Engineering
Site Manager responsible for a 30 million dollar,180 MW project consisting of gas fuel conversion, controls retrofit, water injection, unit overhaul and gen rotor rewind for 3 Pratt & Whitney FT4 gas turbines at Alliant Energy – Sutherland station.
April 2015 – June 2015 Shanahan Engineering
Site Manager responsible for two installations of Siemens SGT500 Mobil units. Project Included all tie ins for high voltage integration, gas fuel start assists, and air compressor system at Vizcaino and Santa Roselia Baja California for CFE Mexico
January 2015 – April 2015 Shanahan Engineering
Head honcho for construction completion, new control integration, completion of 138/13.8 KV high yard construction and plant completion and commissioning of relocated Siemens 501 GT.
September 2013 – November 2014 Quiwan Group
Project Director for new 750 MW combined power plant in Kurdistan. Responsible for equipment selection, subcontractor contract negotiations, off take contract negotiations. Project sold prior to implementation.
February 2013 – September 2013 Alghanim Industries
Pre-commissioning engineer for construction completion thru steam blows for a 400 MW Siemens combined cycle expansion, with two 200 MW ST, 5 new HRSG’s, two new saltwater cooling towers, sea water intake, cooling water blow down systems, demineralized water plant and storage. Included new control rooms and control system integration.
June 2012 – November 2012 TTS (Turbine Technology Services)
Site manager for the Installation of 4 relocated Westinghouse 501 gas turbines, complete unit refurbishment, auxiliary repair, dual fuel conversion, new controls, green field site.
Founded KR Incorporated February 2002 to current Self Employed
Completed construction for infrastructure of two 50 Acre subdivisions in Dickenson Texas including sewer, water, storm sewer, bulkheads, SWPPs well as streets.
Self-Performed the construction of.
Installation of 125 MW emergency power in Tanzania
2500 sq. foot bank for Mainland Bank Dickenson Texas
28 Duplexes New Orleans
36-unit Apartment complex New Orleans
20 Single Family Homes Louisiana
Project development of power projects:
oDe-salination, power and chilled water for 200,000 square foot combination commercial/residential towers in United Arab Emirates
o200 MW combined cycle power plant Pattoki Pakistan
o300 MW combined power plant in Ivory Coast and Ghana
oPlant development in Angola, Swaziland, Mozambique
o50 MW plant in Ras al-khaimah UAE
oCoal Power Plant and lignite mining project Swaziland
o200 MW gas power plant in Mozambique
Unfortunately, all remained unfunded.
July 1988 – February 2002 TTS (Turbine Technology Services)
Responsible for the relocation and CMU’s (Conversion Modifications & Upgrades) on over 65 Gas turbines. In many cases was responsible for the sale as well as the negotiation and implementation of the project.
June 1980- July 1988 General Electric Company
Start-up engineer, commissioning engineer, responsible for over 50 new unit start-up and numerous control system and excitation system tuning. Spent 5 years overseas in Venezuela, Caribbean, Saudi Arabia, Indonesia, Egypt etc.